OPERATING DATA REPORT DOCKET NO. 50-266 DATE March 8, 1982 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES

2. REPORTING PERIOD: FEBRUARY 1982
3. LICENSED THERMAL POWER (MWT):

1518.

4. NAMEPLATE' RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MUE):

497.

6. MAXInUM DEPENDABLE CAPACITY (GROSS MUE):

519.

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NunBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

445.0

10. REASONS FOR RESTRICTIONS, (IF ANY): Maximum dependable capacity reduced because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.

THIS MONTH YR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672 1,416 99.192
12. NUhBER OF HOURS REACTOR WAS CRITICAL 662.2 1,401.3 81,754.5
13. REACTOR RESERVE SHUTDOWN HOURS 9.8 10.5 617.8
14. HOURS GENERATOR ON LINE 652.3 1,383.5 79,35.7
15. UNIT RESERVE SHUTDOWN HOURS 19.7 21.6 785.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 847,563 1,800.013 109,152.853
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 285,050 603,410 36,624,690 30THD CHu
18. NET ELECTRICAL ENERGY GENERATED (MWH) 271,540 574,931 34,856,142 "O
19. UNIT SERVICE FACTOR 97.1 97.7 80.0

$jf

20. UNIT AVAILABILITY FACTOR 100.0 99.2 80.8 00
21. UNIT CAPACITY FACTOR (USING MDC NET) 81.6 82.0 72.0 Of
22. UNIT CAPACITY FACTOR (USING DER NET) 81.3 81.7 70.7
23. UNIT FORCED OUTAGE RATE 0.0 0.9 3.0 o

gl[j 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): None oo ota "D IV >.

gg -

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

OPERATING DATA REPORT DOCKET NO. 50-301 DATE COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES 9

REPORTING PERIOD: FEBRUARY 1982

3. LICENSED THERMAL POWER (MWT):

1518.

4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 672 1,416 83.977
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 75,806.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 193.0
14. HOURS GENERATOR ON LINE 672.0 1,416.0 74,474.6
15. UNIT RESERVE SHUIDOWN HOURS 0.0 0.0 178.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,005,969 2,112,219 102,369,063
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 339,240 712,490-34,735,500
18. NET ELECTRICAL ENERGY GENERATED (MWH) 324,885 682,178 33,065,644
19. UNIT SERVICE FACTOR 100.0 100.0 88.7
20. UNIT AVAILABILITY FACTOR 100.0 100.0 88.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 97.7 97.3 80.2 22.. UNIT CAPACITY FACTOR (USING DER NET) 97.3 96.9 79.2
23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling-outage scheduled for April 16, 1982, expected to last approximately 14 weeks.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH February, 1982 COMPLETED av TELEPHONE 414/277-2811

~

M C

W tn o 4

i 32 "a

BR sn

~

v'g g'g Cause and Corrective Action o

ao o

au o

co n e No.

Date g

mg g

jjg Licensee Event

{

e am o

oa Report No.

m EU T6 Prevent Recurrence 2

i O~

M o to c o

2:

O 8

i 2

820206 S

19.7 B

1 N/A The unit was shut down to repair a gasket leak on the "B"

loop cold leg RTD manifold orifice flange.

NOTE:

A REACTOR TRIP OCCURRED DURING THE SHUTDOWN DUE TO SPURIOUS INDICATION OF HIGH NEUTRON FLUX AS POWER DECREASED INTO THE SOURCE RANGE AND INSTRU-MENTS WERE AUTOMATICALLY i

ENERGIZED.

1 J

l 3

4 F: Forced Reason:

Method:

Exhibit G-Instruc-l S: Scheduled A-Equipment. Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry '

C-Refueling 3-Automatic Scram Sheets for LER File' j

D-Regulatory Restriction 4-Other (explain)

(NUREG-0161)

E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same AD-28B G-Operational Error (explain)

Source (01-78)

H-Other (explain)

sa 7 A, Z

-a co O

m ta H

m m.

E, mm OO D' N (D O O' g.

Type H

(D" Duration (Hours)

N i

2

???????yy aeason D,

i MW3Mm O O >g$ $$'$0 N $' m Method Of g

g ; ;; g g g ggf -

Shutting 3 5

m et P et W H (D 9 DOwn Reactor O

- M U O et P. D (D W

t/)

O O tt M O D W D 8

3:

I NDM M 4 3 et td O

'O W W 8 N O

P-3

  • i H H et M mM O

O O

N PWW W

W (D 2

O PM4Pm O P-(D D 8

5 D M D D 01 MH

'O to 3:

Z wM P. rt C

O (D U3 O

3M 8N Nm M

@P tD tD tt O

TA td M

Z es rt rt -

Z<

m O

O P-tD O (D t1 M

t4 0 X

3 N

T

'O PD

'U.

rt C

O H

O M

W 5

0 m

W N

M P-D P-N N

D m

D System 4

E

~

~

Code M

W D

M W

O N

O g

Compongnt Code w

us AWNH3 I I I I2et O

O>337 m

etcWWO 8C y rt U U Q.

O to CD 0 C C **

(D M3WW M

WHH MW O

- rt mD 8O (D P tt)

< D.

M3 MOO tD t4 4 0

'O M

DO M t1 Z

H U2 W tt O

'd tg HM AO5 N

T. 8 8M P. M NM OM 8

3m m (D ZOOZ wN OO tg Z

c rt tn 8 O

(n a

M P.

H: M M<

Z nH A O 3 T W W

O O C7 O m WO W Op w

M P-N tD O D P-tD 0

^

N P'

8 0&

M ct D 03 U*

ft N

4 O D W 7 0 O

U&

Qm W

M tt i

O en rt O

W H

o eb th O D

W N m t0 Y

$kO f-N w

Ds m H D

H O

m wyWMD H

W W W

M Di e to H

W B

W

'O ft N CD u

MWq mDMr P-H tt iO O

M

DOCKET NO.

50-266

~

UNIT NAME Point Beach Unit 1 DATE March 8, 1982 COMPLETED BY C. W.

Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

419 11 418 21 423 l

2 419 12 421 22 423 3

418 13 419 23 421 4

418 14 420 24 423 5

417 15 421 25 423 6

34 16 421 26 423

}

7 342 17 421 27 423 8

419 18 421 28 423 9

418 19 421 29 10 421 20 423 30 31 AD-28A (1-77)

DOCKET NO.

50-301

~

UNIT NAME Point Beach Unit 2 DATE March 8, 1982 COMPLETED BY C. W.

Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH February, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL DGWER LEVEL DAY MWe NET DAY MWe NET DAY MWo NET 1

482 11 480 21 475 2

482 12 485 22 488 3

481 13 482 23 492 4

481 14 484 24 485 5

486 15 487 25 485 i

6 5

476 16 485 26 488 3

l 7

478 17 486 27 489 8

463 18 486 28 489 s

' v.,

9 483 19 490 29 6

10 483 2d 484 30 31' s

1, 4

N

' ')

4 1

AD-28A i

(1-77)'

s

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date March 8, 1982 Completed By C. W.

Fay Telephone 414-277-2811 Unit 1 operated at 421 MWe net with one scheduled outage.

The unit was taken off line at 0534 hours0.00618 days <br />0.148 hours <br />8.829365e-4 weeks <br />2.03187e-4 months <br /> on February 6 to repair a gasket leak on the "B" loop cold leg RTD manifold

~ ~ '

orifice flange and returned to power at 0119 hours0.00138 days <br />0.0331 hours <br />1.967593e-4 weeks <br />4.52795e-5 months <br /> on February 7.

During Technical Specification testing of the 3D emergency diesel generator on February 7, the diesel failed to start on two attempts.

The event was due to the fuel rack being in the low fuel position and was reported as Licensee Event Report No. 82-03.

Safety-related maintenance included modification of the 3D and 4D emergency diesel generator control circuits, repair of the 3D governor, changeout of one cell in the "A"

train safeguards battery, installation of seismic restraints, and TMI electrical equipment backfitting.

l l

e s

/

/

  • o

/

P a

4 a

d-b

s NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-301 Unit Name Point Beach Unit 2 Date March 8, 1982 Completed By C. W.

Fay Telephone 414-277-2811 Unit 2 operated at 483 MWe net with no significant load reductions.