ML20040G982

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Insufficient post-weld Heat Treatment on RP Embed Plates,Initially Reported on 810827. Ae Final Rept Submitted on 820120 for Review.Final Rept Will Be Submitted by 820312
ML20040G982
Person / Time
Site: Satsop
Issue date: 01/28/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20040G978 List:
References
10CFR-050.55E, 10CFR-50.55E, GO3-82-094, GO3-82-94, NUDOCS 8202160695
Download: ML20040G982 (1)


Text

Tills i.f.T TE R St,T1;FIES cO.C.it Tr.1EtJT tio.

    • E g"N A(OtSTTim) TIM- -

Tatts L.CTTEn (DOES) (ODES r:OTl ESTABLISH A f4Er.*CO'.1MIT.".1 C6MMITMENT CONTROL tvPPSS CORRE5PONDEtJCE NO.

ROUTING SITE FILES -

WG ALBERT /NRC DR C00DY DE D0BSON JJ DORAN RB GLASSC0CK/280 ROU Docket Numbers 50-508 and 50-509 CE LOVE I DD O'SULLIVAN/280 RG PECK

[ January 28, 1982 DL QUAMME t G03-82-094 JP SLUKA GC SORENSEN/440 x OE TRAPP -

S -

JE WERLE U. S. Nuclear Regulatory Commission, Region V ,

  • g; Office of Inspection and Enforcement .

3 1450 Maria Lane, Suite 260 m .)

Walnut Creek, California 94596-5368 e .

c Attention: Mr. B. H. Faulkenberry Chief, Reactor Construction a h

ts kanc 2

g

.1 .

2 8

\

Subject:

PROJECT NOS. 3 AND 5 \j k) g g

[

FINAL REPORT OF POT . L 10 R . ) G c RP EMBED PLATES - NE N DEF I E (D/N #025) g( g

Reference:

Letter, G03-81-242 t i gust 27,1981, R. S.

Leddick to B. H. Fau .e ' c r , Inte_ rim Report of .

y e subject.

Potential 10CFR50.55(

b b

. The refer ce etter provided your office with an interim report of  %

a potentia 1 0.55(e) concerning the subject condition. The're-

' port noted t. at - di ional evaluation was required to determine the p, p q 'wC e cts of no p r. ing post weld heat treatment. , -

\ n The ir hitect/End neer's final report was submitted to the Supply Sys-tem ,

a y 20,1982 for review. The Supply System has reviewed g%

he re or owever, it has been determined that further analysis and 'G

/ c ri fi tion is required prior to forwarding to your office. As a - M e it, the final report will be provided by March 12,1982. h 5

/ $

Should you have any questions or desire further information, please .

contact, e directly.

u 4 C

f a '

, R. S. Le 1000 S S Program Director, WNP-3/5 jCu js 3C lg yE DRC/tt Attachment '

sob c E I cc: J. Adams - NESCO E ti E D. Smithpeter - BPA I Ebasco - New York WNP-3/5 Files - Richland 820216.T.S 820208 PDR ADO' T 05000508 0 PDR _