ML20041F379
| ML20041F379 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/26/1982 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20041F380 | List: |
| References | |
| NUDOCS 8203160440 | |
| Download: ML20041F379 (4) | |
See also: IR 05000397/1982003
Text
..
- + :; .
- ,
W
,
.,
o
%41982
,
,.
,!
'
l
f
,
'
Docket No. 50-397
m
-
,
'
'
!
>
RECEIVED
i
Washington Pubile Power Supp1y ' System
-
(
,
-
9;
MARp5 79825
P. O. Box 968
,
'
It2
Richland, Washington 99352
-m
-
Y
'
b
T2
/
'
Attention:
R. G. Matlock
Program Director, UNP-2
f
4
to
ta
Gentlemen:
J.
v
/
,
Subject: NRC Inspection of WNP-2 (Preoperational Test Phase)
f[
This refers to the inspection conducted by ife, D. J. Willett of this office
on February 1-4, 1982, of activities authorizer by NRC Construction Permit
No. CPPR-93, and to the discussion of our iindings held by the inspector
'
with Mr. J. Martin and other members of your staff at the conclusion of the
inspection.
.
?
,:
,
Areas examined during this inspection ard described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
.of procedures and representative records, interviews with personnel, and
observations by the inspector.
,
No items of noncompliance with NRC requirements were,Adentified within the
scope of this inspection.
,
/.
In 'accordance with'10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by teleph'one, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter. Such applicatten must be consistent with the
requiramentsof2.790(b)(1).
g
i
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
I'
-
,
'
St6terely,
,
,
t-
,
i
'
h440 B20226Ck05000& ,r; p . .w yh e r
,.
c
, , ,
,
'
'
~
'I - 'l$0
l
G
D. M. Sternberg, Chief
,
Reactor Operations Projects
.Qft(,v .....;y'. 1 .. p
+
c"'cc >
...aranch.
... . ... . ... .
...
..
. ..
...
..
..
..
' " " ' >
. .Y0.V.N . . . , , , ,
, ,S .
.(B. RG . , ,,
........,........ .
,, ,,
,,, ,,
, , , , ,, , ,
, , , ,
. .
,g,,
.
,
g2
/82
2
'
">
2g,(82
..
, , ,,,
.
.
.
.
,
.
.
..
.
. , ,.
, , ,
. , , ,
MRC IORM 318 sto'80lNRCM O240
OFFICIAL RECORD COPY
,usc#o 9 5 32,
s
.
.
-
..
.
,
- .
.
o
-
~.
,
, . ...
Washington Public Power Supply System
-2-
pg .g g
,
-
Enclosure:-
..
"
Inspection Report
4
_.
,
- No.r50-397/82-Q3-
,
,,
,
. -
-
,
bec:
DMB/ Document Control Desk-(RIDS)
.
. _ , .
'
r
Distributed by:RV:
'
. _
' State of IIA (Lewis)
_ -
.ResidentInspector.(5)
'
- .
.Engelken (ltr)
-
.
!:
=D.
Willett
-
i
t
j.
- 7
.
P
.
+
s
~
.
-
i
5
!
"
i.
-
'
>
4 _
. , ,
i
i
+
p
.
,
- .
,
! .-
s
,
,
'
t
,
[j .
s
t.
-
,
.
"
_
,-
1
.
I
. .
~
l'-
,
/ ".
-
'
.
4
l,-
-
, ;,
,
s
- .<
.)
. , > -
- ,
(. -
, ,
~'
?.
!
<
r.
-
I
l _
,
s
'
. r
r
.
.1
I
' #
t-
,
~
I.
_.} :.
.!
i .i.:
4
l
1,
'/
ll ' ..
,
.
l:
s
r.
,
'
'
-
j
ll
'
'
>
- ,
.
,
,
y'
'
s
N_ . .
,
.
i.
,
pnTEiuq$g
UNITED STATES
4,
y
n
NUCLEAR RE!UL/\\ TORY COMMISSION
g
j
REGION V
1450 MAAlA LANE. SUITE 260
Og * * * * * ,o'g
WALNUT CREEK, CALIFORMA 94596
FEB 2 61982
..
Docket No. 50-397
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention:
R. G. Matlock
Program Director, WNP-2
Gentlemen:
Subject: NRC Inspection of WNP-2 (Preoperational Test Phase)
This refers to the inspection conducted by Mr. D. J. Willett of this office
on February 1-4, 1982, of activities authorized by NRC Construction Permit
No. CPPR-93, and to the discussion of our findings held by the inspector
with Mr. J. Martin and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with. personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC 90lic Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the
requirements of 2./10(b)(1).
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
, % .v -&
D. M. Sternberg, Chief
Reactor Operations Projects
Branch
-
_ _ _ _
.
Washington Public Power Supply System
-2-
FEB 2 6 19M
Enclosure:
Inspection Report
.,
No. 50-397/82-03
,
..
.
. . _ _ . -
.
.-a
. .