Text
fl.-
~ e suun SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 s Street. Box 15830, Sacramento, Cahfornia 95813 916) 452-3211 Yi J
-r January 8,1982 h
I o
F4 a
R H ENGELKEN U S NUCLEAR REGULATORY COMMISSION REGION V 0FFICE OF INSPECTION AND ENFORCEMENT 1450 MARIE LANE SUITE 260 WALNUT CREEK CALIFORNIA 94596 DOCKET 50-312 RANCHO SEC0 NUCLEAR GENERATING STATION UNIT N0 1 IE INSPECTION REPORT N0. 50-312/81-22 This letter is in response to the NRC Region V IE Inspection Report No.
50-312/81-22 transmitted to the District by letter dated November 5,1981.
The current status of the corrective action for each item in Appendix A of the November 5, 1981, transmittal is discussed.
No discussion is provided for items in Appendix B.
Based upon the Emergency Preparedness Implementation Appraisal of June 22-26, 1981, and the resulting report, the Emergency Preparedness Coordinator deter-mined that significant changes to the Emergency Plan and Procedures were re-quired to properly correct the deficiencies. Although time was a limiting factor for the completion of all work (i.e., 120 days), quality could not be compromised. Much progress has been made toward the completion of this task, but more time is required to complete it.
The various parts of the Rancho Seco Emergency Plan are enclosed as Attachment 1.
A listing of the Rancho Seco Emergency Plan Procedures by number and title are enclosed as Attachment 2.
All of the existing procedures required extensive revision, so a new procedure format was established to correct many of the ap-praisal deficiencies.
An example of the new procedure format Title Page is en-closed as Attachment 3.
The current status and scheduled completion of the re-vision to the Emergency Plan are enclosed as Attachment 4, and to the Procedures ~
as Attachment 5.
A discussion for each item listed in Appendix A of the Novem.
ber 5,1981, letter is enclosed as Attachment 6.
8203230259 820319 gDRADOCK05000
i R H ENGELKEN 2-January 8,1982 3-l If there are any questions concerning the District's corrective actions to the Emergency Preparedness Appraisal, we will be pleased to discuss them with you.
f n
/
John. Mattimoe Assistant General Manager and Chief Engineer i
Enclosures t
.I i
.i
}
i i
i l
I 1
I l
l 5
l i -
r,
.r,---,,
n-
,-,,,.-,.,,,,,,--...,--,nc
-+n
,-,~.,..,v,
e RANCHO SEC0 EMERGENCY PLAN AP 500 TABLE OF CONTENTS -(TOC)
Section 1 Definitions Section 2 Scope and Applicability Section 3 Summary of Energency Plan Section 4 Emergency Conditions Section 5 Organizational Control of Bnergencies Section 6 Emergency Measures Section 7 Daergency Facilities and Equipment Section 8 Maintaining Emergercy Preparedness Section 9 Reentry and Recovery Section 10 References APPENDICES A
List of Emergency Plan Implementing Procedures B
List of Energency Equipment and Supplies C
Plots of Calculated Time-Distance-Dose D
Letters of Agreement and Memorandums of Understanding E
State of California Nuclear Power Plant Emergency Response Plan F
Sacramento County Nuclear Power Plant Bnergency Response Plan G
Amador Cnunty Nuclear Power Plant Emergency Response Plan H
San Joaquin County Nuclear Power Plant Bnergency Response Plan I
Interagency Radiological Assistance Plan (IRAP)
J Time Estimates for Evacuation Within the Plume EPZ e
4
~
RANCHO SECO EMERGENCY PLAN PR0r_DURES 5 01 Recognition and Classification of Daergency 502-Notification of Unusual Event 503 Alert 504 Site Area Emergency 505' General Bnergency 506 Notification /Conaunication 507 Onsite Radiological Monitoring 508 Of fsite Radiological Monitorirs 509 Control Room Dose Calculation 51 0 Emergency Reactor Coolant Sampling 511 TSC Dose Calculation 51 2 E0F Dose Calculation 51 3 Personnel Accountability 51 4 Personnel Injury 51 5 Baergency Personnel Dosimetry 51 6 Personnel Decontamination 51 7 Radiation Overexposure 51 8 Search and Rescue 51 9 Site Evacuation 520 Fi re 5 21 Toxic Material 522 High Wind 523 Earthquake 524 Reentry / Recovery 525 Security 526 Sabotage or Civil Disturbance 527 Baergency Exposure Guidelines 528 Protective Action Guide 529 Of fsite Support and Assistance 530 Offsite Laboratory Support 5 31 lblicopter 532 Equipn. ant and Area Decontamination 533 Potassium Iodide Administration 534 Airborne Release Rate Determination 540 Bnergency Response Organization
' Attachment 2 550 Activation of the Technical Support Center 5 51 Activation of Plant Assembly Points / Operations Support Center 552 Activation of Offsite Reassembly Points 553 Activation of the Emergency Operations Facility 554 Activation of the Unified Dose Assessment Center 555 Activation of the General Office Dnergency Response Center 556 Activation of the Media Center 569 Release of Infonnation to the Public and Media 580 Trai ni ng 5 81 Dri ll s 5 81. 01 Communications Drill 581.02 Fi re Drill 581.03 Medical Drill 581.04 Health Physics / Rad Monitoring Drill 582 Exe rcises 583 Procedure Preparation, Review, Approval, ana Maintenance Guidelines 584 Telephone Number Verification 585 Emergency Assignment Verification 586 Support Group Agreement Verification 587 Maintenance and Inventory of Emergency Equipment and Supplies l
l i
f 599
- General Office Dnergency Plan
Attac hment. 3 Effective Date:
Revision No.
SMUD - RANCHO SECO EMERGENCY PLAN PROCEDURE AP (PROCEDURE NO. )
(PROCEDURE TITLE)
TABLE OF CONTENTS-Page No.
s 1.0 PURPOSE 2
2.0 RESPONSIBILITY 2
3.0 INITIATING CONDITIONS 2
?
4.0 PRECAUTIONS AND LIMITATIONS 3
5.0 INSTRUCTIONS 6.0 REFERE NCES 7.0 ATTACH 1ENTS 4
AP 5 Page 1 of Rev.
i
Submi t PRC MSRC Editorial to PRC Approval Approval Corrections Di stribution 500- TOC Editori al 1
no revision 2
no revision 3
no revision 4
1 2 / 81 1/82 2/82 2/82 3/1/82 5
1 2/ 81 1/82_
2/82 6
1/82 1/82 2/82
[
7 1/82 1/82 2/83 8
1 2 / 81 1 2 / 81 1/82 9
1 2 / 81 1/82 1/82
'}
10 1 2 / 81 1/82 1/82 f
f A
Editorial B
Editori al C
no revision D
Editori al l
E will be kept under separate cover F
will be kept under separate cover G
will be kept under separate cover H
will be kept under separate cover I
no revision J
no revision i
I I
i l
Attachnent'5
~Subait PRC MSRC Editorial to PRC Approval Approval Corrections Di stribution
- AP 5 01 12/81 <
1/82 possf ble but not mandatory 2/82 3/1/82 502 1 2 / 81 1/82-possible but not mandatory 2/82 3/1/82 4
503 1 2 / 81 1/82 possible -but not mandatory 2/82 3/1/82 504 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 505 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 506 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 507 1/82 1/82 possible but not mandatory 2/82 3/1/82 508 1/82 1/82 possible but not mandatory 2/82 3/1/82 509-1/82.
1/82 possible but not mandatory 2/82 3/1/82 51 0 1/82 1/82 possible but not mandatory 2/82 3/1/82 51 1 1/82 1/82 possible but not mandatory 2/82 3/1/82 51 2 1/82 1/82 possible but not mandatory 2/82 3/1/82 51 3 1/82 1/82 possible but not mandatory 2/82 3/1/82 51 4 1/82 1/82 possible but not mandatory 2/82 3/1/82 51 5
-1 2 / 81,
1/82 possible but not mandatory 2/82 3/1/82 51 6 1 2 / 81 1/82
- possible but not mandatory 2/82 3/1/82"-
51 7 1 2 /81 1/82 possible but not mandatory 2/82 3/1/82-51 8 1/82 1/82 possibla but not mandatory 2/82 3/1/82 51 9 1/82 1/82 possible but not mandatory 2/82 3/1/82 520 1/82 1/82 possible but not mandatory 2/82 3/1/82 5 21 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 522 1/82 1/82 possible but not mandatory 2/82 3/1/82 523 1/82 1/82 possible but not mandatory 2/82 3/1/82 524 1/82 1/82 pcssible but not mandatory 2/82 3/1/82 4
525 1/82 1/82
- possible but not mandatory 2/82 3/1/82 526 1/82 1/82 possible but not mandatory 2/82 3/1/82 527 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 528 1/82 1/82 possible but not mandatory 2/82 3/1/82 529 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 530 1/82 1/82 possible but not mandatory 2/82 3/1/82 5 31 1/82 1/82 possible but not mandatory 2/82 3/1/82 532 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 533 1 2 / 81 1/82 possible but not mandatory 2/82 3/1/82 534 1/82 1/82 possible but not maridatory 2/82 3/1/32 540 1/82 2/82 possible but not mandatory 2/82 3/1/82 550 1/82 2/82 possible but not mandatory 2/82 3/1/82 5 51 1/82 2/82 possible but not mandatory 2/82 3/1/82 552 1/82 2/82 possible but not mandatory 2/82 3/1/82 553 1/82 2/82 possible but not mandatory 2/82 3/1/82 554 1/82 2/82.
possible but not mandatory 2/82 3/1/82 555 1/82 2/82 possible but not mandatory 2/82 3/1/82 556 1/82 2/82 possible but not mandatory 2/82 3/1/82 569 1 1 / 81 11/10/81 N/A 11 /81 1 2 / 81 4
s Attachnent 5 -
Submit PRC MSRC Editorial to PRC Approval Approval Corrections Distri bution
'500 1 2 / 81 1 2 /81 1/82 2/82 5 81 1 2 / 81 1 2 / 81 1/82 2/82 581.01 12/81 1 2 /81 1/82 2/82 581.02 12/81 1 2 / 81 1/82 2/82 561.03 12/81 1 2 /81 1/82 2/82 581.04 12/81 1 2 / 81 1/82 2/82 582 1 2 /81 1 2 /81 1/82 2/82 583 1 2 / 81 1/82 1/82 2/82' 584 1 2 /81 1 2 /81 1/82 2/82 4
585 1 2 / 81 1 2 / 81 1/82 2/82 586 1 2 / 81 1 2 / 81 1/82 2/82 587 1 2 / 81 1 2 / 81.
1/82 2/82 I
599 4
4
s Attachnent 6 SIGNIFICANT DEFICIENCIES Mentioned in order of the confinnatory letter dated August 31, 1981, which was enclosed as Appendix A to the November 5,1981, letter.
Item No.
Di scussion 1
Job description for all District positions which have major assignments in the Emergency Plan Organization are now on file with the Emergency Preparedness Coordinator (EPC).
Thi s was completed in November,1981.
2 Procedures AP 501 through AP 505 were revised to make them more applicable to the duties and responsibilities of the Emergency Coordinator (EC).
These procedures were submitted to the PRC in December,1981.
3 A significant ruvision to AP 500 Section 5.0 to make a change to the Emergency Plan Organization and to include a discussion of each position's duties and responsibilities.
Thi s section was submitted to the PRC in December,1981.
AP 540 was established to provide the E'aergency Plan Organization positions (other than the EC) a procedure that identifies their duties, msponsibilities, and actions.
Thi s procedure will be submitted to the PRC in January,1982.
4 The Ra tcho Seco Offsite Emergency Response Plan Agency Planning Team and District Consumer Relations staff have beer, working closely in developing a Public Information Brochure.
This brochum is now in rough draf t and awaiting comments from the Planning Team.
5 Procedure AP 569 was established to handle the District's initial activities with the media until the Media Center is activated.
Thi s procedure was approved by the PRC Noveraber 10. 1981.
6 The TSC will be mdefined in AP 500 Section 7.0.
This section will be submitted to the PRC in January,1982.
7 The Operation Support Center will be mnamed the H.P. Staging Are a.
The Plant Assembly Point will continue to be called the Plant Assembly Point but will include a "(0perational Support Center)" immediately following. These changes will be made to AP 500 Section 7.0.
The Elaergency Plan Procedures will make no reference to an Operational Support Center.
AP 500 Section 7.0 will be submitted to the PRC in January,1982.
8 The AP 550 series procedures will include the appropriate mferences to the keys under the control of the Shift Supervisor.
These procedums will be submitted to the FjC in January,1982.
. ~.
Item No.
Discussion 9
Equipment is now available at the Plant Assembly Point that will allow the onsite and offsite radiological survey teams to perfona their duties, including airborne radioiodine sampling.
10 The site meteorological tower has now been reinstrumented.
A calibration and preventative maintenance program for the meteorological instrumentation, including the sensors has been established with a frequency of at least once per quarter.
11 By procedure (SDP 9-1), the District Dispatcher now notifies the Rancho Seco Control Room of severe environmental conditions.
12 The coamunication system to the counties' 24-hour comunications center continues to be tested monthly. The scope of the comunication drill will be mom clearly defined in AP 581.01.
This procedure is approved by the PRC.
13 AP 500, Section 6 is being revised to show that the responsibility for collection and analysis of environmental samples has been given to the State of California ano the Counties. The District will perfona offsite radiological surveys on a pmdetennined mute which covers roughly a two-mile radius circle around the site.
The District survey team will return to the site after the County survey teams are operational.
The District will continue to perfom its nonnal Environmental Sampling Pmgram throughout the emergency.
This section change will be submitted to the PRC in January, 1982.
14 AP 507 and AP 508 are being revised to make them complete without mfemnce to other pmcedums.
These procedures will be submitted to the PRC in January,1982.
15 The inconsistencies in allowable radiation exposure guidance contained in AP 500, Section 6.0, and various procedums are being removed.
This section and the procedures will be submitted to the PRC in Janua ry, 1982.
16 Appropriate procedural precautions to provide radiation exposure warnings are being included in the appropriate procedures.
These procedures will be submitted to the PRC in January,1982.
17 A meeting was held in September,1981 between the EPC, a representative from State OES, and the Counties to discuss traini ng.
The Counties have now shifted the major Exercise date to June 23, 1982.
No training schedule now exists.
.e..
~
,-g Item No.
Discussion 18 AP 500, Section 8.0, has been revised to clearly define the responsibilities for Bnergency Plan maintenance.
The AP 580 series procedures implement the Emergency Plan Maintenance p rog ram.
This section and the procedures were submitted to the PRC in December,1981 and all approved with comment (except AP_583).
AP 583 will be resubmitted to the PRC in January,1982.
19 (See discussion for Item No.18.)
20 (See discussion for Item No.18.)
21 (See discussion for Item No.18.)
,