ML20041G224
| ML20041G224 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/10/1981 |
| From: | Chilson V FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20041G214 | List: |
| References | |
| NUDOCS 8203190415 | |
| Download: ML20041G224 (4) | |
Text
,
OPERATING DATA REPORT DOCKEl NO.50-335 DATE ec. 10. 1981 D
COMPLETED !!YV. T. Chilson._
TELEPIIONI(3051 557-3666 OPERAT!Nt, STATUS St. Lucie Unit No. 1 Notes Unit remained out of
- 1. Unit Name:
- 2. Reporting Period:
' Nov' ember 1981 service for selected 2560 refueling, maintenance and
- 3. Licensed Thermal Power (MWt):
inspections (continued from 850
- 4. Nameplate R.iting(Gross MWe):
Previous month) 802
- f. Design Electrical Rating (Net MWe):
822
- 6. Maximum Dependable Capacity (Gross MWe)-
777
- 7. Mrximum Ddpendable Capacity (Net MWe):
- 8. If Changes Occur in' Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power LevelTo Which Restricted.If Any(Net MWe):
ha
- 10. Ressons For Restrictions,if Any:
2
~
This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 720.0 8016.0 43344.0
- 12. Number Of Hours Reactor Was Critical 26.4 5910.2 34335.5
- 13. Reacibr Reserve Shutdown Hours 75.9 205.3
- 14. Hours Generator On Line 5882.3 33513.4
- 15. Unit Reserve Shutdown Hours 39.3
- 16. Gross Thermal Energy Generated (MWH) 1
~
14,947,870 82,196,018
- 17. Gross Electrical Energy Generated (MWH) nf 4.AR1_SRO 26.691.440 3
- 18. Net Electrical Energy Generated (MWH)
-4573 4.611.369 25.138,855
- 19. Unit Service Factor 73.4 77.3
- 20. Unit Availability Factor 73.4 77.4
- 21. Unit Capacity Factor (Using MDC Net) - -
74.0 74.6
- 22. Unit Capacity Factor (Using DER Net) '71.7 72.3
- 23. Unit Forced Outage Rate 1.7 5.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duratjou of Each):
- 25. If Shui Down At End Of Report Period. Estimated Date of Startup:
December 2, 1981
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved ej INITIAL CRITICA LI([
L INITIA L ELECTRICITY COMMERCIA L GPER ATION
-c 8203190415 811215 PDR ADOCK 05000335 (9/77) c.
R pop ~
=
s UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO' 50-333 UNIT NAME st. Lucie Unit.No. 1 DATE Dec_ 10_ 1081 COMPLETED fly V-T-
Philenn REPORT MONTl!NOVEMIFR 1981 TELEPHONE m5nT 557_366A E
e 5?
3 4 55 Licensee
[= t, ja Cause & Corrective z
No.
Date i
38 i
i~5 Event
?
E-Action to
$~
~ 5 :!
Report =
<E C 5'
Prevent Recurrence u
u 6
06 81-09-11 S
720.0 C
4 RC Fue1xx Scheduled refueling, maintenance and inspection (continued from previous month). (Nuclear and Non-Nuc1 car Systems)
I 2
3 4
F: Forced Reason:
Method:
Edibit G. Instrnesions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2-Manual Scram.
Entry Sheets for Iieensee C. Refueling 3-Automatic Scram.
Event Report (Lf R) File iNURI.G-D-Regulatory Restriction 9-Ot her ( Explain )
0161i E-Operator Training & License Examination F-Ad minist ratise Y ~ O ' "'
- 5 G. Operational Error ( E xplam p c_ toao M o ve3..r>
Estubit I - Same Sourec (9/77)
Il-Ot he r ( E xplain )
i a
a 4
" *\\
9 3
t' I
AVEll AGE DAlli UNil POWER LEVEL DOCKE1 NO. 50-335 St. Lucie Unit UNIT No _1 December 10, 1981
,g COMPLET E D !!y V. T. Chilson __ ~
TELEPilONE (305) 95L1 A A6 MON 111 Novembgr 1981 DAY AVER AGE DAILY POV.ER LEVEL DAY AVER AGE DAILY P0hER LEVEL tMWe Net) iMWe-Net i 1
l7 3
Ib 3
19 4
20 5
3; 6
yy c
7 23 8
24 9
25 10 26 1I y,
I2 2S I3 29 14
~
30 l5 g
is INSTRUCTIONS On this forinat,hst the asciage daily unit power leselin MWe. Net lies each day in the reiviting inonth. Coinpute to the nearest whole nwgawatt.
e9 a
i l
e6/77)
o
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-335 UN1T St. Lucie Unit No. 1
_ -~.
DATE December 15, 1981 COMPLETED BY V. T. Chilson TELEPHONE
_(305) 552-3666 REPORT MONTH November, 1981 Unit remained out of service for scheduled refueling, maintenance and inspection (continued from previous month).
Refer to " Unit Shutdowns and Power Reductions" section of November 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the montn included:
Inspections and requirements of IE Bulletins and NUREG-0578 in a
progress.
Florida Power & Light Company canmitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Completed I,nservice Inspection.
Completed Steam Generator tube inspection.
'E t
--