Forwards IE Insp Rept 50-416/81-51 on 811109-12 & Notice of Violation
ML20040E668
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/30/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20040E620 List:
References
NUDOCS 8202050225
Download: ML20040E668 (3)


See also: IR 05000416/1981051

Text

.f

,.

.

.

NOV 3 0 1981

(OM

Mississippi Power and Light Company

ATTN: Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject: Report No. 50-416/81-51

This refers to the routine safety inspection conducted by Mr. A. H. Johnson of

this office on November 9-12, 1981, of activities authorized by NRC Construction

Permit No. CPPR-118 for the Grand Gulf facility. Our preliminary findings were

discussed with Mr. C. R. Hutchinson, Startup Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information containad therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M/

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

cc w/ enc 1:

(See Page 2)

8202050225 820120

PDR ADOCK 05000416

Q

PDR

..

.

.

_.

_.

.i

. ' .

. ' .

.

i

APPENDIX A

NOTICE OF VIOLATION

'

Mississippi Power and Light Company

Docket No. 50-416

,

Grand Gulf 1

License No. CPPR-118

As a result of the inspection conducted on November 9-12, 1981, and in accordance

with the Interim Enforcement Policy, 45 FR 65754 (October 7,1980), the following

'

violation was identified.

10 CFR 50, Appendix B, Criterion V and the implementing section of the

Operational Quality Assurance Manual, MP&L-Topical-1, paragraph 5 . 4 .- 1

require activities affecting quality be performed in accordance with

documented instructions, procedures or drawings. Grand Gulf Startup Manual,

Section SUM 5000, paragraph 4.4.3 states that Bechtel CTO and Construction

personnel are only permitted to perform testing or work functions on systems

turned over to MP&L under the authority of a Construction Work Permit (CWP).

Contrary to the above, during the period of June 22 and September 19, 1981,

local leak rate testing was performed by Bechtel CTO personnel, without the

authority of a CWP, on systems that had been turned over to MP&L. Examples

>

!

of systems turned over to MP&L included RHR, RWCU, Component Cooling, Plant

Chilled Water, RCIC, Demineralized Water, Fuel Pool Cooling and Standby

Service Water Systems. The special test procedure, Containment Local Leak

,

Rate (LLRT) Testing,1-M61-ST-01, Revision 2, as written and implemented is

_

contrary to the Grand Gulf Startup Manual (a higher '4e- document) in that

i

step 6.9.1- of 1-M61-ST-01 test procedure allows testing on systems turned

over to MP&L without the authority of a CWP.

This is a Severity Level V Violation (Supplement II.E).

.

Pursuant to the provisions of 10 CFR'2.201, you are hereby required to submit to

this office within thirty days of the date of this Notice, a written statement or

j

explanation in reply, including: (1) admission or denial of the alleged viola-

tion; (2) the reasons for the violation if admitted; (3) the corrective steps

4

which have been taken and the results achieved; (4) corrective steps which will

be taken to avoid further violations; and (5) the date when full compliance will

be achieved. Consideration may be given to extending your response time for good

cause shown.

Under the authority of Section- 182 of the Atomic Energy Act of

1

i

1954, as amended, this response shall be submitted under oath or affirmation.

1

jscs

.

,

i

NOV 3 0 tsoi

gjg /(w"#

m

Date:

i

i

<

.._ ,

..

.

,

.

-

_

s

,

,

  • . " .

.

.

-

NOV 3 0 1981

Mississippi Power and

2

Light Company

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-416/81-51

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

RII

RII

RII

RII

RII

R I

AJohnson:aw

FJape

PT

b

C

Jf

ki3f R

ewis

,fg,e1

y

n/ye1

1

e1

. /e1 gj mge1