Forwards IE Insp Rept 50-373/82-09 on 820216-17.No Noncompliance Noted
ML20041G107
Person / Time
Site: LaSalle 
Issue date: 03/01/1982
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20041G108 List:
References
NUDOCS 8203190269
Download: ML20041G107 (2)


See also: IR 05000373/1982009

Text

-

,

.

.

IE HQ FILE COPY

MAR

1 1982

e

4

C

  • '/'s

Docket No. 50-373

p

4, Qi.g'

E] "$7tr3U/!Q "n

O

Commonwealth Edison Company

bO2A 7

AT1H:

Mr. Cordell Reed

Vice President

"%

O

Post Office Box 767

"

.

Chicago, IL 60690

4,

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. E. Miller of

this office on February 16-17, 1982, of activities at LaSalle County Nuclear

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the

discussion of our findings with Mr. Bishop at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request.for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established. Consistent with Section 2 790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statemert of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statemt.nt to address with specificity the con-

siderations listed in 10 CFR 2.790(O (4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

DM:

-

8203190269 820301

PDR ADOCK 05000373

5

C

PDR

yj

.

.

NEN

1 l302

Commonwealth Edison Company

2

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

E

L. R. Greger, Acting Chief

Technical Inspection Branch

Enclosure:

Inspection

Report No. 50-373/82-09(DETP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

,

RIII

RIII

RIII

&

f&AN

Mil er/so

Greger

kalker

2/24/82

L M-T)A

-_. _

_ . _ .

-