Forwards IE Insp Repts 50-369/82-02 & 50-370/82-02 on 820105-08.No Noncompliance Noted
ML20041A864
Person / Time
Site: McGuire, Mcguire  
Issue date: 02/01/1982
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20041A865 List:
References
NUDOCS 8202220602
Download: ML20041A864 (2)


See also: IR 05000369/1982002

Text

e//ca)

.

.

.

.

.

FEB 011982

R iz

,x,

w

Duke Power Company

C'

' e c,

ATTN:

Mr. W. O. Parker, Jr.

j

-

3,s

~ [\\

Vice President, Steam Production

o/

^

t-

P. O. Box 2178

C/

~

(

-

'

Charlotte, NC 28242

N

"

'

-

' ,

i j

Gentlemen:

1

'

Subject: Report Nos h369/82-bd 50-370/82-02

'N

,/

'

This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr. ,

of this of fice on January 5-8, 1982, of activities authorized by NRC License

No. NPF-9 and Construction Permit No. CPPR-84 for the McGuire facility and to

the discussion of our findings held with Mr. G. W. Cage, Superintendent of

Operations, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with 10 CER 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure: See Page 2

820222g6020

?

$$O{,sl

r

O

9

e

e

FEB 011882

,

,

Duke Power Company

2

Enclosure:

Inspection Report Nos. 50-369/82-02

and 50-370/82-02

cc w/ enc 1:

M. D. McIntosh, P> ant Manager

J. T. Moore, Project Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of North Carolina

I

0

j

p$/ /82h

P m ,, gg

- > > e,mt

m ni.n

v C cMu,,,

1

/82

1

/82

1/ t/82

/82

3

-