ML20041B175
| ML20041B175 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 02/10/1982 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20041B176 | List: |
| References | |
| NUDOCS 8202230355 | |
| Download: ML20041B175 (2) | |
See also: IR 05000508/1981021
Text
.
-.
g;
,~,y
,3
y
,
y),,
y.
y
w
u,
s
w
y
i
+
.
,
FEB 101982
"
Docket Nos. 50-508, 50-509
oa
9
RECE:VED
'9
g.
-
FEB 2 21982a- r
'
Washington Public Power Supply System
-
II
P. O. Box 1223
~
u mm sw % '
Elma, Washington 98541
v
tcum nuamu
tzc
7,
Attention: Mr. R. S. Leddick
4
Program Director, WNP-3/5
m
/
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5 (WNP-3/5)
This refers to the inspection conducted by Mr. W. G. Albert of this office
on December 1-31, 1981 of activities authorized by NRC Construction Permit
Nos. CPPR-154 and CPPR-155, and to the discussion of our findings held by
Mr. Albert with Mr. Leddick and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placeo' in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application te withhold information contained therein within thirty days
of the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
8202230355 820210
PDRADOCK05000g
G
$\\
%
(
omer >
RV
"'
' " " ' ' ' "
"* " " -
" "- " ""
I. . . . .".D"
D S "
"TA'L'..ENsEisf. . , .. " .'., , ,
'"... .i.'55 No
" .. .......
su m ory
...........
...... .
.. .
, ,,,
'""
' ' " " ' " " " "
" " " " " " " " '
..
... .....q /82
2/
2/
omy
2/ /82
...........}..../82
... .. ....
. .. . .. ......
. .. ..... ... ... .
........
. .
.. . ,
, ,
........ ... ....
NRC FORM 318110140l NRCM O240
OFFICIAL RECORD COPY
f " " " -32"24
__
_ _ _ _ _ _ _ _ - - _ . _ - ___ __ ___ _ _
.
.
_
-
.. ._ _.
__ _ _
,
.
.
,
cWashington Public Power Supply; System'
-2-
FEB '101932
-
.
'
,
,
.
-
,
>Should;you' have- any questions concerning this. inspection,-we will be glad
to' discuss them with you.;
s
^
'
'
Sincerely,
_
-
_
g
B.-H. Faulkenberry, Chief
. _
_
Reactor'. Construction Projects Branch;
Enclosure
!-
Inspection Report Nos.
50-508/81-21
50-509/81-22=
-
,
-
.
,
cc'w/o enclosure:.
-
R. B.,Glasscock, Quality. Assurance Director
~,
.D. E.-Dobson, Project Manager
_
1
-t
_
-.
.
~
bcc: DMB/ Document-Control Desk (RIDS)
~ Distributed by RV:
'
~
c.
'
State of WA (Lewis)
RHE' (w/o enc) -
-
Resident Inspector
<
,
. ,
b
9
4
L
4
F
r
/
$
t
,
1
,
,