826160 TENNESSEE VALLEY AUTHORITY DESIGN SPECIFICATIN SNP-DS-1935-4239-RO May 30, 1979 SEQUOYAH NUCLEAR PLANT UNIT 2 FLEXIBLE INSTRUMENTATION HOSES FOR INSTRUMENTATION AND CONTROL I certify that this design specification is correct and ccuplete and is in ecupliance with Paragraph NCA-3252 of the ASME Boiler and Pressure Vessel Code,Section III, Nuclear Power Plant Ccuponents. This design specification consists of the following:
Revision No.
or Date 1.
Schedule 1 RO 2.
Attachment C, Quality Assurance Requirements for ASME Section III Components (Excluding Pumps, Valves, and Autmatic Backwash Filters),
Ccuponent Supports, and Piping Subassemblies May 7, 1979 3
Attachment M, Marking and Certification Requirements for Pipe, Fittings, Flanges, and Bolting for Use in ASME Section III Nuclear Class 2 or 3 Systems April 6, 1979 4.
Attachment Q, Pipe, Fittings, Tubing, and Miscellaneous Cmponents Austenitic Stainless Steel Heat Treatment Welding Materials, Packaging, and Marking December 26, 1978 1"
EE 1
3 IdI5
'h
~
tg
'~
m Ivan {. B lt @'" *
- Registered Prof gsi k$5 Prepared Date Correlated Date Submitted Date Approved Date Q. ()& Ud(19 WQ
{/f/7g
[ if/7) &mjQ 4/s~/11
(
8202010352 811125 PDR ADOCK 05000327 P
PDR k
/
No.
826160 TENNESSEE VALLEY AUTHORITY ASME SECTION III CLASS 2 F'EXIBLE HOSE ASSEMBLIES DESIGN SPECIFICATION CRITERIA LOCATOR INFORMATION REQUIRED BY NCA-3252 AND ITS LOCATION IN THIS SPECIFICATION 1.
Function of the component including any Schedule of prices dimensions upon which the functional perfomance depends.
2.
The design requirements, i.e., the mechanical Schedule of prices and operational loadings.
3 The environmental conditions, including Schedule of prices radiation.
4.
The code classification of the c mponent.
Schedu'.e of prices 5
The definition of the caponent.
Schedule of prices 6.
Material requirements.
Schedule of prices 7.
Certification of the design specification.
Cover sheet i
8.
Operability requirements.
Schedule of prices I
l (1)
/
Schedule of Prices No.
826160 Page No.
2
';'y A nricu. On u nvicE.........c..n o on camos 0.3 OUANTITY UNIT UNIT PniCE AMOUNT
% L ? ". C E SCHEDULE 1 Sequoyah Nuclear Plant ASME Section III, Class 2 Flexible instrumentation hoses - The flexible hose shall be a straight section of hose with end connections.
Flexible hose shall be NPI stamped and meet the requirements of ASME B&PV Code Case N-192.
The flexible hose is to have annular convolutions and be covered with braid. The pressure containing welded or seamless boundaryconsistsofsingle-plyb3(materialtomeet tubing or inconel 625, ASME SB-the requirements of SB-W4 as modified by ASME Code Case N-188. Pressure test may be performed at top assembly, reference ND-6114), or SB-M4.
The braided wire covering the convoluted metal bellows shall be stainless and heat resisting steel wire in accordance with ASTM A 580-75 of material types listed in Tables I-7.0 and I-8.0 of ASME SA-479 All wire strands shall be welded to the welding collars and visually examined.
l The end connections shall be square cut 1/2-inch OD.
j tube with a wall thickness of 0.095 inch, material of ASME SA-213, TP304.
Metal Bellows Corporation nuclear instrumentation hose assembly, or equal.
(
The boundaries of the hose assemblies are the ends or the end connections.
The canplete flexible hose assembly requires NPT stamp.
I i
t l
l TVA 60$1 (OP+74 atODEn
Schedule of Prices No.
826160 Page No.
3 ARTICLES OR SEnytCES e etvs esscwsPYeoes on catatoe seo.t QU AN TITY UNIT UNIT PRICE AMOUh7
$"[
w :" = a Design Requirements:
The flexible instrumentation hose assemblies will contain static system water as sensing lines to instrumentation in the reactor coolant system (RCS),
main steam system (!G), feed water system (W), and auxiliary feed water system (AW). The hose is to absorb thermal expansion movements between equipnent/ piping and instrumentation connections.
Internal design conditions:
RCS MS W
AW Design pressure, 2500 1100 1100 1600 pounds per square inch gauge Design temperature, 'F 700 600 600 120 Operating pressure, 2335 1000 1000 1200 pounds per square inch gauge Operating temperature, 'F 650 550 550 90 The environment is:
Envirornnent Normal Accident Ambient temperature, "F 140 mavi = =
250 Ambient pressure, per 10.3 15 square inch gauge Humidity, percent 80 100 Radiation 2 rad /hr 10 rad 40-year total Cyclic Life Requirements:
General. Assembly shall be designed for a total lifetime of 40 years and undergo the conditions specified below. Cyclic design shall be based on analytical and test results. Certified design report shall be submitted for pennanent retention by TVA.
T V A 50S I (OP+13)
BIDDER
\\
Schedule of Prices No.
826160 i
Page No.
h
~
nT:Cus on senve:ss esive pescameON on CamOS No.t QU ANTITY UNIT UNIT PntCE AMOUNT
- si',of."..Y.Ti6.7 Model description. The hose assemblies will be installed per Contractor's recanmendations as delineated in an instruction manual to be submitted for pemanent retention by TVA. Diaplacements are applied to one end connection along three orthogonal axes simultaneously.. The assembly is filled with fluid and pressurized to the operating pressure.
Displacement due to themal expansion. The hose assemblies shall be capable of the following themal expansion movements:
X axis = -0.444 inch Y axis = +2.886 inches Z axis = -2.128 inches Mechanically induced vibration. Sine wave input corresponding to 0.5 g acceleration in each direction at frequencies of 10, 15, 30, and 60 Hz.
Evaluate for input at most critical frequency for 40 years of continuous service.
Seismic criteria. Seismic test criteria shall be as delineated in Metal Bellows Corporation's qualification test procedure @'FT3989, paragraph 4.6.
Contractor shall furnish data with respect to the susceptibility of the flexible instrumentation hose assemblies to damage by inadvertent mishandling (e.g., crushing, kinking, etc.) and also provide any specialhandlinginstruction/protectionmethodshe feels are required to prevent such damage.
TVA Soll (DP473)
BIDDEN
r Schedule of Prices No.
826160 Pago No.
5
[o ARTICLES OR SERVICES IGivt Os.C AIPf 40N OR C AT ALOG NO.9 QUANTITY UNIT UNIT PRICE
'AMOUNY
'#Lt."".#4.*i.:T' Ficxible instrumentation hosca and material chall be manufactured in accordance with Section III of the '
ASME Boiler and Pressure Vessel Code, Division 1, latest edition and addenda in effect on contract date.
For additional requirements sec attachments C, M, and Q.
ASME Section III, Class 2 TVA material classification B Mk No.
1 1/2" OD tube si::o 4'N600 I 6 100 EA t1 Delivery No.
g Date Wanted S1tip-To Ref Acet Ref 01 100%
8-10-79 01 01 Briknd name & figure no.
Manufacturcr Point of manufacture Drawing submittal after award (days)
Total Schedule 1 Shipping Data. Bidder must state:
Number of calendar days after award for delivery, days Point of origin of shipment Method of shipment from origin and name of first carrier Method of delivery at destination Shipping weight TVQ S018 (DP 9-73}
DIDDER
r i
No.
826160 t at e
'7-7-74 TENNESSEE VALLEY AUTHORITY ERRATA TO ATTACHtEC C QUALITY ASSURANCE RRUIRE:33S FDR ASME SECTION III COMPONDES (EXCLUDING RBES, VALVES, AND AUTOMATIC BACKWASH STRAINERS), COMPONEIT SUFFOETS, AND FIPDIG SUBASSEMBLIES 1.
Add the following paragraph:
6.0 Right of Access The Engineer or his designated aSent shall have access to the Contractor's facilities, as well as those of his subtier suppliers (to be secured by the Contractor through his procurement documents), for inspection and surveillance during manufacture and for audit of the Quality Assurance ITogram.
A =4n4=" ti=e will be given in advance of such access.
The method of notification of such access will consist of a method to be deter =ined later.
2.
Delete Section 4.0 nonconformances and replace with the attached Appendix B.
l t
l l
[
l I
I (1) i k.
r PROCUREMENT QUALITY ASSURANCE O
APPENDIX B INSPECTION: Cl!IEF, QUALITY ENGIKEERING BRANCH REPAIRS AND NONCONFORMING MATERIALS is found that material, a part, equipment, or activity is not in When it accordance with the approved specifications, procedures, drawings, or 1.
The Contractor contract requirements, it becomes a nonconforming item.
will disposition the nonconforming item as scrap, rework, " repair to If the disposition other than original specification," or "use as is."
is scrap or rework, the Contractor may proceed with work, provided that If the disposition is " repair no other contract provision is violated.
to other than original specification" or "use as is," the Contractor must submit the nonconformance to TVA for approval prior to proceeding with the work.
It shall be the responsibility of the Contractor and his suppliers, if any, to report nonconformances with disposition "use as is" or 2.
" repair to other than original specification" on a Nonconformance Report, form TVA 10548. For subcontracts with manufacturers or suppliers in which the responsibility has not been stated, it shall O
be the responsibility of the Contractor to report nonconforming items.
is responsible for The originat or of the Nonconformance Report The Contractor is 3.
sections of the form.
completing all applicable required to attach to the Nonconformance Report all descriptive information that may be necessary to clearly describe the nonconformance.
The proposed disposition and/or corrective action of the Nonconformance Report shall include supporting facts such as calculations, test results, or results of other investigations showing why the condition The Nonconformance or repair method is technically acceptable. responsible representative of the Contractor Report shall be signed by a The TVA Inspector at the supplier's and submitted in quadruplicate.
plant shall initial and date the report prior to submittal.
Nonconformance Reports, with disposition "use as is" or " repair'to other than original specification," are to be initially transmitted 4.
by the Contractor to the Chief, Quality Engineering Branch, or his The Chief, Quality Engineering duly authori7ed representative.
Branch, will not accept the Nonconformance Report if the TVA Inspector i
8 has not initialed on the original report.
l The Contractor is responsible for ensuring that all nonconforming are properly marked or tagged, segregated l
5.
material, parts, or equipment (if applicable), and that adequate records are from conforming items further fabrication, manufacturing, 10 maintained to ensure that or processing is not performed pending approval of the final disposition.
f TVA l053S(EN DtS-7-77)
-~
PROCUREMENT QUALITY ASSURANCE C
APPENDIX B (Continued) 6.
The Contractor is responsible for correction and reinspection of all nonconformances in accordance with TVA direction.
7.
All of the above provisions apply equ. illy to any e.ubcont ract ed i t em provided by any supplier of the Contractor, and it shall be the responsibility of the Contractor to require and ensure full compliance from his suppliers with t he above provisions.
C l
C TvA toS3S(EN DLS-7-77)
No.
826160 MEB-EP 23.5.5 Attachment C Page 1 of 4 Date: 5-7-79 TD(NESSEE VALLEY AUTHORITY f
QUALITY ASSURANCE REQUIREMENTS FOR ASME SECTION III COMPONENTS (EXCLUDING PUMPS, VALVES, AND AUTOMATIC BACKWASH STRAINERS), COMPONENT SUPPORTS, AND PIPING SUBASSDtBLIES 1.0 QUALITY ASSURANCE PROGRAM - GENERAL REQUIRD(ENTS The Contractor (or Bidder) shall maintain an established written description of his system for the control of quality of work for materials, design, f abrication, ermuination, testing, inspection, and certification which will assure that all components, component supports, and piping subassemblies to be furnished under this contract (or Invitation to F:.d) shall meet the requirements of this specification, including the referenced codes and standards. His quality assurance program shall be in accordance with ASME Section III.
His quality marrrance manual shall be submitted with his bid to TVA for review and oneptance. If the Bidder has submitted his manual on a previous TVA contract, he may comply with paragraph 5.2.3 of this attachment. Af ter award of contract, the program and manual shall be available for review and accessible to audit throughout the life of the contract. The Contractor shall, during the life of the contract, submit all proposed changes of his quality assurance program to the TVA Division of Engineering Design Quality Assurance Group
- for review and approval prior to implementing the change. All revisions of the quality assurance program shall be identified by the TVA project name and contract number.
1.1.1 All ASME Section III components, component supports, and piping sub-assemblies shall be manufactured in accordance with Section III of the ASME Boiler and Pressure Vessel Code. Items shall have the appropriate N-stamp.
1.1.2 The Bidder or Manufacturer of Class 1 or 2 components, component supports, and piping subassemblies shall have, as a minimum, a quality assurance progen in accordance with the quality assurance req"irements of ASME Section III.
1.1.3 The Bidder or Manufacturer of Class 3 components, component supports, and piping subassemblies shall have a quality control system in accor-dance with the quality control requirements of ASME Section III.
- Tennessee Valley Authority Quality Assurance Group Attn:
P. L. Duncan, Head Quality Assurance Engineer 400 Commerce Avenue, W11D136 C-K Knoxville Tennessee 37902 i
s MEB-EP 23.5.5 Attachment C Page 2 of 4 2.0 APPLICABLE SUBTIER STANDARDS The following subtier standards, when checked, are considered a part of this specification.
2.1 Packaging, Shipping, and Handling
[ N45.2.2 - 1972 Level B / 7 C / / DN 2.1.1 Paragraphs 3.0 and 4.0 only of this standard shall apply, as applicable.
2.1.2 Contractor shall submit his packaging and shipping procedure (s) to the Engineer for review and approval.
2.1.3 Any exceptions and/or modifications to ANSI N4,5.2.2, as is necessitated by the Contractor's design requirements, shall be submitted to the Engineer for review prior to shipment.
2.1.4 ltems of the same classifiestion only shall be packaged in any one container, crate, or skid.
2.1.5 The Contractor shall submit to the Chief Storekeeper, TVA site address, least 30 days prior to shipment of the item to the site, two copies at of handling, storage, and receiving instructions (including any special receiving inspection for the item at the construction site). The copies are in addition to the manuals and procedures normally furnished through regular channels and shall be forwarded directly to the Chief Storekeeper.
2.2 Collection. Storage and Maintenance of QA Records
>(
N45.2.9 - 1974 2.2.1 The Contractor shall comply with the applicable portions of paragraphs 3.2.1 through 3.2.6 of this standard in the preparation and control of l
quality assurance records.
2.2.2 The Contractor shall comply with the applicable portions of paragraph 5.0 of this standard until all quality assurance records are transmitted j
to TVA.
3.0 ADDITIONAL QUALI*IY ASSURANCE REQUIREMENTS The Contractor's Quality Assurance Program must also implement the quality assurance requirements of other codes and standards made a part of this specification.
i The Contractor shall impose the applicable quality assurance require-ments in this specification on any subtier suppliers through his procurement documents, including those of the referenced standards
(
and this attachment.
I
I KEB-EP 23.5.5 Attachment C Page 3 of 4 4.0 NONCONFORMANCES Any deviations from the contract requirements or specifications, or repairs to equipment fabricated f rom approved drawings and procedures shall be reported by the Contractor immediately upon discovery of the It shall be reported to the Chief, Quality Engineering deviation.
Branch, or his duly authorized representative by means of a Any additional NONCONFORNANCE REPORT
- and submitted in quadruplicate.
work done on the affected part prior to a satisfactory disposition of the deviation will be at the Contractor's risk. NONCONFORMANCE.
REPORT forms will be furnished the Contractor by the Chief, Quality Engineering Branch, or his duly authorized representative.
When it is found that material, a part, or equipment is not in accor-4.1 dance with either the drawing or specification, the Contractor may either scrap or repair the nonconforming ites provided no other contract If the Contractor elects to repair, the method provision is violated.
of repair must be approved by the Technical Engineer prior to commence-ment of the repair.
if It shall be the responsibility of the Contractor and his suppliers, 4.2 For subcontracts with manu-any, to report all nonconforming items.
f acturers or suppliers in which the responsibility has not been stated, it shall be the responsibility of the Contractor to report nonconforming items.
The originator of the N3NCONFORMANCE REPORT is responsible for com-4.3 The Contractor is pleting all applicabic sections of the form.
required to attach to the NONCONFORMANCE REPORT all descriptive infor-mation as may be necessary to clearly describe the nonconformance.
The proposed disposition and/or corrective action of the NONCONFORMANCE REPORT shall include supporting f acts such as calculations, test results, or results of other investigations showing why the condition The NONCONFORMANCE REPORT shall be signed is technically acceptable.
by a responsible representative of the contractor prior to submittal.
then the If TVA inspection is to be performed prior to shipment, NONCONFORMANCE REPORT aust also be dated and initialed by the TVA Inspector at the supplier's plant.
All NONCONFORMANCE REPORTS are to be initially transmitted by the 4.4 Contractor to:
The Chief, Quality Engineering Branch (in quadruplicate), if, The Chief, a.
he represents TVA in the inspection of the ites.
Quality Engineering Branch, will not accept the NONCONFORMANCE REPORT if the TVA Inspector has not initialed the original copy of the report, or The Chief, Mechanical Engineering Branch (in dup 11 sate), if the b.
be inspected at_the construction site.
item is tri
- TVA Form 10548 or 10548A
1 MEB-EP 23.5.5 Attachment C Page 4 of 4 4.5 The Contractor is responsible for assuring that all nonconforming material, parts or equipment are properly marked or tagged, segregated from conforming items (if applicable), and that adequate records are maintained to assure that further fabrication, manufacturing, or processing is not performed pending final disposition.
4.6 The Contractor is responsible for correction and reinspection of all nonconformances in accordance with TVA direction.
4.7 All of the above provisions apply equally to any subcontracted item provided by any supplier of the Contractor, and it shall be the responsibility of the Contractor to require and assure full compliance from his suppliers to the above provisions.
5.0 DOCUMENTATION 5.1 Various documents are identified within this Invitation to Bid to be submitted to TVA to verify quality of work required on the contract. Any additional documents necessary to verify quality shall be identified and submitted by the Bidder.
5.2 The Bidder shall comply with the following:
5.2.1 For those activities required to meet ANSI N45.2-1971 and the standards referenced in section 2.0 of the specification, the bidder's quality assurance manual shall cover the specified areas. This information shall become a part of the contract. TVA reserves the right to reject any bid that does not comply with this requirement.
5.2.2 For those items required to meet ASME Section III, the Bidder shall submit, with his bid, a copy of the Manufacturer's Certificate of Authorization in addition to his quality assurance manual. This information shall become a part of the contract. TVA reserves the right to reject any bid that does not comply with this requirement.
5.2.3 In lieu of the above submittals, the Bidder may identify in his bid a previous TVA contract in which the supplier's, Manufacturer's, or Bidder's certificate and quality assurance manual were submitted, and he shall submit with his bid a description of any major changes made to the quality assurance program since the above approval.
If a Knoxville office of TVA has been assigned a controlled copy of a quality assurance manual or current copy of the Bidder's or Manu-facturer's Certificate of Authorization, reference shall be made to the control number, name of holder, and latest revision in effect, in which case Bidder need not submit another copy.
5.3 Appropriate documentation requirements shall be included in all subtier procurement documents.
5.4 All records submitted to TVA must be clearly identifiable as to the TVA project, contract number, unit number, component type, and component identification number.
l 1
e 9
TVA 10548 (EN DES 9 78)
TENNESSEE VALLEY AUTHORITY QUALITY ENGINEERING BRANCH This form also replaces SWLIER NONCONFOWANCE REN 10548A (EN DE54 76)
Report No.
Contract No.
Unit Nuclear Project Supplier Date Supplier Notified (When initiated by TVA Inspector)
Inspection Date Date TVA Inspector Notified How Notified Type of Nonconformance: MaterialO Shop Fabrication OtherO Identification of item or Documentation:
Nonconformance
Description:
Recommended Disposition: USE - AS - IS O REPAIR TO OTHER THAN ORIGINAL SPECIFICATIONSO Comments (Include technical justification; repair procedure, when applicable; cause;and action to prevent recurren TVA Inspector initials Supplier Authorization:
Signature Title Date QE8 Review:
Requires Design Disposition.
Yes O No O.
Significant Condition Adverse to Quality Yes O
.No O l
Reviewer (Signature and Date):
Design Disposition:
APPROVED 0 APPROVED WITH CONDITIONS O REJECTED Comment:
1 Design Engineer (Signature and Date):
Technical Engineer (Signature and Date):
For STRIDE contracts. Design Disposition is obtained from General Electric Co. and C. F. Braun and Co.)
1 (Note:
QEB Approval:
7 Chief, QE8 (Signature and Date);
l' Disposition Verified (Signature and Date):
l l
l
o No.
826160 Date:
4/6/79(N)
TENNESSEE VALLEY AUTHORITY ATTACINENT M MARKING AND CERTIFICATION REQUIRDEITS FOR PIPE, FITTINGS, FLAIGES, AND BOLTIUG FOR USE IN ASME SECTION III NUCIEAR CLASS 2 OR 3 SYSTEMS 1.0 GENERAL REQUIREMENTS Pipe, fittings, flanges, and bolting shall confonn to the requirements of the ASME Boiler and Pressure Vessel Code,Section III, Division 1 (latest addenda in effect on the date of award of contract), class as indicated in the schedule of prices.
2.0 EXCLUSIONS Cast or mitered fittings or fittings and flanges which are machined by other than the forger are not accettable.
3.0 APPLICABLE STANDARDS 3.1 Pipe, fittings, flanges, and bolting shall be marked in accordance with the material specification and any additional requirements imposed by the following:
3.1.1 ASME Section III, Subsection NCA, Paragraphs NCA-3866 and i
NCA-3867 and MSS SP-25.
l l
3.2 Pipe, fittings, flanges, and bolting shall meet the dimensional requirements of the following standards:
3.2.1 Pite. ANSI B36.10 for carbon steel and ANSI B36.19 for stainless steel.
3.2.2 Fittings. ANSI B16.9 for butt-weld fittings and ANSI B16.11 for socket-veld and threaded fittings.
3 2.3 Flanges. ANSI B16.5-1968 for flanges through 24-inch nominal pipe size.
3.2.4 Bolting. ANSI B16.5-1968.
4Property "ANSI code" (as page type) with input value "ANSI B16.5-1968.</br></br>4" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..0 CERTIFICATICNS AND STAMPING 4.1 SEAMIESS PRODUCTS 4.1.1 Four copies of one of the following, as applicable, shall be furnished by the manufacturer to TVA. Two copies shall acecorpany 1-
ATTACFJtENT M (Continued) shipmens and two copies shall be mailed to the attention of the Chief Storekeeper at the construction site (see special conditions for his address).
4.1.1.1 Certified material test reports in accordance with NCA-3867.4.
4.1.1.2 Manufacturer's Certificate of Compliance with the material specification, grade, class, and heat treated condition for pipe, fittings, and flanges 3/k-inch nominal pipe size and less; and bolting 1-inch nominal diameter and less, in accordance with NCA-3867.4.
4.2 WELDED PRODUCTS I
\\4.
In ad t on to t cument n requi in sect on 4.1 a ve, velded oducts s lied as erial
.a be p ed v ASME ata repor fo M-and
'te py o radio ic requi d or the x natio f materi or mate al ir welds hall be luded rt of
.e CMTR.
pip hi qual ie as a uba emb sh b furn h with ASME at repor f N-2 ddition the re t and docume ation me oned ab
.2.2 The st p s req r for tu ar prod ts welde th ler met in acco ce with agrap C-560 r
ass 2 rial d
agr
-256 for as 3 mat 4
Fitt made to ecifica ns SA-
, SA-40, a.
SA 42 o
whic a man et ed by' vel ng all rked h
e may ing s b speci pd, supp ented by e letter 50 EXAMINATION 5.1 Longitudinal weld joints of ASME Class 2 and Class 3 material velded without filler metal shall be radiographed in accordance with NC-2550.
5.2 Longitudinal weld joints of Class 2 and Class 3 material welded with filler metal shall be radiographed in accordance with NC-2560.
6.0 MARKING 6.1 Example from schedule of prices:
Item No.
Size Class Mark No.
Quantity Unit g
23 6"
C 17W403-2 6
each 24 4"
C 17W600-6 1
only,
t ATTACHMENT M (Continued) i Each item as shown in the example above shall be marked with (1) its item number and (2) where one is shown, its mark number.
Each piece of every item need not be marked separately, but all pieces of the particular items shall either be packed or bundled l
together, and these packages or bundles shall be marked in ac'.ordance with the guidelines shown above. Where tags are used for marking, metal tags should be used.
. 2pe, fittinen, and rinngen 3/4-inch naminni pipe alze and 2nrger 6.2 and bolting larger than 1 inch nominal diameter shall be marked with the following requirements in addition to those shown in 6.1:
The material shall be marked in accordance with the requirements of the material specification, including the applicable specifi-cation and grade of material, and it shall be marked with either j
its heat number or a heat code which is traceable to the required I
certifications referenced in 4.0 above.
Pipe, fittings, and flanges 3/h-inch nominal pipe size and smaller 6.3 and bolting 1-inch nominal diameter and smaller shall be marked with the following requirements in addition to those shown in 6.1:
Material in this category does not have to be individually marked with the data shown in 6.2 above. However, they shall be packed in packages, containers, or bundles which are clearly marked with the material specification and grade. Heat numbers or heat codes are not required to be chaan either on the Certificates of Compliance or on the markings on the packages, containers, or bundles.
USE OF AS'IM MATERIAL SPECIFICATICNS IN LIEU OF ASME SPECIFICATIONS 70 The use of ASTM material specifications as alternates for ASME material specifications is pemitted provided the requirements of NCA-1220 are satisfied.
_ )
l ATTACIOGNT Q (Continued)
Where specified and required, desiccants shall be utilised
- 6. Desiceants.
Desiccants shall consist of non-to maintain water vapor limits.
The deliquescent, nondusting, chemically inert, dehydrating agents.
following criteria apply when they are used:
When used with austenitic stainless steels, the desiccant and the bag material shall not have a halogen content over O.25 percent.
a.
The desiccent bag shall be made of puncture, tear, and burst-resistant material.
The reactivation te:nperature and time shall be marked an the desiccant b.
container.
Canisters used to contain desiccants shall be placed so as to cause no deleterious effects such as galvanic corrosion, even when the c.
desiccant has reached its absorptive capacity for water vapor.
Desiccant bags and canisters, when used, shall be secured to prevent movement, rupture of the bags, or damage to the item beirg protected.
4.
Water-vaporproof flexible barriers shall be used to seal items The included air volume within the flexible e.
containing desiccants.
barrier shall be kept to a m_4n4mun.
Items which contain desiccant shall have all openings securely sealed.
f.
When flange connections are a part of the barriers, 0-rings or gaskets shall be used with all bolts in place and tightened sufficiently to ensure a water-vaporproof seal. Weld end preparations, after capping, shall be covered with a water-vaporproof seal.
(
The Contractor may submit for approval to TVA an alternate to the above 7
procedures which he feels meets the requirements.
0,