Proposed Tech Spec Table 3.2-2 Re HPCI Turbine Steam Line High Flow Isolation Setpoint.Safety Evaluation Encl
ML20041C758
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/24/1982
From:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20041C745 List:
References
NUDOCS 8203020539
Download: ML20041C758 (4)


Text

_

F

/*

, A* .

ATTACHMENT I PROPOSED TECHNICAL SPECIFICATIONS CHANGE RELATED TO s

HPCI STEAM LINE HIGH FLOW ISOLATION l

l j POWER AUTHORITY OF THE STATE OF NEW YORK

! JAMES A. FITZPATRICK NUCLEAR POWER PLANT l DOCKET NO. 50-333 i

t i

t l ..

! 8203020539 B20224 PDR ADOCK 05000333 P PDR

JAFNPP .

TABLE 3.2-2 (cont'd)

INSTRUMENTATION THAT INITIATIONS OR CONTROLS THE CORE AND CONTAINMENT COOLING SYSTEMS .

Minimum No. Total of Operable Number of Instru-Instrument ment Channels Pro-Item Channels Per vided by Design for No. Trip System (1) Trip Function Trip Level Setting Both Trip Systems . Remarks 29 1 RCIC Steam Line/ < 40 F Above 2 Inst. Channels Close Isolation Valve Area Temperature max. ambient in RCIC Subsystem 30 1 RCIC Steam Line 100> P> 50 psig 2 Inst. Channels Close Isolation Valves Low Pressure in RCIC Subsystem 31 1 HPCI Turbine Steam 5. 1061n H 2O 2 Inst. Channels Close Icolation valves Line High Flow in HPCI Subsystem 32 1 RCIC Turbine High < 10 psig 2 Inst. Channels Close Isolation valves Exhaust Diaphragm Pressure, in RCIC Subsystem 33 1 HPCI Turbine High 5,10 psig 2 Inst Channels Close Isolation Valves Exhaust Diaphragm Pressure in HPCI Subsystem 34 1 LPCI Cross-Connect NA 1 Inst. Channels Initiates annunication Position when valve is not closed 35 1 HPCI Steam Line 100>P>50 psig 2 Inst. Channels Close Isolation Valve Low Pressure in HPCI Subsystems 36 1 HPCI Steam Line/ < 40 F 2 Inst. Channels Close Isolation Valve Area Temperature ~ above max. ambient ,

in HPCI Subsystem Amendment No. V4, 48 70b

o*

e l_ . . .

4 i

1 1

i ATTACHMENT II l

SAFETY EVALUATION I RELATED TO HPCI STEAM LINE HIGH FLOW ISOLATION i

d i

A d

i 4

.3 POWER AUTHORITY OF THE STATE OF NEW YORK

, JAMES A. FITZPATRICK NUCLEAR' POWER PLANT l

DOCKET NO. 50-333 g h h

l l

(

4

~

L. , ' .

Section I - Description of Modification The proposed change to the James A. FitzPatrick Nuclear Power Plant (JAFNPP) Operating License, Appendix A (Tbchnical Specifications) revises the High Pressure Coolant Injection (HPCI) turbine steam line high flow isolation setpoint. This setpoint is given in Table 3.2-2 of the Technical Specifications (page 70b).

Section' II - Purpose of the Modification The proposed change revises the HPCI turbine line high flow isolation setpoint in the downward, conservative direction as a result of a reanalysis based on actual steam flow data.

Section III - Impact of the Change This change assures that the isolation setpoint conforms to the Bases as stated in the Technical Specification.

Section IV - Implementation of the Modification The modification as proposed will not impact the Fire Protection or ALARA Programs at JAFNPP.

Section V - Conclusion

, The incorporation of this modifications: a) will not change the probability nor the consequences of an accident or malfunction of equipment important to safety as previously evaluated in the Safety Analysis Report; b) will not increase the possibility for an accident or malfunction of a different type than any evaluated previously in the Safety Analysis Report; and c) will not reduce the margin of safety as defined in the basis for any s Technical Specification;' and d) does not constitute an unreviewed safety quewtion.