ML20041C539
| ML20041C539 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/04/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20041C540 | List: |
| References | |
| NUDOCS 8203020220 | |
| Download: ML20041C539 (2) | |
See also: IR 05000321/1981031
Text
_ _ _ _ _ _ _ _ _ .
_ _ _ _ _ _ _ _ _ _ _
-
.
.
- Ag {
YELLOW
,
,
'
FEB 0 4 FJ82
c
N,
Georgia Power Company
'$
p
ATTN: Mr. J. H. Miller, Jr.
'/
,
Executive Vice President
Ti E c g g ;; 3
9
s
P. O. Box 4545
P
-
.El
19825
-
At1anta, GA 30302
2.
Gentlemen:
- - "925ls?"" dPR *"z
f
fg
'
Subject: ReportNos.h321/853)and50-366/81-33
N hp'j
>
This refers to the special safety inspection conducted by fir. P. A. Taylor of
this office on December 7-11, 1981, of activities authorized by NRC Operating
License Nos. DPR-57 and NPF-5 for the Hatch facility and to the discussion of
our findings held with Mr. M. Manry, Plant ??anager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
l
4/
,
l
F. J. Long, Acting Chief
Projects Branch No. 2
'
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Mos. 50-321/81-33
and 50-366/81-33
cc w/ encl:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
s203020220 820204
PDR ADOCK 05000321
IhO [ 5
0
s
.
FEB 0 41962
-
.
Georgia Power Company
2
11. fianry, Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ encl:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Management Branch
State of Georgia
OIE:DEP
R,Il
RII
RI
RII
e ///f
VtM
3-5-62
PTaylor:dt
en ns
J ogge
JStohr
pl
T/ / /82
q/f./82
/g/82
3/ /82
l
.-