Text
,
S
f
,
.
Y
.
JAN 2 61%1
Docket No. 50-361
,N
[ i,e
%,
Southern California Edison Company
P. O. Box 800
o
%
2244 Walnut Grove Avenue
agg',EU
C
Rosemead, California 91770
-
FEg I 7 79
5'j":m maw.gh, ,gl
Attention: Dr. L. T. Papay, Vice President
-
m_
-
Advanced Engineering
2
$1*i~' / /
?
26
///
Gentlemen:
<
Subject:
NRC Inspection of San Onofre Unit No. 2
This refers to the routine inspections conducted by Messrs. A. Chaffee,
D. Kirsch, G. Johnston, and P. Stewart of this office, during the period
of October 13 through December 4,1981, of activities authorized by
NRC Construction Pennit No. CPPR-97, and to the discussions of our
findings held with Mr. H. B. Ray and other members of the Southern
California Edison staff on October 30, November 20 and December 4,1981.
Areas examined during these inspections are described in the enclosed
inspection report. Within these areas, the inspections consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and sul' nit written
application to withhold information contained therein within thirty days
of the date of this letter. Such application must be consistent with the
requirements of 2.790(b)(1).
Should you have any questions concerning these inspections, we will be glad
to discuss them with you.
Sincerely,
D. m. s&embog Ckid
D. M. Sternberg, Chief
Reactor Operations Projects Branch
8202180212 820128
gDRADOCK05000
/
/
RVQk /hg ,,,MM,,,,,,,, ,, ,Mi ,,,
,
, k ,,, , ,
,1,,,,,, } jy,, , ,,,,,f[g,,,,,
omer >
cu:Naur>bAFFEE
KIRSCH
HNSTON
EWART
ZW ZIG
ElG
,
l
,,,9 "Ysi7bs" lvir/ar "" ~ E7M"" " "17 5 /82" - varaz"
" ~tsysz -
- - ~ ~
- - -
t9TC FORM 318 810<80l NRCM O240 .
OFFICIAL RECORD COPY
"' "- 2"2' j
'
'
p-
y
'-
.,
.
'
-
.
s.
_. ,
-
s
2-
JAN z ti 198?.
Southern' California Edison Company.
- -
'
.
-
-
Enclosure:
.IE: Inspection Report
~
.
No. 50-361/81-28
cc w/o enclosure: '
'
R. Dietch, SCE
H. B. Ray,-.SCE (San Clemente)
'
y
r
bec:
DMB/ Document Control Desk-(RIDS)
Distributed by RV:
'
State of CA (Hahn/ Johnson)
Engelken -
,.
Resident Inspector (L. Miller)
Principal ' Inspector (D. Kirsch)
.