Forwards IE Insp Repts 50-413/82-02 & 50-414/82-02 on 820105-08.No Noncompliance Noted
ML20041C813
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/03/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20041C814 List:
References
NUDOCS 8203020580
Download: ML20041C813 (2)


See also: IR 05000413/1982002

Text

_ -_

________ ___

__

y

.

.

,

i

FEB 0 31982

c Is%

Duke Power Company

('A

p

ATTN:

Mr. W. O. Parker, Jr.

sf-

s

Vice President, Steam Production

i'f

, G g g "n , ~J

.

P. O. Box 2178

'-

N91

19 3

C

[Q{\\ ' * fdm d;. ' I(C

. Charlotte, NC 28242

..

Gentlemen:

s.

Subject: Report Noh13/82-

h

d 50-414/82-02

\\s i'[Ts;

~

This refers to the routine safety inspection conducted by Mr. N. Economos of

this office on January 5-8, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for tFe Catawba Nuclear Station facility and

to the discussion of our findings held with Mr. J. C. Rogers, Project Manager,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consis .ed of

selective examinations of procedures and representative records, interviews wi'.h

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-413/82-02

and 50-414/82-02

cc w/ encl:

See Page 2

i

<

0203020580 820203

hDRADOCK03000

[Q[

_ _ _ _ _ _ _ . _

Oil

r

.

e

'

FEB 0 31982

-

'

Duke Power Company

2

cc w/ encl:

J. W. Hampton, Station Manager

J. C. Rogers, Project Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of North Carolina

' SR['

RII

k

RII_d

R1Q

v '(k

RII

RII

60

u

p;

N Econ of50 s : h t -

" I,; ie rd t

  1. CEMurphy

JA01shinski

AIg

to

R

wi

1M7/82

1M/82

S/ I /82

, 1/ /82

f/ou82

2

/8