ML20040G960
| ML20040G960 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/28/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20040G961 | List: |
| References | |
| NUDOCS 8202160667 | |
| Download: ML20040G960 (2) | |
See also: IR 05000245/1981016
Text
-
~
.
.
-
.
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
'd
g1
Senior Vice President - Nuclear
4'
s
Engineering and Operations Group
\\
P. O. Box 270
>
'
Hartford, Connecticut 06101
v tJ
.
J
,,
Gentlemen:
g
/
Subject:
Inspection Nos. 50-245/81-16
'
50-336/81-15
/';-
/
'O
/
This refers to the routine safety inspection conducted by Mr. J. T. Shediosky
and Mr. D. R. Lipinski of this office on November 1, 1981 to January 2,
1982 at the Millstone Nuclear Power Station, Waterford, Connecticut of
activities authorized by NRC License Nos. DPR-21 and DPR-65 and to the
discussions of our findings held by Mr. J. T. Shedlosky with Mr. Mroczka
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are describ?d in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of
prc.edures and representative records, interviews with personnel, measurements
made by the inspector, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance have been categorized into the levels described
in the Federal Register Notice (45 FR 66754) dated October 7, 1980. You
are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding;
.
and (b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section
nm
2.790(b)(1), any such application must be accompanied by an affidavit
mea
executed by the owner of the information which identifies the document or
@
part sought to be withheld, and which contains a full statement of the
08
reasons on the basis which it is claimed that the information should be
En
withheld from public disclosure. This section further requires the statement
s
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
5
e[
9
$@
RI:DRPI
' R1DRPfp'RI
,
'
g<
Shedlosk
mg Elsasser Brunnpr
'gg
1/25/82
//nl/ft
l/+
1EOI
mao
E
OFFICIAL RECORD COPY
- /
-nff
.
'
.
.
Northeast Nuclear Energy Company
2
JAN 2 8152
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you
in this regard within the specified periods noted above, the report will be
placed in the Public Document Room. The telephone notification of your
intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signea 9F8
f)
.
%
Michard W. Starostecki, DTrector,
Division of Resident and Project
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Numbers 50-245/81-16 and 50-336/81-15
cc w/encis:
J. F. Opeka,' Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
0FFICIAL RECORD COPY
__,