Forwards Draft Technical Evaluation Rept of SEP Topic VI-7.A.3,ECCS Actuation Sys.Topic Assessment May Be Revised If Facility Design Changes or NRC Criteria Modified Before Integrated Assessment Completed
ML20040H460
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/11/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20040H461 List:
References
TASK-06-07.A3, TASK-6-7.A3, TASK-RR LSO5-82-02-054, LSO5-82-2-54, NUDOCS 8202180277
Download: ML20040H460 (2)


Text

r-i M.

'a February 11, 1982 (7[4..

\\

co 00ccket No. 50-213 N

1 LS05-82-02-054 p

m t.;;

Ct:g10 Ja T-n 7

r % ffu g 2 r T

\\

spQj%,y

-Mr. W. G. Counsil. Vice President A

a Nuclear Engineering and Operations

't A Connecticut Yankee Atomic Power Company

/ 'w':y, '

Post Office Box 270 Hartford, Connecticut 06101

Dear Mr. Counsil:

SUBJECT:

SEP TOPIC VI-7.A.3, ECCS ACTUATION SYSTEM, DRAFT SAFETY EVALUATION REPORT FOR HADDAM NECK is a copy of our contractor's draft technical evaluation report on the subject topic. is the staff's draft safety evaluation of this topic based on Enclosure 1.

i The staff has concluded that your plant satisfies our requirements. This topic assessment may be revised in the future if your facility design is changed or if NRC criteria relating to this topic are modified before the integrated assessment is completed.

Sincerely,

$ #Y 6

Dennis M. Crutchfield, Chief

/

Operating Reactors Branch No. 5

//l Division of Licensing 9 us6 g

Enclosures:

As stated ADDI Y61 cc w/ enclosures:

c, S See next page 5.32own 8202180277 820211 PDR ADOCK 05000213 P

pop ju &

/1 L

SEPB:DL/.,

q. O.R

$.......Ad:S SEPB:DL ORB #5:Pfi DL orrice>

g, suRuame)

.l.*.dk......RHe m nn...mssall....... 0.T.t9.p.M.. D.R

...f..i.9.1..d...G,L,,,,,,, s,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

1B2............... 2l 21B2..... 21..].l.Q2....... 21.LO!.62...... 2ll.h./B2........

. 2Q./.B2........

omy NRC FORM 318 (10 80) NRCM Ono OFFIClAL RECORD COPY uso m m i-a

~

g Mr. W. G. Counsil cc Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 Superintendent' Haddam Neck Plant RFD #1 Post Office Box 127E East Hampton, Connecticut 06424 Mr. Richard R. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut i

0Ffice of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06115 1

l V. S. Environmental Protection Agency i

Region I Office ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station c/o U. S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Ronald C. Haynes, Regional Administrator Nuclear Regulatory Commission, Region I Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 h

.