ML20041B753
| ML20041B753 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/11/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20041B754 | List: |
| References | |
| NUDOCS 8202250163 | |
| Download: ML20041B753 (2) | |
See also: IR 05000373/1981052
Text
.o
.
FE811592
,,
i
\\ lV <
y y\\
Q,a
w
O
N,
Docket No. 50-373
V,
m
Docket No. 50-374
g
h.~
(
Commonwealth Edison Company
-
N
-
>
-
,
' Jg
-
,
,
ATTN:
Mr. Cordell Reed
r)
~ ' E.
,
Vice President
e
/
Post Office Box 767
g
-
Chicago, IL 60690
/ 6 ~
m; -
Gentleman:
This refers t3 .he routine safety inspection conducted by Messrs. R. N. Sutphin,
M. M. Holzmer, and J. M. Peschel of this office on December 9, 10, 14, 23, 29,
30, 1981 and January 7, 1982, for Mr. R. N. Sutphin; January 7, 1982, for
Mr. J. M. Peschel, and January 7,11 and 15 for Mr. M. M. Holzmer of activities
at LaSalle County Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-99 and No. CPPR-100 and to the discussion of our findings with Messrs.
B. Stephenson, R. Cosaro, and R. Bishop at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and inter-
views with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix.
The inspection showed that action had been taken to correct the identified
noncomplience and to prevent recurrence, and our understanding of the cor-
rective action is described in Section 2 of the report.
Consequently, no
reply to this noncompliance is required and we have no further questions
regarding this matter at this time.
If you do not agree with our des-
cription of your corrective actim please inform us in writing.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report wil? be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of this
letter a written application to this office to withhold such information.
If
your receipt of this letter has been delayed such that less than seven (7) days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with Section 2.790(b)(1), any such
8202250163 820211
[
PDR ADOCK 05000373
hf
G
-
-_____ _ _ - ____ - -- - _ _- __ ____________.
.
i
1-
Commonwealth Edi.:on Company
-2-
1
1
application must be accompanied by an affidavit executed by the owner of the
'
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the con-
,
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
I
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, a copy of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
-
. .
, ,
,
.
,
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-373/81-52 and
No. 50-374/81-22
cc w/eacls:
Louis 0. DelGeorge, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Ilolyoak, Station
Superintendeat
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray,
n ice of
Assistant Attorney General
RIII
-
RIII
RIII
RIIf/
RIII
new
J
a\\s
/
l<rvp[tthike
W
_- - _ - - - - -
--