ML20041F443

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 811123-25
ML20041F443
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/24/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20041F438 List:
References
50-213-81-15, NUDOCS 8203160504
Download: ML20041F443 (1)


Text

T

^

APPENDIX A NOTICE OF VIOLATION Connecticut Yankee Atomic Power Company Docket No. 50-213 Haddam Neck Plant License No. DPF-61 As a result of the inspection conducted on November 23-25, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

10 CFR 70.51(c) requires that licensees establish, maintain, and follow written material control and accounting procedures which are sufficient to enable the licensee to account for the special nuclear material in his possession under license.

Contrary to the above, the inspector determined on November 24, 1981 that the licensee had not established written material control and accounting procedures sufficient to account for three fission chambers (Nos. 142, R-4372 and 869) held under License No. DPR-61 and which contained special nuclear material.

This is a Severity Level V Violation (Supplement III).

Pursuant to the provisions of 10 CFR 2.201, Connecticut Yankee Atomic Power Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation. Where good cause is shown, consideration will be given to extending your response time.

The responses directed by this Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Dated __ _

{M h p<t.s g T@ @as T. Martin,p irettor D% ision of Engineering and Technical Inspection OFFICIAL RECORD COPY 8203160504 820224 PDR ADOCK 05000213 G

PDR