.f
,.
- .
.
NOV 3 0 1981
(OM
Mississippi Power and Light Company
ATTN: Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject: Report No. 50-416/81-51
This refers to the routine safety inspection conducted by Mr. A. H. Johnson of
this office on November 9-12, 1981, of activities authorized by NRC Construction
Permit No. CPPR-118 for the Grand Gulf facility. Our preliminary findings were
discussed with Mr. C. R. Hutchinson, Startup Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information containad therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
cc w/ enc 1:
(See Page 2)
8202050225 820120
PDR ADOCK 05000416
Q
..
.
.
_.
_.
.i
. ' .
. ' .
.
i
APPENDIX A
'
Mississippi Power and Light Company
Docket No. 50-416
,
Grand Gulf 1
License No. CPPR-118
As a result of the inspection conducted on November 9-12, 1981, and in accordance
with the Interim Enforcement Policy, 45 FR 65754 (October 7,1980), the following
'
violation was identified.
10 CFR 50, Appendix B, Criterion V and the implementing section of the
Operational Quality Assurance Manual, MP&L-Topical-1, paragraph 5 . 4 .- 1
require activities affecting quality be performed in accordance with
documented instructions, procedures or drawings. Grand Gulf Startup Manual,
Section SUM 5000, paragraph 4.4.3 states that Bechtel CTO and Construction
personnel are only permitted to perform testing or work functions on systems
turned over to MP&L under the authority of a Construction Work Permit (CWP).
Contrary to the above, during the period of June 22 and September 19, 1981,
local leak rate testing was performed by Bechtel CTO personnel, without the
authority of a CWP, on systems that had been turned over to MP&L. Examples
>
!
of systems turned over to MP&L included RHR, RWCU, Component Cooling, Plant
Chilled Water, RCIC, Demineralized Water, Fuel Pool Cooling and Standby
Service Water Systems. The special test procedure, Containment Local Leak
,
Rate (LLRT) Testing,1-M61-ST-01, Revision 2, as written and implemented is
_
contrary to the Grand Gulf Startup Manual (a higher '4e- document) in that
i
step 6.9.1- of 1-M61-ST-01 test procedure allows testing on systems turned
over to MP&L without the authority of a CWP.
This is a Severity Level V Violation (Supplement II.E).
.
Pursuant to the provisions of 10 CFR'2.201, you are hereby required to submit to
this office within thirty days of the date of this Notice, a written statement or
j
explanation in reply, including: (1) admission or denial of the alleged viola-
tion; (2) the reasons for the violation if admitted; (3) the corrective steps
4
which have been taken and the results achieved; (4) corrective steps which will
be taken to avoid further violations; and (5) the date when full compliance will
be achieved. Consideration may be given to extending your response time for good
cause shown.
Under the authority of Section- 182 of the Atomic Energy Act of
1
i
1954, as amended, this response shall be submitted under oath or affirmation.
1
jscs
.
,
i
NOV 3 0 tsoi
gjg /(w"#
m
Date:
i
i
<
.._ ,
..
.
,
.
-
_
s
,
,
- . " .
.
.
-
NOV 3 0 1981
Mississippi Power and
2
Light Company
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-416/81-51
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
RII
RII
RII
RII
RII
R I
AJohnson:aw
FJape
b
C
Jf
ki3f R
ewis
,fg,e1
y
n/ye1
1
e1
. /e1 gj mge1