ML20040G977
| ML20040G977 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 02/08/1982 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML20040G978 | List: |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GO3-82-125, NUDOCS 8202160691 | |
| Download: ML20040G977 (1) | |
Text
..
3; Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 y
//
RECEVED February 8,1982 E
FEBI 219826 C G03-82-125
- -== p=
$j ms
/
Document Control Desk U. S. Nuclear Regulatory Commission y
Washington D. C.
20555 an
Subject:
PROJECT NOS. 3 AND 5 INTERIM REPORT OF POTENTIAL 10CFR50.55(e)
RP EMBED PLATES - WELDING DEFICIENCIES (D/N'#025)
Attached is a copy of the interim report provided to Region V concern-ing a potential 10CFR50.55(e) associated with the subject condition.
Should you have any questions or desire further information, please contact me directly.
R. S. Leddick/1000 Program Diractor, WNP-3/5 DRC/tt j
Attachment l
cc:
J. Adams - NESCO-WO/A l
D. Smithpeter - BPA-WO/A Ebasco - New York-WO/A WNP-3/5 Files - Richland-WO/A
[$lI 6'
8202160691 020208 PDR ADOCK 05000508 C
-