ML20041D354

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/81-36 on 811130-1204 & Notice of Violation
ML20041D354
Person / Time
Site: Pilgrim
Issue date: 02/16/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20041D355 List:
References
NUDOCS 8203050255
Download: ML20041D354 (2)


See also: IR 05000293/1981036

Text

(

n n rb

FEB 1e 19gg

'.

/

Docket No. 50-293

('

'

'

MCmveo

9

Boston Edison Company M/C Nuclear

95

MAR 04 79826 2

,

ATTN:

Mr. A. V. Morisi

-

1

Nuclear Operations Support Manager

N

  • eeYr

800 Boylston Street

ne

Boston, Massachusetts

02199

f

Gentlemen:

503

SUBJECT:

Inspection No. 50-293/81-36

This refers to the routine inspection conducted by Mr. G. Napuda of this

office on November 30 - December 4, 1981 at the Pilgrim Nuclear Power

Station, Plymouth, Massachusetts and at your Boston, Massachusetts corporate

office of activities authorized by NRC License No. DPR-35 and to the discussions

of our findings held by Mr. G. Napuda with H. Brannan, R. Machon, A. Morisi

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as

set forth 1.1 the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels described

in the Federal Register Notice (45 FR 66754) dated October 7, 1980.

You

are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt fro:n disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information. Consistent with section

z.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

RI

I

RI:DET

ETI

RI:DETI

g

Napuda/dmg

Caphto g E

ter

M rtin

4

12/28/81

il66

%

gg {

8203050255 820216

PDR ADOCK 05000293

0FFICIAL RECORD CnPy

i

G

PDR

j

,

.

sostonEdisonCompany

2

s

l

placed in the Public Document Room. The telephone notification of your

intent to request withholding, or any request for an extension of the 10

i

day period which you believe necessary, should be made to the Supervisor,

i

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

l

Your cooperation with us in this matter is appreciated.

.

Sincerely,

i

c.ficinal Sir;.ua by: O. E

Thomas T. Martin, Director

Division of Engineering and Technical

Inspection

'

Enclosures

i

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-293/81-35

,

cc w/ enc 1:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

,

-bec w/ encl:

4

I

Region I Docket Room (with concurrences)

i

Chief, Operational Support Section (w/o encis)

i

'

0FFICIAL RECORD COPY

I

,

i

u

._