REACTOR COOLANT SYSTEM 3/4.4.3 SAFETY AND RELIEF VALVES - OPERATING RELIEF VALVES LIMITING CONDITION FOR OPERATION 3.4.3.2 Two power operated relief valves (PORVs) and their associated block valves shall be OPERABLE.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
a.
With one or more PORV(s) inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERABLE status or close the associated block valve (s) and remove power from block valve (s); otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one or more block valve (s) inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the block valve (s) to OPERABLE status or close the block valve (s) and remove power from the block valve (s), or close the PORV(s) and remove control power from the PORV(s); otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
The provisions of 3.0.4 are not applicable.
SURVEILLANCE PEQUIREMENTS 4.4.3.2.1 Each PORV shall be demonstrated OPERABLE at least once per 18 months by performance of a CHANNEL CALIBRATION and operating the valve through one cycle of full travel.
4.4.3.2.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.
TROJAN-UNIT 1 3/4 4-4a 8202170251 EM20210 PDR ADOCK 05000344 fP Pid
TABLE 4.3-7
- =
ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS 5:
CHANNEL 5
CHANNEL CHANNEL FUNCTIONAL
((
INSTRUMENT CHECK /
CALIBRATION TEST
- 1., Reactor Coolant System Subcooling M
R t
Margin Monitor
~
2.
PORY Position Indicator M**
R 3.
PORY Block Valve Position Indicator M**
R 4.
Safety Valve Position Indicator M
R (Acoustical Flow) 5.
Auxiliary Feedwater Flowrate M*
R 6.
Pressurizer Water Level M
R
- Not applicable in Modes 1 and 2.
- Scope of the channel check is to observe applicable lighting of the valve position indicator for the current valve position.
l l
{
i