Interim Deficiency Rept Re Insufficient post-weld Heat Treatment on RP Embed Plates,Initially Reported on 810827. Ae Final Rept Submitted on 820120 for Review.Final Rept Will Be Submitted by 820312
ML20040G982
Person / Time
Site: Satsop
Issue date: 01/28/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20040G978 List:
References
10CFR-050.55E, 10CFR-50.55E, GO3-82-094, GO3-82-94, NUDOCS 8202160695
Download: ML20040G982 (1)


Text

Tills i.f.T TE R St,T1;FIES cO.C.it Tr.1EtJT tio.

g"N A(OtSTTim) TIM-Tatts L.CTTEn (DOES) (ODES r:OTl ESTABLISH A f4Er.*CO'.1MIT.".1 **E C6MMITMENT CONTROL tvPPSS CORRE5PONDEtJCE NO.

ROUTING SITE FILES WG ALBERT /NRC DR C00DY DE D0BSON JJ DORAN RB GLASSC0CK/280 Docket Numbers 50-508 and 50-509 ROU CE LOVE I

DD O'SULLIVAN/280 RG PECK

[ January 28, 1982 DL QUAMME t G03-82-094 JP SLUKA GC SORENSEN/440 x

OE TRAPP S

JE WERLE U. S. Nuclear Regulatory Commission, Region V

  • g; Office of Inspection and Enforcement 3

1450 Maria Lane, Suite 260

.)

m Walnut Creek, California 94596-5368 e

Attention:

Mr. B. H. Faulkenberry h

2.1 c

ts kanc g

Chief, Reactor Construction a

2 k)

\\

8

Subject:

PROJECT NOS. 3 AND 5

\\j g

g

[

FINAL REPORT OF POT L 10 R

)

G c

RP EMBED PLATES - NE N DEF I

E (D/N #025) g (

g

Reference:

Letter, G03-81-242 t

i gust 27,1981, R. S.

Leddick to B. H. Fau.e ' c r, Inte_ rim Report of Potential 10CFR50.55(

y e subject.

b b

The refer ce etter provided your office with an interim report of a potentia 1

0.55(e) concerning the subject condition.

The're-p p,

' port noted t. at - di ional evaluation was required to determine the q 'w e

cts of no p

r. ing post weld heat treatment.,

C

\\

n The ir hitect/End neer's final report was submitted to the Supply Sys-g tem a y 20,1982 for review.

The Supply System has reviewed he re or owever, it has been determined that further analysis and

'G

/

c ri fi tion is required prior to forwarding to your office.

As a -

M e it, the final report will be provided by March 12,1982.

h 5

/

Should you have any questions or desire further information, please contact, e directly.

4 u

C f

a R. S. Le 1000 S

S js Program Director, WNP-3/5 jC u

3 C DRC/tt lg yE Attachment sob c

E I

cc:

J. Adams - NESCO E ti E

D. Smithpeter - BPA I

Ebasco - New York WNP-3/5 Files - Richland 820216.T.S 820208 PDR ADO' T 05000508 0