ML20042B060
| ML20042B060 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 01/09/1975 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | William Cahill CONSOLIDATED EDISON CO. OF NEW YORK, INC. |
| Shared Package | |
| ML20042B061 | List: |
| References | |
| NUDOCS 8203240515 | |
| Download: ML20042B060 (2) | |
See also: IR 05000003/1974017
Text
.
_ - _ _ _ . _ . . _ _ .
.
..._o.
.
._
_
_g.
.- .-. __ _ _ _
3._,..
.
.
...
..
UNITED STATES
'
,?[fK i
ATOMIC ENERGY COMMISSION
,,,f.
DIRECTOH A TC OF HEGULATOH V OPF.H ATIONS
j
'I
HCGlON t
gs
/
I 'I D' *,b
631 P ARK AVENUE
1
.
- 7
KING OF PRUSSI A, PENNSYLVANI A 19406
"! dig g 6\\
JAN
9 1975
Consolidated Edison Company of New
License Nos. DPR-5
York, Inc.
Attention:
Mr. W. J. Cahill, Jr.
Vice President
Inspection Nos. 50-03/74-17
4 Irving Place
50-247/74-17
00-28f>/ 74-25J
Gentlemen:
This refers to the inspection conducted by Dr. Gallina of this
office on December 16 and 17, 1974 at Indian Point Nuclear
Generating Facility of activities authorized by AEC License
Nos. DPR-5, DPR-26 and CPPR-62 and to the discussions of our
findings held by Dr. Gallina with Mr., Stein and other members
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Regulatory
Operations Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews uith personnel,
and observations by the inspector.
Our inupcetor also verified the steps you had taken to correct
the violations brought to your attention in a letter dated June 24,
1974, following our last inspection.
We have no further questions-
regarding those matters.
Within the scope of this inspection, no violations or safety
items were observed.
.
,
l
In accordance with Section 2.790 of_the AEC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
AEC's Public Document Room.
If'this report contains any information
that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to
'
this office to withhold such information from public disclosure.
Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be
,j
placed in the Public Document Room.
t
!
.
8203240515 750109
PDR ADDCK 05000003
O
,
~.
. .. -
. _ - . _ - .. . . .-
. .
- -. .
-
-
-_ -
-
-
-
.-
.
1
-
.
<:
.
Consolidated Edison Company of New York, Inc.
-
-2-
f
No reply to this letter is required; however, should you have any
i
questions concerning this inspection, we will be pleased to discuss
them with you.
l
Sincerely,
b.
.
,
c,L M L
'
mes P. O'Reilly
Di ector
Enclosure:
RO Inspection Report Nos. 50-03/74-17, 50-247/74-17 and 50-286/74-25
cci
A. E. Upton, Esquire
A. Kohler, Resident Construction Manager
W. Stein,!!anager, Nuclear Power Generation Department
S. Cantone, Chief Engineer Unit 3
J. Makepcace, Chief Engineer Unit 2
A. Z. Roisman, Counsel for Citizens Committee for Protection of the
Environment (Without Report)
bec:
R0 Chief, FS&EB
RO:llQ .(4 cpys of ltr. , 5 cpys of report)
RO Files
Central Mail & Files
DL (4 cpys of ltr. ,13 cpys of report)
RS (1 cpy of ler., 3 cpys of report)
Local PDR
State of New York
,
Reg Reg Reading Room
R0 Directors (II, III, IV)(Report Only)
A. Z. Roisman, Counsel for Citizens Committee for Protection of the
Environment
l
.
$
.
k
=
.
, , , , - .
m
m__ . . ,
-m-
, -
.e
.~
.n-
---
e