ML20041F286

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Feb 1982
ML20041F286
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/11/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC
Shared Package
ML20041F287 List:
References
NUDOCS 8203160363
Download: ML20041F286 (1)


Text

~

IHSCORSin Electnc mea coumr 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 March 11, 1982 W

Director of Regulatory Operations pgg U.

S. NUCLEAR REGULATORY COMMISSION d'

UA Washington, D.

C.

20555 A'

Gentlemen:

h MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT

/

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of February 1982.

Very truly yours, Assistant Vice President C. W. Fay Attachments Copies to J.

G.

Keppler - NRC, Region III NRC Resident Inspector C.

F.

Riederer - PSCW s, i A

8203160363 820311 PDR ADOCK 05000266 R

PDR