ML20041C850
| ML20041C850 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 02/02/1982 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20041C851 | List: |
| References | |
| NUDOCS 8203020609 | |
| Download: ML20041C850 (2) | |
See also: IR 05000369/1981039
Text
y
.
.
.
FEB 0 21992
\\ "'
O
/%
'! /
Duke Power Company
S
%
ATTN: Mr. W. O. Parker, Jr.
rigcayga Q
Vice President, Steam Production
-
P. O. Box 2178
D
MAftl
1982> uq
Charlotte, NC 28242
r. m m u'u n,m: C
g
r;agA n
Gentlemen:
y
Subject:
Report No. 50-369/81-39
This refers to the routine safety inspection conducted by fir. P. Bemis of this
office on November 23 - December 23, 1981, of activities authorized by NRC
Operating License No. NPF-9 for the McGuire facility and to the discussion of our
findings held with !!r.11. D. McIntash, Plant !!anager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by. the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date cf this letter. Such application must be consistent with the requirements
of2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Project Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-369/81-39
cc's see page 2
8203020609 820202
PDR ADOCK 05000369
G
s
.
.
.
.
Duke Power Company
2
cc w/ encl:
it. D. ficIntosh, Plant Manager
J. T. Moore, Project lianager
bcc w/ encl:
NRC Resident Inspector
Document flanagement Branch
State of florth Carolina
RII
RII
RII
RII
0,) ct'sk
& cf
6d %i
PBMmis:dt
Algn tonis
JBfh$nt
PJ llogg
1/Jf/82
1/#7/82
1/#f/82
y
alzhv