ML20041G107
| ML20041G107 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/01/1982 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20041G108 | List: |
| References | |
| NUDOCS 8203190269 | |
| Download: ML20041G107 (2) | |
See also: IR 05000373/1982009
Text
-
,
.
.
IE HQ FILE COPY
1 1982
e
4
C
- '/'s
Docket No. 50-373
p
4, Qi.g'
E] "$7tr3U/!Q "n
O
Commonwealth Edison Company
bO2A 7
AT1H:
Mr. Cordell Reed
Vice President
"%
O
Post Office Box 767
"
.
Chicago, IL 60690
4,
Gentlemen:
This refers to the routine safety inspection conducted by Mr. D. E. Miller of
this office on February 16-17, 1982, of activities at LaSalle County Nuclear
Station, Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the
discussion of our findings with Mr. Bishop at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request.for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so that
a new due date may be established. Consistent with Section 2 790(b)(1), any
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld,
and which contains a full statemert of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statemt.nt to address with specificity the con-
siderations listed in 10 CFR 2.790(O (4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
DM:
-
8203190269 820301
PDR ADOCK 05000373
5
C
yj
.
.
NEN
1 l302
Commonwealth Edison Company
2
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
E
L. R. Greger, Acting Chief
Technical Inspection Branch
Enclosure:
Inspection
Report No. 50-373/82-09(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
,
RIII
RIII
RIII
&
f&AN
Mil er/so
Greger
kalker
2/24/82
L M-T)A
-_. _
_ . _ .
-