24 FEB 1982
Docket No. 50-213
e
A
D
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
gg EIVED
Vice President - Nuclear
9
M4Ry.gIS62 h 0
Engineering and Operations
2
'.
P. O. Box 270
e
fg
-
ansig
Hartford, Connecticut 06101
Gentlemen:
'b
//
'
Subject:
Inspection 50-213/81-15
This refers to the routine Safeguards inspection conducted by Mr. A. Della Ratta
of this office on November 23-25, 1981 at Northeast Utilities Service Corporation,
Berlin, Connecticut, and Connecticut Yankee Nuclear Power Plant, Haddam Neck,
Connecticut, of activities authorized by NRC License No. DPR-61 and to the
discussions of our findings held by Mr. Della Ratta with Mr. J. H. Ferguson of
your staff at the conclusion of the inspection, and to a subsequent telephone
discussion between Mr. Della Ratta and Mr. D. J. Ray on December 4,1981.
Areas examined during this inspection are described in the Office of Inspection
,
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspectnr.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of non-
compliance has been categorized into the levels described in the Federal
Register Notice (45 FR 66754) dated October 7, 1980. You are required to
respond to this letter and in preparing your response, you should follow the
instructions in Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
RI:DETlI/N
RI:E
I
kTI
RI: KI
Della Ratta:hh
er
Mar in
f
1/25/82Jyrz.-
.,
'
"
0FFICI
RECORD COPY
,
8203160500 820224
N
PDR ADOCK 05000213
G
h1
l
t
f
-.
.
Connecticut Yankee Atomic Power Company 2
24 FEB 1982
Your cooperation with us in this matter is appreciated.
Sincerely,
k
'
W
omas T. MarMn, Director
Division of Engineering and Technical
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-213/81-15
cc w/encls:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
J. F. Opeka, System Superintendent, Nuclear Operations
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
Director, DRPI
0FFICIAL RECORD COPY
9 -.