Proposed Change to Tech Specs Consisting of one-time Extensions in Surveillance Period to Be Consistent W/Refueling Outage Start Date of 820319ML20041C663 |
Person / Time |
---|
Site: |
Davis Besse ![Cleveland Electric icon.png](/w/images/7/78/Cleveland_Electric_icon.png) |
---|
Issue date: |
02/23/1982 |
---|
From: |
TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20041C661 |
List: |
---|
References |
---|
TAC-47999, NUDOCS 8203020440 |
Download: ML20041C663 (7) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
e-oom Eo *
>8 88 O Jm o o b -TABLE 4.3 1 -
5 gg U oo En a8U REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS hm EU CHANNEL MODES IN WHICH CHANNEL FUNCTIONAL SURVEILLANCE E CHANNEL Z TIONAL UNIT CHECK CALIBRATION TEST REQUIRED Manual Reactor Trip H.A. N.A. S/U(1) N.A.
1.
- 2. High Flux S O(2), and Q(7) il 1, 2 R M 1, 2 RC High Temperature
- 3. S
- 4. Flux - oFlux - Flow S(4) M(3) and Q(7,8) M 1, 2 R+ M 1, 2
- 5. RC Low Pressure S
- 6. RC High Pressure S Rt M 1, 2 H 1, 2 w 7. RC Pressure-Temperature S R s
- 8. High Flux / Number of Reactor 1, 2
" M -
- Coolant Pumps On S R sR M i, 2
- 1. Containment High Pressure , S
- 10. Intermediate Range, Neutron 1, 2 and* l Flux and Rate S R(7) S/U(5)(1)
S 11. Source Range, Neutron Flux 2, 3, 4 and S and Rate S R(7) M and S/U(1)(5) h N.A. M and S/U(1) 1, 2 and*
S 12. Control Rod Drive Trip Breakers N.A.
N.A. M 1, 2 and*
- 13. Reactor Trip Module Logic N.A.
g 2**,3**,4**,5**
Shutdown Bypass High Pressure S R H 14
-t- Eighteen-month surveillance test due in March 1982 delayed until March 31, 1982.
+
TABLE 4.3-1 (CnntinEd)
NOTATION
- - When Shutdown Bypass is actuated.
(1) - If not performed in previous 7 days.
Heat balance only, above 15% of RATED THERMAL POWER.
(2) -
(3) - WhenTHERMALPOWER[TP]isabove30%ofRATEDTHERMAL POWER [RTP],compareout-of-coremeasuredAXIALPOWER IMBALANCE [ API ] to incore measured AXIAL POWER I
[ APIg ]. Recalibrateif:
h [ API g - API;] >_ 3.5%
AXTAL POWER IMBALANCE and inop flow indications only.
(4) -
(5) - Verify at least one decade overlap if not verified in previous 7 days.
(6) - Each train tested every other month.
Neutron detectors may be excluded from CHANNEL CALIBRATION.
(7) -
Flow rate measurement sensors may be excluded from CHANNEL (8) -
However, each flow measurement sensor shall be CALIBRATION.
calibrated at least once per 18 months.+
l -t- Eighteen-month surveillance test due in March 1982 delayed until l March 31, 1982.
i l
DAVIS-BESSE-UNIT 1 3/4 3-8
M O .
v
-w N W U
_s gw .MMmmMe e e o e M e
N
= #
mw- M
- w>D N e o e CNC N o e o e e e
e e . = . e e e n c w e ----- e e e -
xWa J
~ - -
Jo Nm w -
w- E
=~ ~~
% % I r T I I
J- ==IC=
<Ce m ==-
ww-
~ H
- H I u w g G ='
- C 3
= -
u a
J<
w= k n a a a a = = = xg
== mCmc=c w Z- a a <a g
= =< y
< GV, N
J. m d
~ m W W
> 4 C
= U k
ml a
< < 5
= w W = = m A
=M m m m m C,
-l =u mmmmmm C H <A H
< ==
N - ou U s = 0 m w / T
= I w = u C m W W e G 4 m
=, C M C W O
< E Le G D U 7 & C U L & &> >= U C Cw ga Z C M e C C L O y @U
- G ym L M c- m WJ A e c O- e E em mD H e, OSE C LQ C C Ce u H c c.
eE
=
> - a 6 -
wL w m = =x --
m e 1 e
d n C- U
& CC C Ca e vu >
= e 3 C O- 3 E U k C e e C " C C O 0
- C Cy k J U U C 'CC Jo U - (n W' C U U M . . .C m1 m .
k k y y yeJg
<, =
.. . . .a ..
w " E> J AN p es Nm n w am W < ++ 0 C -
m m m m mm "m C 3 m
= Cm OmL O
" *Js+JJ C JC e ~C T
e
- e 3 U a =
om G
i 9 6 L e eJ W W W u hm m m
> e> > > L au = a e c we e G- = CCM u Cm w
= JaaL L U CU CL U C G Ju O vvC Um u J -OJ O OJ CJ umv U U C C C 3+ 3-
D -
M U +U ax ~ ~ue - un e c C Ch'C Uee-> aaa"ubC
& wcc
< - u C eC uC xC < w O 4@ o p
w m wog U U U U U U eU a E-w -- L LJ - U-V e-C OV9CV9V LV E N W e J w2 w
W mem11 O C-a-3 u m a w a - U-
< cmc w M'l
=. w
= a-a C C Ceme J u-u-ou-umum C C C C C 6 C O U
=
w W D I O C OUW3 - - - - - J m.v u m a e
vuve=m m o =
< s - a = c m e, m ~ < . . u
= . . . . . . m . . . .
o r = o m a -
= .oumo- o e o u e a . .
= .
. M <
2 ~ .
m -
Amendment t!o. 37,40 3/4 3-21 l DAVIS-EESSE. UNIT 1 1 f
9 1
TABLE 4.3-11 3
5 STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM T
, INSTRUMErfiAT10N_ SURVEILLANCE REQUIREMENIS 9, .
m
" CHANNEL CHANNEL FUNCTIONAL s CHANNEL CilECK CALIBRATION 4 TEST 5 FUNCTIONAL UNIT
~
- 1. Instrument Channel R H
- a. Steam Line Pressure - Low S R H
- b. Steam Generator Level - Low S R M
- c. Steam Generator - Feedwater S Differential Pressure-High Reactor Coolant Pumps-Loss of S R M d.
NA NA R g 2. lianual Actuation ,
F a
- s
"
- Eighteen-month surveillance test due.in March 1982 delayed until March 31, 1982.
,5 o
CONTAINMENT SYSTEMS CONTAINMENT RECIRCULATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.4.2 Two independent containment recirculation systems shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTION:
With one containment recirculation system inoperable, restore the inoperable system to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.4.2 Each containment recirculation system shall be demonstrated OPERABLE:
- a. At least once per 92 days on a STAGGERED TEST BASIS by:
- 1. Verifying that the system can be started on operator action in the control room, and
- 2. Verifying that the system operates for at least 15 minutes.
- b. At least once per 13 months by verifying a system flow rate of at least 7,200 cfmcWP l
t l
f
- Eighteen-month surveillanc'e test due in March 1982 delayed until
' March 31, 1982.
DAVIS-BESSE, UNIT 1 3/4 6-24 l
b CONTAINMENT SYSTEMS
$CT10^) $f 5,l SURVEILLANCE REQUIREMENTS (Continued)
- 2. Verifying that the system satisfies the in-place testing acceptance criteria and uses the test procedures of
. Regulatory Positions C.5.a. C.S.c and C.S.d of Regula-tory Guide 1.52, Revision 1. July 1976, and the system' flow rate is 8,000 cfm +10%.
- 3. Verifying within 31 days after removal that a laboratory '
analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 1, July 1976, meets the laboratory testing criteria of Regulatory Position C.6.a of Regula-tory Guide 1.52, Revision 1. July 1976.*
- 4. Verifying a system flow rate of 8,000 cfm +10% during system operation when tested in accordance with ANSI H510-1975.
- c. Af ter every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verify-ing within 31 days after removal that a laboratory analysis of '
a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 1, July 1976, meets the laboratory testing criteria of Regula- ',
- ory Position C.6.a of Regulatory Guide 1.52, Revision 1, July 1976.*
- d. At least once per 18 months by.
- 1. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is < 6 inches Water Gauge while operating the system at a flow rate of 8,000 cfm + 10%.
- 2. Verifying that the system starts automatically on any containmentisolationtestsignal.t>/.
l
- 3. Verifying that tiel filter cooling bypass valves can be manually opened.7 %
- Representative samples of used activated carbon from the EYS shall pass the laboratory test given in Table 3 for an activated carbon bed depth of 2 inches (i.e., the two 2 inch filter beds in series shall be tested per Test 5.b in Table 2 at a relative humidity of 70% for a methyl iodide penetration of less than 1%). The pre- and post-loading sweep medium temperature shall be 80 C for Test 5.b of ,
l Table 2, Regulatory Guide 1.52, Revision 1 July 1976.
DAVIS-BESSE, UNIT 1 3/4 6-29
/
- Eighteen-month surveillance test due in March 1982 delayed until March 31, 1982. ..
T p-
PLANT SYSTEMS
, Secno a 4. 7 I. X SURVEILLANCE REQUIREMENTS (Continued)
- c. The Auxiliary Feed Pump Turbine Steam Generator Level Control System shall be demonstrated OPERABLE by performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 31 days, and a CHANNEL CALIBRATION a,t ~
least once per 18 months.
- d. The Auxiliary Feed Pump Turbine Speed Switch, Auxiliary Feed Pump Suction Pressure Interlocks, and Auxiliary Feed Pump Turbine Inlet Steam Pressure Interlocks shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days, and a CHANNEL CALIBRATION at least once per 18 months.ik.-
- Eighteen-month surveillance test for AF Pump Speed Switch due in March 1982 delayed until March 31, 1982.
DAVIS-BESSE, UNIT 1 3/4 7-5 J