ML20041F437

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 50-213/81-15 on 811123-25 & Notice of Violation
ML20041F437
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/24/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20041F438 List:
References
NUDOCS 8203160500
Download: ML20041F437 (2)


See also: IR 05000213/1981015

Text

i

.

,

24 FEB 1982

Docket No. 50-213

e

A

D

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

gg EIVED

Vice President - Nuclear

9

M4Ry.gIS62 h 0

Engineering and Operations

2

'.

P. O. Box 270

e

fg

-

ansig

Hartford, Connecticut 06101

Gentlemen:

'b

//

'

Subject:

Inspection 50-213/81-15

This refers to the routine Safeguards inspection conducted by Mr. A. Della Ratta

of this office on November 23-25, 1981 at Northeast Utilities Service Corporation,

Berlin, Connecticut, and Connecticut Yankee Nuclear Power Plant, Haddam Neck,

Connecticut, of activities authorized by NRC License No. DPR-61 and to the

discussions of our findings held by Mr. Della Ratta with Mr. J. H. Ferguson of

your staff at the conclusion of the inspection, and to a subsequent telephone

discussion between Mr. Della Ratta and Mr. D. J. Ray on December 4,1981.

Areas examined during this inspection are described in the Office of Inspection

,

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspectnr.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of non-

compliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980. You are required to

respond to this letter and in preparing your response, you should follow the

instructions in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

RI:DETlI/N

RI:E

I

kTI

RI: KI

Della Ratta:hh

er

Mar in

f

1/25/82Jyrz.-

.,

'

"

0FFICI

RECORD COPY

,

8203160500 820224

N

PDR ADOCK 05000213

G

PDR

h1

l

t

f

-.

.

Connecticut Yankee Atomic Power Company 2

24 FEB 1982

Your cooperation with us in this matter is appreciated.

Sincerely,

k

'

W

omas T. MarMn, Director

Division of Engineering and Technical

Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-213/81-15

cc w/encls:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

J. F. Opeka, System Superintendent, Nuclear Operations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

Director, DRPI

0FFICIAL RECORD COPY

9 -.