1 i
APPEllDIX A fl0TICE OF VIOLATI0ft flortheast fluclear Energy Company Docket lio. 50-245 Hartford, Connecticut 06101 License fio. DPR-21 As a result of the inspection conducted on flovember 1,1981, through January 2, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violations were identified:
A.
Technical Specification 3.1 requires a minimum of two operable Main Turbine Fast Closure sensing channels in each of two trip systems in all modes of operation (bypassed when less than 45 percent turbine power).
In the absence of the required number of operable instrument channels in a single trip system, that system is to be tripped.
Contrary to the above, the reactor was operated at full power in the "run" mode with one of two Main Turbine Fast Closure sensing pressure switches in a trip system valved out and that trip system untripped from 0850 to 1850 on November 17, 1981.
ThisisaSeverityLevelIVViolation(SupplementI).
B.
Technical Specification 6.8.1 and Regulatory Guide 1.33 dated Hovember 3, 1972, require written procedures be established, implemented, and maintained for surveillance testing of reactor protective systems for boiling water reactors.
Station Procedure SP408G " Turbine Control Valve Fast Closure Functional Tert /
Calibration", Revision 2, requires that the isolation valve to pressure switch PS-39 be opened after testing and subsequently checked open.
Contrary to the above, at 0850 on !!ovember 17, 1981, while conducting sur-i veillance on the !!ain Turbine Control Valve Fast Closure RPS trip, pressure switch PS-39 was isolated and remained isolated after testing until 2020 on llovember 17, 1981.
This is a Severity Level V Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, llortheast Nuclear Energy Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) co.'rective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atonic Energy Act of 1954, as amended, this response shall be submitted under oath or affinnation. Where good cause is shown, consideration will be given to extending your response time, a
OFFCCE >
SUMAME) 8202160670 820128 PDR ADOCK 05000245 j
oATE )
G PDR NRC FOHM 318 (10-80) NBCM 024a O c' N5id 'ti 5~C6R D CO PY uwo mi-:ra
F APPEllDIX A The responses directed by this flotice are not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980. PL 96-511.
original signed Bft' b
~
Dated J3N 2 e inne
,[4o R. W. Starostecki, Directpr
}
Division of Resident and Project Inspection M
onice)
SURNAME) cara p NRC FORM 318 (1040) NRCM O240 OFFICIAL RECORD COPY uso m i
,_35.
-