Forwards IE Insp Rept 50-423/81-15 on 811201-31.No Noncompliance Noted
ML20041A249
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/03/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20041A250 List:
References
NUDOCS 8202190326
Download: ML20041A249 (2)


See also: IR 05000423/1981015

Text

c .t - /3 J A

j.

s

l

m03 M

Docket No. 50-423

p

Ev

N

Northeast Nuclear Energy Company

cy

ATTN: Mr. W. G. Counsil

C

"ECEIVED

?-

"

Senior Vice President

- Nuclear Engineering Operations Group

1~

~

,'

FEB 181982>

~

P. O. Box 270

-

-

{ isgygp G

3

Hartford, Connecticut 06101

TiCC

7

Gentlemen:

y

Subject:

Inspection 50-423/81-15

This refers to the routine safety inspection conducted by Mr. J. Mattia of

this office on December 1 - 31, 1981 at the Millstone Nuclear Power Station,

Unit 3, Waterford, Connecticut of activities authorized by NRC License No.

CPPR-ll3 and to the discussions of our findings held by Mr. Mattia with Mr.

Toth and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unle:s you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

original SignedMY

/

,/Wsg

j

4 chard W. Starostecki, Dir ctor

b) Division of Resident and P('rojection

Inspection

Enclosure: NRC Re ion I Inspection Report No. 50-423/81-15

R:

R: RI

.LhD

Elsasse'6

RI:D

r

Bru ner

Mattia:h

T }l OFFICIAL RECORD COPY

$ 1[g

2/3/82

.9/9/fr&

y<

J

,

8202190326 820203

{DRADOCK 05000423

PDR

]

. ._

_

_

_

.

-.

. -

Northeast Nuclear Energy Company

2

FEB 0 3 gggt

cc w/ enc 1:

K. W. Gray, Construction Quality Assurance Lead

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. G. Diedrick, Manager of Quality Assurance

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

NRC Resident Inspector

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encl)

!

,

5

i

.

Y

, y

w

t-i

rr*

- . ,-

+

,-

---

---,

..rm,

,#

-- - - --