MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20113G2691996-09-20020 September 1996 Proposed Tech Specs Change 96-09, Clarification of Work Shift Durations for Overtime Limits ML20117J3391996-08-28028 August 1996 Proposed Tech Specs Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D1651996-08-22022 August 1996 Proposed Tech Specs of SQN Units 1 & 2,deleting Table 4.8.1, DG Reliability, & Revising Section 3.8.1 to Allow Once Per 18 month,7 Day AOT for EDGs ML20117D3121996-08-22022 August 1996 Proposed Tech Specs,Lowering Minimum TS ice-basket Weight of 1,155 Lbs to 1,071 Lbs.Reduced Overall Ice Weight from 2,245,320 Lbs to 2,082,024 Lbs ML20117D3141996-08-21021 August 1996 Proposed TS 3.7.1.3 Re Condensate Storage Tank ML20117D3341996-08-21021 August 1996 Proposed Tech Specs Re Deletion of Surveillance Requirement 4.8.1.1.1.b ML20112H0431996-06-0707 June 1996 Proposed Tech Specs,Revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N7071996-04-0404 April 1996 Proposed Tech Specs,Allowing Conversion from Westinghouse Fuel to Fuel Provided by Framatome Cogema Fuels ML20096B3761996-01-0404 January 1996 Proposed Tech Specs Extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20096C2481996-01-0303 January 1996 Proposed Tech Specs,Revising Bases Section 3/4.7.1.2 to Indicate Current Operational Functions of turbine-driven AFW Level Control Valves Modified During Unit 1 Cycle 7 Refueling Outage 1999-08-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20204E8501999-03-21021 March 1999 Plant,Four Yr Simulator Test Rept for Period Ending 990321 ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199F8231997-11-30030 November 1997 Cycle 9 Restart Physics Test Summary, for 971011-971130 ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20203B9731997-08-0505 August 1997 Rev 1 to RD-466, Test & Calculated Results Pressure Locking ML20217J5581997-07-31031 July 1997 Cycle Restart Physics Test Summary, for Jul 1997 ML20210J1671997-04-30030 April 1997 Snp Unit 1 Cycle 8 Refueling Outage Mar-Apr 1997,Results of SG Tube ISI as Required by TS Section 4.4.5.5.b & Results of Alternate Plugging Criteria Implementation as Required by Commitment from TS License Condition 2C(9)(d) ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20134J9991996-09-23023 September 1996 Fuel Assembly Insp Program 1999-08-30
[Table view] |
Text
9 0
ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATIONS FOR SRQUOYAH NUCLEAR PLANT f
8203080614 820303 p DR ADOCK 05000327 PDR
l i
PROPOSED TECilNICAL SPECIFICATIONS SEQUOYAll NUCLEAR PLANT
~
UNIT 1 l
t __ .
PLANT FACErTV ORQ1Ntf17@e-SEOuovi+4 StKt pe t# TE NDE N T ,
g M * .a 43 C
O I"~ tires &N OF--~ 1
- d 8I NUCLE AR POwCR l OUAtrTV A SSU't ANCEe g AmeO COUPLIAreCE I
!! t _ _ ence _ _j pH 8""I uANAGLR . _ , , , . , , , . , . ,
p TEOe4*C AL CHE.F FIELD OUALTTY l OU4lffY rF
- - - - _ _ _ _ _ _ _c_ S_tTE 1 A S';LM ANCE ST AFF $ ASSURANCE N'E - ' " - ---
uANAGLf4 g, ,,
SA# L1 T f NL.#4 LHret.) s cR.w :wt"wei 0ffsite
--_- OUAlfTY ASSURANCE .
SECTON Onsite OUALITY m
ASSLKLANCE ~ ~OfV ~ Mk hF OUALITY COORDNATOR j NUCLEAR POWER AS$fD4ANCE g FIELD SERvCCS ENCnEERs L _ _ Ja'"C."_ _ '
I j 8 9 e
ENGINEERING & OPERATIONS HEALTH & SAFETY SERVICES MAINTENANCE l l l l l 45515Y ANT ASSISTANT ,
A$51$7 ANT PLANT etANT (__OmSONOr l I etANT SERV 1CES St.rERNTE NDENT SLPCRNTURNT 4 POWE.R SYSTEuS 8 SisTJtNTENUCNT L _ _OPUI ATONS______J l
r-- ; N---I r------- , ,_________
g g I PUBLC SAFETY 8 e l l uf DC AL uEDCAL -- -- SECLKWTY ---a 8 ENGe4E E R**G OPER A FONS 3 '
3
$CRVCES l uCCH ANIC AL NSTRUutvf ELE C TRC AL SECTON SECTON L.--_. ___J L_________I ,50 w^nTtNANCE u AnnN Am u A nTEN Am SECTON SECTON SECTON SUPERvSOR SUPERVfSOR g SLPERytSOR SUPER N SUPERVISOR r - NC N OF---- 7 r- DivtSCN OF----- 7 g g HEALTN POWER , -g e OCCLPATCNAL , pqyggg .<._.
STORES 9 OMRTY y DEuCAL traf 8 N aCAL R$ TECHNIC AL ENORS TECHNICAL ENGRS OrER S I MEALTM & SAFETY l l Surm,504 _
,E C ro,,
t________ L _ _&____._s SLRVfCES ,onoe. ,ORtuo. ,OREuCN SUPE pveSOR otArTSutM CRAFTSMEN CRAFTSMEN gag Div SON OF l TR A UNG g I NUCLE AR POWER
[NGMEERNQ & SMFT ENGe#EER - - - - = * = - - -
g y JANTTORIAL & .
TE ST UNff SRO LABORER SERvlCES
@JPEKvaSOR SUP(RviSOR AS57 SarT l
[Ncevt E R l p_q .
REACTOR sRo *SArETv ! n ANT u AN AGr utNT -
g ENCTdEERNG UNIT _ ENCe.1rTrssG COuPLIANCE SERVICE S [. a Sur[xvcOR StrEnvuoR SuetRviSOR SurcRveOR fire protection uN,7OeERATOR - - - - -
Communication ReportInr' Figure 6.2-2
l l
f l
t l
l l ~
ADMINISTRATIVE CONTROLS -
6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit, staff shall be maintained under the direction of the appropriate Assistant Plant Superintendent and shall meet or exceed the requirements and reccommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55 and the supplemental requirements specified in Section A and C of Enclosure 1 of the March 28,1980 NRC letter to all licensees, and shall include familiarization with relevant ~
industry operational experience identified by the ISEG.
6.5 REVIEW AND AUDIT
~
5.5.0 The Manager of Power is responsible for the safe operation of all TVA power plants. The functional organization for Review and Audit is shown on Figure 6.2-1.
6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)
FUNCTION 6.5.1.1 The PORC shall function to advise the Plant Superintendent on all
. matters related to nuclear safety.
COMPOSITION
- 6. 5.1. 2 The PORC shall be composed of the:
Chairman: Plant Superintendent Member: Operations Supervisor Member: Engineering Supervisor I '
Member: Instrument Maintenance Supervisor Member: Electrical Maintenance Supervisor Member: Health Physicist ,
M1mber: Supervisor Quality Assurance Staff Member: Mechanical Maintenance Supervisor l-l
?^-*
i]
, SEQUOYAH - UNIT 1 6-7a -l
ADMINISTRATIVE CONTROLS
- h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Plant Superintendent or the Nuclear Safety Review Board.
- i. Review of the Plant Physical Security Plan and implementing procedures and shall submit recommended changes to the Nuclear Safety Review Board.
f
- j. Review of the Site Radiological Emergency Plan and implementing procedures and shall submit recommended changes to the Nuclear Safety Review Board.
- k. Review of every unplanned onsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence to the Director, Nuclear Power Division and to the Nuclear Safety Review Board.
- 1. Review of changes to the radwaste treatment systems.
- m. Review of meeting minutes of the Radiological Assessment Review Committee (RARC).
AUTHORITY 6.5.1.7 The PORC shall:
ei Recommend in writing to the Plant Superintendent approval or ,
disapproval of items considered under 6.5.1.6(a) through (d) above.
- b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (d) above constitutes an unreviewed. safety question.
- c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Director, Nuclear Power Division and the Nuclear Safety Review Board of disagreement between the PORC and the Plant Superintendent; however, the Plant Superintendent shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.
RECORDS 6.5.1.8 The PORC shall maintain written minutes of each PORC meeting that, at a minimum, document the results of all PORC activities performed under the responsibility and authority provisions of these technical specifications.
Copies shall be provided to the Director, Nuclear Power Division and the Nuclear Safety Review Board.
6.5.2 NUCLEAR SAFETY REVIEW BOARD (NSRB) r FUNCTION 6.5.2.1 The NSRB shall function to provide independent review and audit of designated activities in the areas of:
SEQUDYAH - UNIT 1 6-9
ADMINISTRATIVE CONTROLS ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PORC activities at any one time.
MEETING FREOUENCY 6.5.1.4 The PORC shall meet at regular monthly intervals and as convened by the PORC Chairman or his designated alternate.
OUORUM
~
6.5.1.5 The minimum quorum of the PORC necessary for the perf#.aance of the PORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and five members including alternates.
RESPONSIBILITIES 6.5.1.6 The PORC shall be responsible for:
- a. Review of 1) all procedures required by Specification 6.8.1 and changes thereto, 2) all programs required by Specification 6.8.5 and changes thereto, 3) any other proposed procedures or changes
) ! thereto as determined by the Plant Superintendent to affect nuclear safety.
- b. Review of all proposed tests and experiments that affect nuclear safety.
1 i c. Review of all proposed changes to Appendix "A" Technical Specifications.
- d. Review of all "roposed changes or modifications to unit systems or equipment that affect nuclear safety.
- e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation
' and recommendations to prevent recurrence to the Director, Nuclear Po,<er Division and to the Chairman of the Nuclear Safety Review
- Beard.
- f. Review all written reports rc. quiring 24-hour notification to. the Cc: mission.
- g. Review of unit operations to detect potential nuclear safety hazards.
(
! L l
SEQUOYAH - UNIT 1 6-8 a l i
l l
O Qt b 9 e
PROPOSED TECHNICAL SPECIFICATIONS SEQUOYAH NUCLEAR PLANT ,
UNIT 2
t th ""
- t'1 FACtrTv OncAMEATVN-SEOuovAN SwtpraTINfit NT ,
g
~
~DN
~ E6N OY ~ '
'0U ALITY A SSUR ANCE O
g , ANO COuPtlANCE ,
H3 L - _ EDE . _ J N Wat4AGLR "
TECHW AL f ~ ~ ~ CW"~~
I SUPPORT OU4UTY g FELD OUALTTY 8
- - _ _ - - - - - = - _O_FF SrrE - 8 ASSUFT ANCE ST AFF $ A SSLKIA NCE cn Onsnt t_-_ _._-2 %8ANAG(FI 1 e.Ut3eNoLNI D Saf L T Y f NC.NL LHaNG
- v. oui- Siruivism 0ffsitc
""~~~~ - " * - "
OUAtrTY ASSun ANCE -
SECTON Onsite OUAlffY I AS$mA~CE ;-- o,v srO;rt>, ,
OUAUTY COORON A TOR j NUCLEAR POWLR g ASSURANCE , FELD SERvtCES 8 ENCNEERS b - E" C" - _ _J l f
ENGINEERING & OPERATIONS HEALTH & SAFETY SERVICES MAINTENANCE !
I I 1 A SSr3 T ANT ASSISTANT ASSa37 ANT PLANT PLANT c'- ,
DrVISON OF----- PLANT rm 8 I SERVCES SLPERNTENDENT SUPCRflTDCENT I POWER SYSTEMS 4 STERNTENDOff L _ _OPER ATONS--.__ J l
f"---------
r OfvtSON OF--___- l PUBLC S AFETY I e
) $
l ufDeCAL '
WEDICAL .....- SECLrtrry W SERVICE S 9
E NGt4E L NWG OPER A TONS , , g l ME CH ANC AL IN S T HLMENT EL ECTRC AL SECTON l_----__J L-__--____I uaNTtNANCE uANTtNANCE u A e, TEN ANCE SEC TION PSO SE CTON SECT ON SEC TION SUPCRytSOR FUPERytSOR gno gyggvison surggvison SUPERvtSOR r - NtSON C OF---- 7 F - OlVISON OF-----7 ~
g ; HEALTH power g t OCCUPA TIONAL , pqyg,gg ...,_.
STORES 9 PROPERTY ,
,33 g, CHEMCL UNIT TIQf4 CAL D4 GAS TECHNICAL ENGRS TECHNICAL ENCRS 0 NEALTH & $AFETY l 8 l
OPER A TON $
'-------; L- & $[RylCES
.2 n>nn<n rOREwee rOREuo.
SteLRviSOa -
St C noN Swt 84 VISOR g M aWEN CRAFTsuCN CR AFTSME N TRANNQ
________3 D ISON OF NUCLE AR POWER I
'O E PERSONNEL l M SHrf ENCHEER - - - _ - _ _ . JANfTORIAL & ,
AD" L SEnvicr_S ST Ar_r_ j T[ST UNff -
SRO LABOAER SERVICES SUPv wvr$0a '"""' "
l LEGEND:
ASST Sury l ENcm4E ER l p___q REACTOR spo *SArrTV n ANT M AN A GEMENT l Offsite
- Responsible for ENGHEEINQ UPa7 _, ENCNETT38G COMPLIANCE SERVICES L. _- l4 SUPERytSOR SUPERv1SOR SUPERvlSOR SurtRviSOR fire rotection uNiTOPERATOR Communication no Reporting
< . ..v ,
l .
4 i
I ADMINISTRATIVE CONTROLS i
1 6.4 TRAINING i
6.4.1 A retraining and replacement training program for the unit' staff shall be niaintained under the direction of the appropriate Assistant Plant Superintendent
!_ and shall meet or exceed the requirements and reccommendations of Section 5.5 of
! ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55 and the supplemental requirementsspecifiedinSectionAan'dCofEnclosure1oftheMarch28,198g
- NRC letter to all licensees, and sha?' include familiarization with relevant' i industry operational experience identified by the ISEC.
2
- 6. 5 REVIEW AND AUDIT
~
j 6.5.0 The Manager of Power is responsible for the safe operation of all TVA j
power plants. The functional organization for Review and Audit is shown on Figure 6.2-1.
I
- 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC) i FUNCTION -
4 6.5.1.1 The PORC shall function to advise the Plant Superintendent on all 4 . matters related to nuclear safety.
j COMPOSITION
] 6. 5'.1. 2 The PORC shall be composed of the:
, Chairman: Plant Superintendent
{ Member: Operations Supervisor
- Member
- Engineering Supervisor '
- Member
- Instrument Maintenance Supervisor Member: Electrical Maintenance Supervisor Health Physicist i Member:
j Member: Supervisor Quality Assurance Staff Mechanical Maintenance Supervisor i Member:
l l .
1 i
i I
4 !
SEQUOYAH - UNIT 2 6-10
l
-l ADMINISTRdTIVECONTROLS ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PORC activities at any one time.
MEETING FRE00ENCY '
- 6. 5.1. 4 The FORC shall meet at regular monthly intervals and as convened by the PORC Chairman or his designatec alternate. '
QUORUM i
- 6. 5.1. 5 The minimum quorum of the PORC necessary for the performance of the PORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and five members including alternates.
' RESPONSIBILITIES
- 6. 5.1. 6 Tne PORC shall be responsible for:
I
! a. Review of 1) all procedures required by Specification 6.8.1_and I
changes thereto, 2) all programs required by Specification 6.8.5 and changes thereto, 3) any other proposed procedures or changes thereto as determined by the Plant Superintendent to affect nuclear safety.
- b. Review of all proposed tests and experiments that affect nuclear safety.
- c. Review of all proposed changes to Appendix "A". Technical Specifications.
- d. Review of all proposed changes or modifications to unit systems or equipment that' affect nuclear safety. '
- e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Director, Nuclear Power Division and to the Chairman of the riuclea.- Safety Review Board.
- f. Review all written reports requiring 24-hour notification to the Cc. ?.i s s i on.
g.
. Review of unit operations to detect potential nuclear safety' hazards. -
f L
SEQUOYAH - UNIT 2 6-11 4
, , - r -- - , '
t ADMINISTRATIVE CONTROLS I
- h. Performan_e of special reviews, investigations or analyses and k reports thereon as requested by the Plant Superintendent or the Nuclear Safety Review Board.
- i. Review of the Plant Physical Security Plan and implementing procedures i and shall submit recommended changes to the Nuclear Safety Review Board.
- j. Review of the Site Radiological Emergency Plan and implementing procedures and shall submit recommended changes to the Nuclear Safety Review Board.
- k. Review of every unplanned onsite release of radioactive material to the environs including the preparation and forwarding of reports covering evaluation, recommendations and disposition of the corrective
- action to prevent recurrence to the Director, Nuclear Power Division and to the Nuclear Safety Review Board.
- o. 1. Peview of changes to the radwaste treatment systems.
- m. Review of meeting minutes of the Radiological Assessment Review Ccmaittee (RARC).
AUTHORITY 6.5.1.7 The PORC shall:
ri Recommend in writing to the Plant Superintendent approval or , i disapproval of items _ considered under 6.5.1.6(a) through (d) above.
) b. Render determinations in writing with regard,to whether or not each a
item considered under 6.5.1.6(a) through (d) above constitutes an unreviewed safety question. '
- c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Director, Nuclear Power Division and the Nuclear Safety Review Board of disagreement
!' between the PORC and the Plant Superintendent; however, the Plant Superintendent shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.
RECORDS 4
6.5.1.8 The PORC shall maintain written minutes of each PORC meeting that, at a minimum, document the results of all PORC activities performed under the responsibility and authority provisions of these technical specifications. >
Copies shall be provided to the Director, Nuclear Power Division and the Nuclear. Safety Review Board.
6.5.2 NUCLEAR SAFETY REVIEW BOARD (NSRB)
FUNCTION 6.5.2.1 The NSRB shall function to provide independent review and audit of-
' designated activities in the areas of:
SEQUOYAH - UNIT 2 6-12
ENCLOSURE 2 I JUSTIFICATION FOR PROPOSED CHANGES TO SEQUOYAH' NUCLEAR PLANT (SNP)
UNIT 1/2 TECHNICAL SPECIFICATIONS The purpose of this proposed change to the SNP unit 1 and 2 technical specifications to reflect the recent SNP reorganization and to make. the PORC membership consistent with other TVA plants. The reorganization within the Division of Nuclear Power (NUC PR) established three assistant Plant Superintendents as indicated on Figure 6.2-2. Each of these superintendents is responsible for the training and/or retraining of that respective portion of the unit staff under his supervision. ,
4 f
+4Y~-