Text
C-
]
MISSISSIPPILPOWER!&1 LIGHT COMPANY Help {ng 'Builit Miss/Osippi Eullaikididd5 P. O. B OX 164 0, J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 22 J td B P2 00
,S E,Y January 6, 1982 NORR S g
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Regional Administrator
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 RII:
AHJ 50-416/81-51 IE Inspection Report of November 9-12, 1981 AECM-82/09
REFERENCE:
MAEC-81/251, 11/30/81 This letter provides our response to NRC Violation Item 416/81-51-01 as transmitted by your letter MAEC-81/251, dated November 30, 1981.
I.
ADMISSION OR DENIAL OF THE ALLEGED VIOLATION During the NRC visit of November 9-12, 1981, the NRC inspector concluded that the Bechtel CTO group was performing Local Leak Rate Testing (LLRT) on containment penetrations without proper authorization. The Grand Gulf Startup Manual (SUM) requires that work done by construction personnel on systems turned over to MP&L be controlled by the authority of a Construction Work Permit (CWP). The LLRT procedure deleted the requirement for a CWP, but this is unacceptable, since the LLRT proce-dure is a lower-tiered document than the SUM.
MP&L concurs with this violation.
II.
REASON FOR THE VIOLATION The cause of this violation was that the SUM did not adequately define the intended controls required for ths LLRT program. The LLRT was a task assigned to the constructor and c 'sidered a defined scope of work.
In that the systems were not being moditied, startup personnel inter-preted the activity to be outside the scope of the CWP program. The SUM did not address the exemption of the LLRT from the CWP program.
8202050184 820120
{DRADOCK05000h Member Middle South Utilities System i
PP"'
1
- 0ffica of Inr,pectirn & Enforciment AECM-82/09 USNRC, R;gi:n II P::ga 2 Mr. J. P. O'Reilly, Regional Administrator III.
CORRECTIVE ACTIONS TAKEN & RESULTS ACHIEVED The SUM has been revised to permit LLRT and related inspections to be performed by construction personnel without a CWP, but with the Startup Test Supervisor's cognizance (ref. SUM 5000, Para. 4.4.1.6).
IV.
CORRECTIVE STEPS TAKEN TO AVOID FURTHER VIOLATIONS Training sessions have been held with all Startup Test Supervisors which explain revisions to the SUM.
V.
DATE TO ACHIEVE FULL COMPLIANCE The SUM was revised on December 14, 1981. Training regarding the revisions has been completed.
ou,rs truly, N '!'
/
\\
MAL /JWY/ACP:dr cc:
Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Richard C. DeYoung, Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401
c.
AECM-82/09 Page 3 Director of Office of Inspection & Enforcement STATE OF MISSISSIPPI COUNTY OF HlNDS Personally appeared before me, the undersigned authority in and for the jurisdiction aforesaid, N. L. Stampley, who being by me first duly sworn, stated on oath that he signed the above and foregoing on the date and year therein mentioned, and that the information contained r.herein is true and correct to the best of his knowledge and belief.