ML20041G224

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1981
ML20041G224
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/10/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20041G214 List:
References
NUDOCS 8203190415
Download: ML20041G224 (4)


Text

,

OPERATING DATA REPORT DOCKEl NO.50-335

-- . DATED ec. 10. 1981 COMPLETED !!YV. T. Chilson ._

TELEPIIONI(3051 557-3666 OPERAT!Nt, STATUS

1. Unit Name: St. Lucie Unit No. 1 Notes Unit remained out of

' Nov' ember 1981 service for selected

2. Reporting Period:

2560 refueling, maintenance and

3. Licensed Thermal Power (MWt): inspections (continued from
4. Nameplate R.iting(Gross MWe): 850 802 Previous month)
f. Design Electrical Rating (Net MWe):

822

6. Maximum Dependable Capacity (Gross MWe)-
7. Mrximum Ddpendable Capacity (Net MWe):

777

8. If Changes Occur in' Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power LevelTo Which Restricted.If Any(Net MWe): ha
10. Ressons For Restrictions,if Any:

2

~

This Month Yr to Date Cumulative

11. Hours in Reporting Period 720.0 8016.0 43344.0
12. Number Of Hours Reactor Was Critical 26.4 5910.2 34335.5
13. Reacibr Reserve Shutdown Hours 75.9 205.3
14. Hours Generator On Line 5882.3 33513.4
15. Unit Reserve Shutdown Hours 39.3 1

~

16. Gross Thermal Energy Generated (MWH) ._

14,947,870 82,196,018 .

17. Gross Electrical Energy Generated (MWH) 3 nf ,.

4.AR1_SRO 26.691.440

18. Net Electrical Energy Generated (MWH) -4573 4.611.369 25.138,855 ,
19. Unit Service Factor '

73.4 77.3

20. Unit Availability Factor 73.4 77.4
21. Unit Capacity Factor (Using MDC Net) - - 74.0 74.6
22. Unit Capacity Factor (Using DER Net) '71.7 72.3
23. Unit Forced Outage Rate 1.7 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duratjou of Each): -
25. If Shui Down At End Of Report Period. Estimated Date of Startup: December 2, 1981
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved ej L

INITIAL CRITICA LI([

INITIA L ELECTRICITY -'

COMMERCIA L GPER ATION

-c 8203190415 811215 PDR ADOCK 05000335 -

(9/77)

c. R >

pop ~

=

s UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO' 50-333 UNIT NAME st. Lucie Unit.No. 1 DATE Dec_ 10_ 1081 COMPLETED fly V- T- Philenn REPORT MONTl!NOVEMIFR 1981 TELEPHONE m5nT 557_366A

- E e No.

, 5? 3 4 55 Licensee [= t, jaz Cause & Corrective Date i 38 i i~5 Event  ? E- Action to

$~ $ u

~ 5 :!

Report = <E C 5' u Prevent Recurrence 6

06 81-09-11 S 720.0 C 4 RC Fue1xx Scheduled refueling, maintenance and inspection (continued from previous month). (Nuclear and Non-Nuc1 car Systems)

I 2 3 4 F: Forced Reason: Method: Edibit G . Instrnesions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data Il-Maintenance of Test 2-Manual Scram. Entry Sheets for Iieensee C. Refueling 3-Automatic Scram. Event Report (Lf R) File iNURI.G-D-Regulatory Restriction 9-Ot her ( Explain ) 0161i E-Operator Training & License Examination F-Ad minist ratise Y ~ O ' "'

  • 5 G. Operational Error ( E xplam p c_ toao M o ve3..r> Estubit I - Same Sourec (9/77) Il-Ot he r ( E xplain )

i a

a

4 >

9 3 " .*\ t' I

AVEll AGE DAlli UNil POWER LEVEL DOCKE1 NO. 50-335 St. Lucie Unit UNIT No _1 December 10, 1981

,g _

COMPLET E D !!y V. T. Chilson __ ~

TELEPilONE (305) 95L1 A A6 MON 111 Novembgr 1981 DAY AVER AGE DAILY POV.ER LEVEL DAY AVER AGE DAILY P0hER LEVEL tMWe Net) iMWe-Net i 1 l7 3 Ib -

3 19 _

4 20 -

5 3; _

6 yy

- c 7 23 8 24 9 25 10 26 1I y, I2 2S I3 29 -

~

14 30 -

l5 g is INSTRUCTIONS On this forinat,hst the asciage daily unit power leselin MWe. Net lies each day in the reiviting inonth. Coinpute to the nearest whole nwgawatt.

e9 i

, a l

e6/77)

o

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UN1T St. Lucie Unit No. 1 _

_ -~.

DATE December 15, 1981 COMPLETED BY V. T. Chilson __

TELEPHONE _(305) 552-3666 REPORT MONTH November, 1981 Unit remained out of service for scheduled refueling, maintenance and inspection (continued from previous month). Refer to " Unit Shutdowns and Power Reductions" section of November 1981,

  • Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the montn included: ._

Inspections and requirements of IE Bulletins and NUREG-0578 in a progress.

Florida Power & Light Company canmitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

Completed I,nservice Inspection.

Completed Steam Generator tube inspection.

, 'E t

--