Forwards IE Insp Rept 50-361/81-28 on 811013-1204.No Noncompliance Noted
ML20040H402
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/28/1982
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20040H403 List:
References
NUDOCS 8202180212
Download: ML20040H402 (2)


See also: IR 05000361/1981028

Text

,

S

f

,

.

Y

.

JAN 2 61%1

Docket No. 50-361

,N

[ i,e

%,

Southern California Edison Company

P. O. Box 800

o

%

2244 Walnut Grove Avenue

agg',EU

C

Rosemead, California 91770

-

FEg I 7 79

5'j":m maw.gh, ,gl

Attention: Dr. L. T. Papay, Vice President

-

m_

-

Advanced Engineering

2

$1*i~' / /

?

26

///

Gentlemen:

<

Subject:

NRC Inspection of San Onofre Unit No. 2

This refers to the routine inspections conducted by Messrs. A. Chaffee,

D. Kirsch, G. Johnston, and P. Stewart of this office, during the period

of October 13 through December 4,1981, of activities authorized by

NRC Construction Pennit No. CPPR-97, and to the discussions of our

findings held with Mr. H. B. Ray and other members of the Southern

California Edison staff on October 30, November 20 and December 4,1981.

Areas examined during these inspections are described in the enclosed

inspection report. Within these areas, the inspections consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and sul' nit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

Should you have any questions concerning these inspections, we will be glad

to discuss them with you.

Sincerely,

D. m. s&embog Ckid

D. M. Sternberg, Chief

Reactor Operations Projects Branch

8202180212 820128

gDRADOCK05000

/

/

RVQk /hg ,,,MM,,,,,,,, ,, ,Mi ,,,

,

, k ,,, , ,

,1,,,,,, } jy,, , ,,,,,f[g,,,,,

omer >

cu:Naur>bAFFEE

KIRSCH

HNSTON

EWART

ZW ZIG

STE

ElG

,

l

,,,9 "Ysi7bs" lvir/ar "" ~ E7M"" " "17 5 /82" - varaz"

" ~tsysz -

- - ~ ~

- - -

t9TC FORM 318 810<80l NRCM O240 .

OFFICIAL RECORD COPY

"' "- 2"2' j

'

'

p-

y

'-

.,

.

'

-

.

s.

_. ,

-

s

2-

JAN z ti 198?.

Southern' California Edison Company.

- -

'

.

-

-

Enclosure:

.IE: Inspection Report

~

.

No. 50-361/81-28

cc w/o enclosure: '

'

R. Dietch, SCE

H. B. Ray,-.SCE (San Clemente)

'

y

r

bec:

DMB/ Document Control Desk-(RIDS)

Distributed by RV:

'

State of CA (Hahn/ Johnson)

Engelken -

,.

Resident Inspector (L. Miller)

Principal ' Inspector (D. Kirsch)

.

F

4

e

p.

e

I

,

a

u

.

- _- _ . - _ _