Forwards IE Insp Repts 50-327/81-41 & 50-328/81-50 on 811207-11 & Notice of Violation
ML20041C713
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/31/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041C692 List:
References
NUDOCS 8203020496
Download: ML20041C713 (2)


See also: IR 05000327/1981041

Text

elbY

..

DEC 311981

Tennessee Valley Authority

ATTN:

Mr. H. G. Par.-i s

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report No

32781-

and 50-328/81-50

This refers to the rout'ine safety inspection conducted by Mr. T. R. Collins of

this office on Decmeber 7-11, 1981, of activities authorized by NRC Operating

License Nos. DPR-77 and DPR-79 for the Sequoyah facility. Our preliminary find-

ings were discussed with you and members of your staff at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning thf: b tter, we will be glad to discuss

them with you.

i t.

ely,

4;s

3

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

See Page 2

8203020496 820222

PDR ADOCK 05000327

O

PDR

-

DEC 311981

"

-

-

-

Tennessee Valley Authorf ty

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-327/81-41

and 50-328/81-50

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project Manager

C. C. Mason, Plant Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee -

1

I

t

RI

RII

R

R?I

RII

r

b

MI

Rdr,N

/

ienjak

RCL

Y

T Collins:ht

C Ho e

AF

son

J 01shinski

12////81

12g/81

12p/81

12th/81

12q[/81

12/3f81