Text
,
y/<w
.
..
FEB 0 91982
$
A
sp
'
t
'
Ent;;3 f}
Georgia Power Company -
l'/Jg
2
,
ATTN:
Mr. J. H. Miller, Jr.
/Sg
p ut.ygdf??rew,g 7
Executive Vice President
Q\\\\ ~ W2'..
'7
,
P. O. Box 4545
Atlanta, GA 30302
xp
.
-
j .. ,e
y
Gentlemen:
'
Subject: Report Nos. 50-321/82-03 and 50-366/82-03
This refers to the routine safety inspection conducted by Mr. W. P. Ang of this
office on January 28-29, 1982, of activities authorizec by NRC Operating Licerse
No. DPR-57 and License No. NPF-5 for the Hatch Nuclear Plant facility and to the.
t
discussion of our findings held with Mr. J. R. Jordan, Project Manager, at the .
I
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
l
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
,
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosure:
See Page 2
8203020358 820209
~
Ofy /
PDR ADOCK 05000321
0
g/
_ _ _ _ _ _ _ _ _ _ . _
_
. _ _ .
.
.
Georgia Power Company
2
Enclos re:
Inspection Report Nos. 50-321/82-03
and 50-366/82-03
cc w/ encl:
'
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ encl:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Management Branch
State of Georgia
RII
RII
RII 6
L/
Ryp
RII
3io
0
-
e. . o -
hCEMurphy
WPAng:ht
ARHerdt
JR ge
FJ ng
2/9 /82
2/g/82
2/g /82
2/ /82