Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

'd

g1

Senior Vice President - Nuclear

4'

s

Engineering and Operations Group

\\

P. O. Box 270

>

'

Hartford, Connecticut 06101

v tJ

.

J

,,

Gentlemen:

g

/

Subject:

Inspection Nos. 50-245/81-16

'

50-336/81-15

/';-

/

'O

/

This refers to the routine safety inspection conducted by Mr. J. T. Shediosky

and Mr. D. R. Lipinski of this office on November 1, 1981 to January 2,

1982 at the Millstone Nuclear Power Station, Waterford, Connecticut of

activities authorized by NRC License Nos. DPR-21 and DPR-65 and to the

discussions of our findings held by Mr. J. T. Shedlosky with Mr. Mroczka

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are describ?d in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

prc.edures and representative records, interviews with personnel, measurements

made by the inspector, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels described

in the Federal Register Notice (45 FR 66754) dated October 7, 1980. You

are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

.

and (b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

nm

2.790(b)(1), any such application must be accompanied by an affidavit

mea

executed by the owner of the information which identifies the document or

@

part sought to be withheld, and which contains a full statement of the

08

reasons on the basis which it is claimed that the information should be

En

withheld from public disclosure. This section further requires the statement

s

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

5

e[

9

$@

RI:DRPI

' R1DRPfp'RI

,

'

RPI

g<

Shedlosk

mg Elsasser Brunnpr

'gg

1/25/82

//nl/ft

l/+

1EOI

mao

E

OFFICIAL RECORD COPY

  1. /

-nff

.

'

.

.

Northeast Nuclear Energy Company

2

JAN 2 8152

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room. The telephone notification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signea 9F8

f)

.

%

Michard W. Starostecki, DTrector,

Division of Resident and Project

Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Numbers 50-245/81-16 and 50-336/81-15

cc w/encis:

J. F. Opeka,' Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

__,