ML20040F620
| ML20040F620 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 01/08/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Leonard J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20040F621 | List: |
| References | |
| NUDOCS 8202090419 | |
| Download: ML20040F620 (3) | |
See also: IR 05000333/1981022
Text
P
'
.,
^
,g
M06 Sg
is
Docket No. 50-333
Powe- Authority of the State of New York
y
g~ l^g
James A. FitzPatrick Nuclear Power Plant
'V
/
-
T
ATTN:
Mr. John D. Leonard
_
'
Resident Manager
.
,
0, u,) .v. j,Q
'g
P. O. Box 41
.
e s
.
Lycoming, New York 13093
-
-
,
Gentlemen:
q wy
\\
Subject:
Inspection Nos. 50-333/81-22, 50-333/81-28 and
, _
50-333/81-29
N >I
.
This refers to three inspections of shipments of radioactive waste from
the James A. FitzPatrick Nuclear Power Plant. The first was conducted
on May 27-28, 1981 near Wasta, Soutn Dakota by a member of our Region IV
office. A second inspection was conducted on September 24, 1981 at
Barnwell, South Carolina by a representative of the State of South
Carolina. The third was conducted on November 18, 1981 at Richland,
Washington by a representative of the State of Washington.
Areas examined during these inspections are described in reports attached
to the Office of Inspection and Enforcement Inspection Reports 50-
333/81-22, 50-333/81-28 and 50-333/81-29, which are enclosed with this
letter.
The inspections consisted variously of reviews of shipping
papers, placarding, marking and labeling, radiation measurements, selective
contamination surveys, and examinations of the packages and the tractor-
trailers.
Based on the results of these inspections, it appears that certain of
your activities were not conducted in full compliance with NRC requirements
as set forth in the Notice of Violation enclosed herewith as Appendix A.
The violations in Appendix A have been categorized at the severity level
described in accordance with the Interim Enforcement Policy as published
in the Federal Register (45 FR 66754) dated October 7,1980.
You are
required to re; pond to this letter, and in preparing your response you
should follow tne instructions specified in Appendix A.
Two of the violations listed in Appendix A have alread been the subject
of enforcement action.
In connection with item A2, on November 23, 1981
the State of Wa.;hington suspended your authorization to use the Richland,
Washington commercial low-level waste burial site.
In connection with
item B, on September 28, 1981, the State of South Carolina assessed a
civil penalty of
,000.
In both cases, you were
quired
T./:DGTI
. T
R :DETI
- DETI
I
R
J Knap
y er
C
son
mon
'
&
1/6/82
/ (; $h
I
fV
g
I
ICIAL RECO D' COPY
r202090419 8201os
TE/O
f"DRADOCK 05000333
3
'
'/
I
/,
,
Power Authority of New York
2
to submit evidence that adequate measures had been implemented to assure
compliance with all applicable provisions of Federal and State law.
In view of the circumstances surrounding this matter, we have exercised
our discretion under the Interim Enforcement Policy and have chosen to
issue at this time the enclosed Notice of Violation.
After reviewing
your response to this Notice of Violation and your proposed corrective
actions, the NRC will determine whether further NRC enforcement action
is necessary in order to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this
office, by telephone, within ten days of the date of this letter and
submit written application to withhold information contained therein
within thirty days of the date of this letter.
Such application must be
consistent with the requirements of 2.790(b)(1).
The responses directed by this letter and the accompanying Notice are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
wt 012cd 573
.
Thomas T. Martin, Director,
Division of Engineering and
Technical Inspection
i
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection Reports
50-333/81-22, 50-333/81-28 and 50-333/81-29
cc w/encls:
George T. Berry, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Vice President - Quality Assurance
M. C. Cosgrove, Quality Assurance Superintendent
J. F. Davis, Chairman, Safety Review Committee
C. M. Pratt, Assistant General Counsel
State of New York
NRC Resident Inspector
South Carolina Department of Health and Environmental Control
State of Washington Department of Social and Health Servfces
Director, Region 1 Motor Carrier Safety Office, USDOT
Director, Region 8 Motor Carrier Safety Office, USDOT
OFFICIAL RECORD COPY
I
s
~
Power Authority of New York
3
bec w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)
Director, Division of Resident and Project Inspection
Regional Administrator, Region IV
l
.
OFFICIAL RECORD COPY