AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2
==
OATE MARCil 10, 1981
- = =
COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALOEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION OIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1981 DAY AVERAGE DAILY POWER LEVEL OAY AVERAGE OAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1074 17 1058 2
1071 18 1060 3
1072 19 1073 t.
1075 20 1076 5
1072 21 1079 6
1073 22 1081 7
1071 23 1078 8
1070 24 1068
?
1055 25 1056 10 1067 26 1047 l
11 1074 27 1043 12 1082 28 725 l
13 1080,
I 14 1080 15 1058 16 1060 8203230380 810310 PDR ADOCK 05000277 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MARCH 10,1981
_- - - _ =.
COMPANY PHILA0ELPilIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NLCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1981 OAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1055 17 1064 2
1048 18 1064 3
1050 19 1060 4
1049 20 1057 5
1046 21 1056 6
1039 22 1052 7
834 23 1051 8
1062 24 1048 9
1048 25 893 10 1063 26 118 11 1061 27 921 l
12 1063 28 1023 13 1040 14 1060 15 1056 l
16 1061 l
..-.n,
.n.
OPERATING DATA REPORT DOCKET NO. 50 - 277 DATE MARCH 10, 1981 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVI SION-N UCLE AR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAME PEACH BOTTOM UNIT 2 1 NOTES: THIS UNIT EXPERIENCED I
i g
- 2. REPORTING PERICDs FEBRUARY, 1981 1
NO MAJOR OUTAGES AND ONE l
g g
- 3. LICENSED THERHAL POWER (MWTit 3293 i
MAJOR POWER REDUCTION.
l i
4 NAXEPLATE RATING (GROSS MWEls 1152 l
l g
g
- 5. OESIGN ELECTRICAL RATING (NET MWEls 1065 l
l g
- 6. tudIMUM DEPENCABLE CAPACITY (GROSS MWEl' 1098 l
1 1
I
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWEls 1051 l
l 8.
IF CHANGES DCCUR IN CAPACITY RATINGS IITEMS NUMBER 3 THROUGH 71 SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWEls
- 10. RE ASONS FOR RESTRICTIONS, IF ANV3 THIS MONTH YR-TO-D A T E CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1,416 58,344
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,396.9 43,949.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 672.0 1,364.8 42,877.6
- 15. UNIT RESERVE SHUTDOWN HOURS O.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED IMWH) 2,165,640 4,202,086 124,623,158
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 731,890 1,409,620 41,022,720
- 18. NET ELECTRICAL ENERGY GENERATED (MWHI 709,844 1,365,660 39,325,324
- 19. UNIT SERV!CE FACTOR 100.0 96.4 73.5
- 20. UNIT AVAILABILITY FACTOR 100.0 96.4 73 5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.5 91.8 64.1
(
' 22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 90.6 63.3 1
' 23. UNIT FORCED DUTAGE RATE 0.0 3.6 6.0 24 Shut 00WNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHis
- 25. IF SHUTDO WN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP
- 23. UNITS IN TEST STATUS (PRIOR TO COMMERCTAL GPERATIONis FORECAST ACHIEVED 1
INITIAL CRITI'CALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
OPERATING DATA RE PORT DOCKET NO. 50 - 278 1
DATE MARCH 10,1981 f
COMPLETED SY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAMEt PEACH 80if0M UNIT 3 l NOTEst THIS UNIT EXPERIENCED ONE l
g 3
- 2. REPORTING PERIOD FEBRUARY, 1981 l
MAJOR OUTAGE AND DNE l
g 3.' LICENSED THERMAL POWER (MWTis 3293 l
MAJOR POWER REDUCTION.
I g
4, NAMEPLATE RATING (GROSS MWEls 1152 1
6 l
g 5
OESIGN ELECTRICAL RATING (NET MWEls 1065 l
l g
l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEls 1098 l
l l
l
- 7. MAXInUM DEPENDABLE CAPACITY (MET MWEls 1035 l
l
- a. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THRDUGH Tl SINCE LAST REPORT, GIVE REASONS
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls UO. RE ASONS FOR RESTRICT!DNS, IF ANYI THIS MONTH YR-TO-DATE CUMULATIVE ll. HOURS IN REPORTING PERIOD 672 1,416 54,240
.12. NUMBER OF HOURS REACTOR WAS CRITICAL 658.1 1,402.1 43,564.3
.13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENER ATOR ON-LINE 655.4 1,399.4 42,424.2
- L5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,086,752 4,486,378 121.329,327
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHI 694,690 1,496,350 39,598,390
- 18. NET ELECTRICAL ENERGY GENERATED (MWH1 672,974 1,449,958 38,028,601
- 19. UNIT SERVICE FACTOR 97.5 98.8 78.2
- 20. UNIT AVAILABILITY F ACTOR 97 5 08.8 78.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 96.8 98.9 67.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 94.0 96.1 65.8
- 23. UNIT FORCED OUTAGE RATE 25 1.2 7.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)2 REFUELING / MAINTENANCE, 3/7/81, TWENTYTHREE WEEKS
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SHUT DOWNS AND POWER REDUCTIONS REPORT MONT DO H
CKET FEB NO. 50 277 RUAR Y, 19 UNIT
'I 81 NAME I
NO.!
I PEACH BOTT IT l
DA TE M OA TE OM I (YPElD COMP i
LETED ARCH UNIT 111 (URATIONIREASO I
2 HOU l
BY 10, 19 10 1 P
81 1
1 l
(2) NISHUTT HOD HILADELP I 810227 i RS31 MET OF HIA i
i ING l
I 5 I W.M. AL DENELEC TRIC I
I 000 0 I
REACT I
OR (DO3) NI LICENSEE W
\\
1 NUCLEARENGINEER-I COMP i
i 1
EVENT 15Y T
I i-I H
ANY ST ELEP REPOR T el COD EMICOMPONENT I
I NE (GENERA T SECTIO-CHAR HO 1
I 4
l I
GE E I ION N
215) 841-5 DIVI 1
I i
(4)
NA l
CODE I
I I
i (5)
I CAUSE SIO -NUC 022 N
AND l PREVENTION RRECT LEAR ACT CO I
I l
HF TO IVE til I
I l HT RECURRENCE I
i EXCH i FF I
I I
ORCEO 5
SCHED I
i LOAD DROP CONDEN5ER REA (2) i UL EO FOR A SON I
ROD P WA TER A TTERN EQUIP 80X CRB MAINTENMENT CLEANING. U ADJ ST F
AILURE (E MENT 0
REGUEFUELING ANCE OR AND F ADMINIE OPERA TORL A TOR Y TEST XPLAIN)
REST G
OP T
ERAT RA TRAINING + TION 1THOD H
OT IVE HERIEIONAL LICEN 2
MANUALMANUAL ER SE XP L AIN) ROR (EXP EXAMINA TIO o
3 AUT (4)
LAIN)
N SCRAM.
EXHIBIT 4
FOR EXPSCRAM G
INSTRUCT P
L AIN).
ENT REPARAT RY SHEET ION EVENT S
OF IONS ILEREPORT (FL ER) ICENSE OR DA TA F
L INUP EG-0161)
I5)
EXHIBIT 8e '
r----
7*[* I[. -- h.
'. f,,., I ;, I '.. *
,1:,,' by,i jh...&..h,4, ".
,.. Q W. I'
' y '.,. t f h. *(.
.1 !.7,/. [.f.g.
+2p g'. d. 5]-(,I>fM'.> '.; /. ; f.} j r..h.j - ~
/'
- ;,*,y e.
a
\\
v,, !. :.j,
.,.. f - i '.1 ';te.
, g e.
y.4
~. !
-i.
-1 W..
f
,c.e s
r
-e
.'.....7'.e,,
fi l ^,S,. '>f.ft -fd,:.'. ' 5 7? ?.
Jg. s,.p..cgy ;
d.,.* *,. [:.; ;. *. 4,
^'
I**
y rJ.W..!..
.', A. <',;,, 3 5 7 i '
I.Ib,
f~
. c c,...I f.!
. ). '. (,.,,. '
rE F 3 ). l,y,t'y';q,x,.' n.,,' g O
- 1. '
4 y,
p: c 1
(n.',p. e,. a. p.p.p ;m,y* g. <g,g ;:;;. _ p.,
e, y..
.~
~.
- m g,.d. g,p
,gp, y
..g L
(.. e% J,. g g
-p -
.s
- n a. c s
, 3 c.s.#.c,.
u n
. td' h I {..
?+y,;y
, r.y.y 3 *- p "
f * ', * ? /i rf4' i.'. ~ q.+ cf.t.wd/qr.$ - l
.*f...y y 'J'. * ' ~ U,"!. 7 - F.W W p a.W.,f j,.-
,' > t n." 1 i,a u. ; d!.";y6.p &, 5 % t m. ' ' h,
g*
'h;h 6
- ;2. -
. & b:,y -l C, '.,'N,.. g:., L.(.;L,WWl }
Qn. :
- 3.. -
M; ~,
y.
y.;.;: p~; s.:: M,n.!.:..
8.
.s
- r.
t 4
t
-2;
.'p-,. r.s.%. %., P/"
..e...
, :. e s. - -
.s#
in n 3
... ~ -..
DOCKET N0d.50 - 278 UN IT, SHUTDOWNS ANO,. ROWER. REDUCT. IONS g ;L ha, e
.'W*w-%,.
6:,;"q a
m.u---- + -- :,;. w, 3.9'.i.'T.JANdB
,t ? ;W fe,7;p.
a~ '
... :,2 )..:. 'yac... w,.1,3 g. 5,....,
2 UN ih.*. :.NAMEfPEACH, BOTTOM UNITl3
>^
- s. w[-.
I*
ww, N,
.) 7 *
... l.
1 MG# v(nut %'y 9.)'g &g 4
..g;rWn:'Jp* 7 f.:.w.:w'e%Y cg@7 p%p.
a
' y:9.WE.: W.-D ^ :yf 3; DATE4.MARClh10,!98Q.M^? n.M.M'd) 3*; q'G
.G %n 1
.i t. A ;N4 T,,
Wi
. /. ;;' A S J.,. y
- p.tb.'$fs
- j..f.. REPORT-yONTH[(TEPRUARYp,' 1981[r!.,gswQ*. *,p.L MPLETEdd7[P ~ * ' ' *
'lELECTRIC. COMP ANY' gfh...
.4..;
CO PflII.ADELPH,I. A
.. ? '.*
g 7
gp j ;t
., M.q. 4 +
,.y 7
- ., s.
w_
.>n
.. num.
t
.i g y ?)h
).hl,,.h! h-;Y.'EC8!fh*NN5h.. Y?'.h;,Y,$ l
.l2, M.H.ALDEN
? ?.b S h !$.~Y h. 5. h. M Q'Y
- 8. g s
M.
.,'g". :t.* : /# ' rz :.b.q',7,p9fMfr.f.v,MW-?rce?iS W.5p3?i,. * *.R'A -b ENGINE E R-IN
@hr Gfh5WhG;I/T;r$1,f;.Q.";
4
..' 7'yQ*.'ffiyjj,.Y'.p 6 ':
,C",f@j],$;'Q.7/.Qd Ffg.i. J.E,;, O. b, n'N t', NUC LE A R.5ECT10N.. a-GE NER A
. I.d Q l
'j'
_h
'.t.1' 7.y
'a' T '. f'.).k- [i,: d,fg; h.h.h. j
. Q.,QM;e;?g'g 3 o
.b '.'d'.
TELEPHONE'I215) 841-5022-
- i'
.' T.sg:%s
..fc % - y
- i.
- M d..&. ;. N, {
METHOD OF llELICENSEEJJ ISYSTEMICOMPONENil CiUSE AND CORRECTIVE ' j..g ' M% '
'N I
- 2 [,h'r
-l, l
l l
l l
s
,Q).h*d.3..b[.f
!,[ ' - h.QP '
l
- l TYPE l DURATION lRE ASONl SHUTTING DOWNl@e.; EVENT
- il: CODE I
. CODE..l ACTION 10 l'
NU.l DATE I (Ill (HOURSil (2) l REACTOR (31'.l.' REPORT s l(4) l 151. l PREVENT RECURRENCE
~>1
.,. u
,1N r.< r.
.l
.Il c.
. n q.ca ' I m.
1 I
I I
I i'.
I w
l9 c.d ' ci
' i' c, 4 i
3 1 810206 i S I 000.0 l. H l 4 ^ *,y. l # NA # #-
,b Q 1
l ZZZZZZ, l. LOAD OROP FOR ROD PATTERN ADJUSTMENT.'
l, RCl 1
.P 6 LOGIC d : @M paia 4l
.l l
l l
.I l
2 ' ;<, 7181-oIO-03-t. l Ss,:
- l BUS CAUSED RECIRCUL ATION PUMP OISCHARGE J.!
' 1 INSTRU' l 0.C. GROUND INVESTIGATION ON
'A' RHR
+ 1 eIc225 i t.
6 16.6 i
G l Y... ' J 'f g%.
l Tf.A l./. '. J l'
. I, M J.'. '
I
- 1 i
.l -
g 2'J. b M, dj.
3 VALVL3 TO CLOSE WHICH ;1 RIPPED THE
~$y 4. p '.y - o t'
g.
l l
l lJ.MElD)J%.l
( ' '; *h [1 -[lh.u 1
, k#.8( i M.j $.'<1:A I
1
- RECIRCULATION PUMPS. OPEM10R MANUALLY 1
I l
l
. Ir f f @ p l f. l }. $.62.I e$ CRAMMED,1HE REACTOR. %,' '.
2 yk. h,'. % lf. '.k' k:
1 4Yj G,
i V'4;f i,..
l
.. 1 I
I I
J n y m wg,.
.h
.?';.'
l 1s.6 l
. l hi
. u
~
~
+
x' : mm. w.w.m.:: s..pw%p.; &n%. ~? - g*s.pm ;q,w,v
~
v
. +..
m
.s n
m g k.
y~
h,n" h.m' *{.nm:;;'s &. n:1 '> 2. t.,-q M. k, *. ; *w.y :j. m m
.w n
- w. m !..
.mcw
. Q. l *f ;g*Q 'h :l wy ~1.
9 f.,
.QQ.,ylf.a. -
p, e. f ')'.. i,p.. A....,.,, f.e
.+
.f I
.f f,s
, n.'y* f :e.-
y..
1.,, Q
'. s :
..f
' f */g. R, e p'.t,s.pm.. ;,.w. 77..,s,Y E( '.-
,e d ;%.,. Jn :
.h'L g p. g at.b'j.%'.-..G.4 s eg ;~~ 4;. n m 3 o y' ge}*{* m.w
..,o :b
' O.-
g
,t 8
.- ), 'A 'E,f M
l s.
,;.,.8 -..,
y3 s,e t 3
'l.,*
2 ':...
./
5 i
.*M c' r> e '.
c.4-
- #e *
- q ie (
.': a.m.cl.: ml5l'.d.@L
. ' Y.b* :..t '
.h,7 -
f Y * ' 3 ', ?
.s e y 7..... [.,
W '/.J })
,8 3).h's.Q.?s'b,?
'III ' '
- jf 44)'
e 9 ' g -m^^~ '...M-W c '
(21
~m, ; 3 p.-
m
%" l'
- u c.
F - FURLEb REASON (EXPLAINig ( ,.'
EXHIBIT G - INSTRUCTIONS'M N'.J Y Ft,I [1
$u h.' METHOD
'Y' S^.' J/
',4'. : - ' b'.9 /r.' i 5
St*OUL40 A - EQUIPMENT FAILURE 1 - MANUAL
- t A *FOR PREPAR ATION OF DATA
, f k. ENTRY SHEETS FOR LICENSEE,'
' % '? h' M glC
^
, A, #', {.,. Q
- 2 - MANUAL SCRAM.
B - MAINTENANCE Ok TEST
- r EVENT REPORT (LER)(NUREG-811611
. ;. '.i,5 N. g. t b,
...g S.t q,, ! ',,.," S;..M[f,(
,e,
L - REFUELING y
.g.
4..
4 0THER (EXPLAIN),f;.% y. FILE TRAINING + LICENSE EXAMINATION'g% $ $.ig @A; M Q,,'.Q J, [p"[I;,.
lF a i
O - REGULATORY RESTRICTIDN
{./,
E - OPERATOR S -f. 7.,
y4
-iq
.. G f jf. /
.is,.
- 15) - l f Q
,, f'?
U i,
..w $6 QW.
F - ADMINISTRATIVE
,.q y p ' r y r C s..a JHf 'Pg 3..
R, '*Jd.. c
.W,
/-
t L
.I' 1t'
+4' H - OTHE R ( E XPL A IN ) ?'. - r J h ' VK;,: Q't-d.'; ';.1; '; #(.T.;M:FfW"*' ' ' <f'.- $Q :
I - SAME SOURCE %l.
A.'.r pl;..,. 4.).,g
. G - OPER ATIONAL E RROR (EXPLAIN)
' P D D,
- b EXHIBIT
' '~'
,- y r.
.Ih[?
(
h I
[A l
,4 q
~
Dockst No. 50-277 Attachment to Monthly Operating Report For February, 19'81 REFUELING INFORMATION
~
1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next reftteling shutdown:
January 2, 1982 3
Scheduled date for restart following refueling:
February 13, 1982 4
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes.
If answer is yes, what,'in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5 Scheduled data (s) for submitting proposed licensing action and supporting information:
November 13, 1981 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or
(
perfomanne analysis methods, signif'icant changes in fuel design, new operating proo'edures:
None expected.
7.
The number of fusk assemblies (a) in the core and (b) in the spent fuel storage pools (a) Core - 76h Fuel Assemblies (b) Fuel Pool - 910 Fuel Assemblies 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool stcrage capacity has been relicensed for 2816 fuel assemblies.
9 The projected date of the last refueling that can be dischar' ed g
to the spent fuel pool assuning the present licensed capacity.
September, 1990
Dockst No. 50-278 e.
Attachment to Monthly Operating Report' For Februarv, 1981
... y __
mzunING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refiteling shutdown:
March 7, 1981 3
Scheduled date for restart following refueling:
August ik, 1981
~
- h. Will refueling or resumption of operation thereafter require a technical specification change or other license amandmant?
Yes.
(
If answer is yes,'what, in general, will these be?
l Technical specification changes to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5 Scheduled date(s) for submitting proposed licensing action and supporting information:
March 6, 1981 l
6.
Important licensing'consilierations acsociated with refueling, e.g.,
new or different fuel deaign or supplier, unreviewed design or performance analysis methods, signiffoant changes in fuel design, new operating procedures None expected.
7 Thenumberoffuelassemblies(a)inthecoreand(b)intheopent fuel storage pools a
Core - 764 h l Assemblies b
Fuel Pool - 712 Irradiated h 1 Assemblies 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXP N MCES FEBRUARY, 1981 UNIT 2 The Unit operated throughout the month at full power with the exception of the following load reductions. On February 1, and February 14, Reactor core flow was slightly reduced to correct CMFLPD increases due to gadolinia burn out in the bottom of the core. On February 9, 1981, load was reduced by 55 MWe for approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> due to high differential river temperatures.
On February 27, load was reduced to approximately 700 MWe to adjust control rod pattern and to clean the condenser inlet tube sheets.
The E-3 Diesel Generator was blocked out of service for approximately one and one-half hours oc February 24, 1981 to repair a small tubing leak on a lube oil system pressure switch. The RCIC system was taken out of service for recalibration of the flow controller ramp generator and for repairs to the turbine trip throttle valve which took two days, ending on February 26, 1981.
UNIT 3 The Unit operated throughout the month at full power with the exception of a reduction control rod adjustment on February 7, and a 55 MWe load reduction on February 9, for approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> due to hi @ differential river temperatures and a trip which occurred late on February 25,1981. On that date the unit was manually scrammed when both recirculation pumps tripped due to closure of their discharge valves. The recirculation pump discharge valve closure resulted from trouble-shooting to find ground on the 125 VDC system.
On February 5, 1981, the 3B RPS M/G set was taken out of service and the associated RPS bus fed from the alternate source due to the failure of the output overvoltage trip relay during a surveillance test. The RPS M/G set was returned to service on February 7, 1981 following relay replacement, calibration and testing. The HPCI was taken out of service for a day on February 16, 1981 for repair of an oil leak on the tur-bine overspeed device.
The unit was removed from service on March 6, 1981 for a scheduled refueling, maintenance, ar.d major modification outage.
-