ML20041C852

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/82-02 & 50-366/82-02 on 811221-820120.No Noncompliance Noted
ML20041C852
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/02/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20041C853 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8203020610
Download: ML20041C852 (2)


See also: IR 05000321/1982002

Text

-

.

.

,

7

'

\\ ell e,u3

FEB 02 BN

!

s

o

t

t

//

Georgia Power Company

S

\\'9

ATTN: Mr. J. H. Miller, Jr.

RECEWFD

Executive Vice President

p

,J, .g 3

ggp, g

P. O. Box 4545

o-

-

.-

ujj%N7 /C

Atlanta , GA 30302

/g/f

r.cc

Gentlemen:

'h

M

Jgrg

'

Subject:

Report Nos. Q1/82-Thind 50-366/82-02

This refers to the routine safety inspection conducted by Mr. R. F. Rogers of

this office on December 21, 1981 - January 20, 1982, of activities authorized

by NRC Operating License Nos. DPR-57 and NPF-5 for the Hatch facility and to

the discussion of our findings held with Mr. T. Greene, Assistant Plant lianager,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

!

'

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

4

I

cation to withhold infonnation contained therein within thirty days of the date

{

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

f3

Paul J. Kellogg, Chief

Reactor Projects Branch 2 Division

of Resident and Reactor

Project inspection

Enclosure:

>

Inspection Report Nos. 50-321/82-02

and 50-366/82-02

cc w/ encl: see page 2

8203020610 820202

PDR ADOCK 05000321

[k[ .c

0

PDR

--

.

.

,

a

2

FEB 0 21982 -

Georgia Power Company

.

cc w/ encl:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

fl. Manry, Plant ihnager

T. Greene, Assistant Plant Manager

C. E. Belflower, Site QA Supervisor

bec w/ encl:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

Document Ihnagement' Branch

State of Georgia

RII:RRPI

RII: RPI

RII:RRPI

RII:R

d'[ Rogers:gr

W

JW

JFRogge

V,LBrownlee

PJ

1/ /82

1/ /52-

$1

/82

(2/gr/82

3

1/

t

.