APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT I DATE 03/04/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 FEBUARY 82 DAY AVG.. DAILY POWER LEVEL-DAY.
AVG. DAILY POWER LEVEL ~
(MWE-NET )
(MWE-NET)
I 74 8.
I7 697.
2 748.
18 184.
3 745.
19
-9 4
742.
20
-2.
5 608.
21 431.
]
6
-7.
22 56I.
7-
-4.
'23 650.
8
-6.
24 46.
9
-6.
25 710.
10
-6.
26 691.
II
-11.
-27
.752.
12
-1I.
28 73I.
I3 14 112.
4 15 599 i
16 641.
T
- l. 16 - 8 g
O R-
h OPERATING DATA' REPORT DOCKET NO. 050-0325 DATE 03/04/82 COMPLETED BY FRANCES HARRISON.
TELEPHONE 919-457-9521-i OPERATIllG STATUS l.
UNIT NAMES BRUNSWICK UNIT I I NOTES I
- 2. REPORTill0 PERIOD: FEBUARY 82 I
I
- 3. LICEllSED THERMAL POWER'(MNT): 2435 I
I 4.
NAMEPLATE RATING (GROSS MWE):.867.0 I
I
- 5. DESIGN ELECTRICAL RATillG (NET MWE): 821.0 I
.I 6.' MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPEllDABLE CAPACITY (NET MWE): 790.0 8... IF CHANGES OCCUR IN CAPACITY RATIflGS (ITEMS 3 THRU 7) SINCE.LAST REPORT, GIVE REASONS
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASOtiS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE II. HOURS IN REPORTING PERIOD 672.0
.1416.0 43417.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 464.3 1208.3 29473.6
- 13. REACTOR RESERVE SIUTDOWN FOURS 0.0 0.0 1647.1
- 11. 5.5 27695.1
- 14. HOURS GENERATOR Ori LINE 411.5 5
- 15. UNIT IrESERVE SHUTDONil HOURS
'O.0
-0.0-0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 836342.2 2525336.4 56943143.0
- 17. GROSS ELECTRICAL EllERGY GENERATED (MWH) 275486.0 814350.0 18815555.0
- 18. NET ELECTRICIAL ENERGY GENERATED sMWH) 264567.0 786653.0 18090144.0
~
- 19. UNIT-SERVICE FACTOR 61.2 81.6 63.8
- 20. UNIT AVAILABILITY. FACTOR 61.2 81.6 63.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 49.8 70.3 52.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 48.0 67.7 50.8
- 23. UNIT FORCED OUTAGE R ATE 21.1 8.7 21.5 j
- 24. - SHUTDOWNS SCHEDULED DVER NEXT 6 MutiTHS (TYPE, DATE, AND DUR ATIOti 0F EACH):
l l
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 0
- 26. UNITS J TEST STATUS (PRIOR TO C01MERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY l
COMMERICIAL OPERATION 1.16 - 9
A APPENDIX 5
Docket No:
050-325 Unit:
Brunswick No. 1 Date: February 1982 Completed By: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO.1 Brunswick Unit No. 1 operated at 61.2 percent availability factor for the month of February with a 49.8 percent capacity factor. There were two off-line outages this month. They are detailed in Appendix D, the unit shutdowns and power reduction log.
There are 476 BWR and 160 PWR spent fuel bundles in the Prunswick Unit No. 1 fuel pool.
4 I
t l-l l
,,-t
=e-+--
ww e
5, vv*--r
=
- -v-w-"w
--*<-t-
---er-T 1
4
-y w
w v-ri-
()
D
~
DOCKET NO. 050-0325 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME BRUNSWICK I
-DATE MARm 1997 COMPLETED BY FRANCES HARRISON FfARCH 1982
. REPORT MONT!I TELEPIIONE (410T457 05'1
~.
.[?
3 Liecnsee Eg Cause & Corrective I
No.
Date g
3g 4
.g y 5 Event y
{
Action to Report #
mV Prevent Recurience
$5 I.e: 5 -
u H
o 82-019 02-05-82 S
212.1 B
1 NA
.SH SUPORT SNUBBER OUTAGE Periodic inspection of safety related snubbers are a requirement under Tech. Spec, 3/4.7.5 to ensure operability of snobbers.
O I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A liquipment Failure (Explain) 1-Manual for Preparation of Data ll Maintenance or Test 2 Manual Seram.'
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & License Examination '
- 5-Load Reductions b
F-Administrative 6-Cther G-Operational Error (Explain)
Exhibit i. Same Source 19/77) li-Other (Explain)
D D
D DOCKET NO.
050-0Vs UNIT SHUTDOWNS AND POWER REDUCTIONS.
UNIT NAME BRUNSWICK I DATE MARCH 1982 COMPLETED BY FRANCES HARRTSON REPORT MONT11 MARCH 1982 TE EPilONE (9191437-95?1 E
E
.$g S=
4.52 Licensee
,E -r,,
je.
Cause & Corrective No.
Date g
3g
.3 y 5 Event gg g3 Action to Report #
r.o O O
Prevent Recurrence yE
~d -
O H
o e
C 82-019A 02-13-82 H
NA 1B Rx recirc seal leakage to DWEDT.
Replaced seals in IB and 1A rx recirc pumps 1A seals replaced trouble ticket
- 1-M-81-3060, IB seals rep 1; iced on trouble ticket #1-M-82-0195,
- UNITWASOFFLINEFORSNUpBEROUTAGE 4
F: Forced Reason:
Methut :
Exhibit G Instructions t
S: Scheduled A l'quipment Failure (Exp? sin)
- 1. Manual for Preparation of Data Il-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling
- 3. Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & Ucense Examination 5-Load Reductions 5
F Administrative 6-()ther G-Operational Error (Explain)
Exhibit I Same Source (9/77)
Il Other (Explain)
t 050-0325 DOCKET NO.
UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT NAME _
DATE MARCH 1982 FR/dCES HARRISON REPORTMONT*, MARCII 1982 COMPLETED BY TELEPHONE (919)457-9521 4
"L.
c jg 3
- 459, Licensee
,E r, je, Cause & Corrective c.]O Action to No.
Date
~i E R
EE5 Event
?
Prevent Recurrence S
js E
3 ;5 -
Report rN 0 u
e g
C Contro] valve testing to get
~
32-031 02-18-82 F
58.2 A
3 NA HA TURBINE
- 2 Turbine Control Valve to close beyond 95% open point.
- 2 Turbine Control Valve has been electrically gagged shut until the valva can be inspected and repaired during an outage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Schedu!cd A 1: guipment Failure (Explain) 1 -Manual for Preparation of Data
!!.Mainterunee or Test 2-Manual Scram.
Entry Sheets for Licensee
- c. Refueling 3 Automatic Scram.
Esent Report (LER) Fde (NUREG-D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & Ucense Examination 5-Load Reductions 5
F-Administrative 6-Other G-Operational Error (Explain)
Exhibit I - Same Source to/77) li-Other (Explain)
ilD.
1, APPENDIX B r
AVERAGE DAILY POWER LEVEL 3
DOCKET NG. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 03/04/82
}
' TELEPHONE Yi9-457-9521 COMPLETED r Y FRANCES HARRISON FEBUARY 82 DAY AVC. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1
- 516.
17 570.
2 549.
18 589.
3 348.
19' 596.
i 4
-12.
20 628.
+
5 297.
21 632.
6 521.
22
.654.
7 565.-
.23 576.
1 8
575.
-24 506.
-9 597.
25 567.
10 591.
26 561.
r 11 605.
27 584.-
5 i'
12 601.
28 620.
l
'13 599.
14 596.
15 601.
l 16 547.
A 4-1.16 - 8 4
h
,r e
-ytw--- e q y--p
.--,-gn*--er-'--y
-re-e s'
-w
-wg t--s
.,,w.,
-...--y
.,-.,e---
,,,4m.
- e t
,-w-
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 03/04/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- z. REPORTING PERIOD: FEBUARY 82 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I
- 6. MAX DEPENDABLE RAPACITY (GROSS MWE): 815.0 I I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANCES OCCUR IN CsPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 672.0 1416.0 55441.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 645.5 1167.4 36334.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 636.0 1111.4 33880.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1186107.1 2052430.1 62049967.7
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 376796.0 652686.0 20646623.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 364256.0 628487.0 19817900.0
- 19. UNIT SERVICE FACTOR 94.6 78.5 61.1
- 20. UNIT AVAILABILITY FACTOR 94.6 78.5 61.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 68.6 56.2 45.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 66.0 54.1 43.5
- 23. UNIT FORCED OUTAGE RATE 5.3 21.3 17.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING 04/24/82 1750 HOURS
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL GPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9
h APPENDIX i
docketNo: 050-324 Unit: Brunswick No. 2 Date: February 1982 Completed By: Frances Harrison OPERATIONS
SUMMARY
i BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 operated at 94.6 percent availability factor for the month of February with a 68.6 percent capacity factor. There was one off-line outage this snonth. It is detailed in Appendix D, the unit shutdowns and power reduction log.
There are 264 BWR and 144 PWR spent fuel bundles in the Brunswick Unit Fo. 2 fuel pool.
3 4
(
4 i
s k
t -
-,n-
O b
O 050-0325 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS BRUSSWICK 11 UNIT NAME DATE MARCH 1982 FRANLt.5 HARRISON COMPLETED BY FEBRUARY 1982 REPORT MONT11 TELEPHONE (414)457-95?1 n.
E E
.$ ?
'b j.5 ~;
Licensee E r,
[*3 Cause & Corrective Action to No.
Date i
~@
f
,2 s 5 Event gi gO Prevent Recurrence
$5 5
~ f3 --
O Report :
to V H
o e
C 82-016 02-03-82 F
36.1 A
3 NA CC PENETR RX-Scram - Main Steam Line Hi Radiation Trip.
RC&T called to sample Rx Coolant (feedwater, heater drains & RWCU return Main Steam Line also if possible.
Followed EI 31 and 21.
I 2
3 4
F: Forced Reason:
Mcthod:
Exhibit G. instructions S: Scheduled A liguipment Failure (Explain) 1-Manual for Pseparation of Data IbMaintenance of Test 2 Manual Scram.'
Entry Sheets for Liechsee C Refueling 3 Automatic Scram.
Event Report (LER) Fde INUREG.
D Regulatory Restriction 4 Continuations 0161)
E-Operator Training & License Examination 5-Load Reductions 5
F-Administrative 6-Other Exhibit I-Same Source G. Operational Error (Explain)
N/77) li-Other (Explain)
l l
('
f 1
r ll f
A=
l E
E ElE i
W M
M l
4 i
l
(.
E I
t-k--
l P
- I.
F e
P 1
I I: ^
F k
k-
+
+
,+
1 e
/
s9 h,
9 5
bi u'.
-l
h'-
"*k*
- " '"" '~
O^
- ^ ' ' * ' '
3gQ,gph M $m y Er sus.'**
l g
I
_