Text
c .t - /3 J A
j.
s
l
m03 M
Docket No. 50-423
p
Ev
N
Northeast Nuclear Energy Company
cy
ATTN: Mr. W. G. Counsil
C
"ECEIVED
?-
"
Senior Vice President
- Nuclear Engineering Operations Group
1~
~
,'
FEB 181982>
~
P. O. Box 270
-
-
{ isgygp G
3
Hartford, Connecticut 06101
TiCC
7
Gentlemen:
y
Subject:
Inspection 50-423/81-15
This refers to the routine safety inspection conducted by Mr. J. Mattia of
this office on December 1 - 31, 1981 at the Millstone Nuclear Power Station,
Unit 3, Waterford, Connecticut of activities authorized by NRC License No.
CPPR-ll3 and to the discussions of our findings held by Mr. Mattia with Mr.
Toth and others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unle:s you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1).
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
original SignedMY
/
,/Wsg
j
4 chard W. Starostecki, Dir ctor
b) Division of Resident and P('rojection
Inspection
Enclosure: NRC Re ion I Inspection Report No. 50-423/81-15
R:
R: RI
.LhD
Elsasse'6
RI:D
r
Bru ner
Mattia:h
T }l OFFICIAL RECORD COPY
$ 1[g
2/3/82
.9/9/fr&
y<
J
,
8202190326 820203
{DRADOCK 05000423
]
. ._
_
_
_
.
-.
. -
Northeast Nuclear Energy Company
2
FEB 0 3 gggt
cc w/ enc 1:
K. W. Gray, Construction Quality Assurance Lead
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat, Manager, Generation Facilities Licensing
D. G. Diedrick, Manager of Quality Assurance
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Connecticut
NRC Resident Inspector
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encl)
!
,
5