Forwards Const/Fuel Load Schedule & Progress Update as of 811229.Project Considered 97.2% Complete as of 811229
ML20040D350
Person / Time
Site: Zimmer
Issue date: 01/18/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8202010208
Download: ML20040D350 (6)


Text

.

-O nn THE CINCINNATI GAS & ELECTRIC COMPANY ss- -

CINCINN ATf. OHIO 45201 January 18, 1982 sci,o^[vi$c"$ c^s"o",

PRIh*CIPAL STATF DIE F6Isl

' fD

?!D D

U. S. Nuclear Regulatory Commission 4/D

!1L d%t Iqftyt Office of Inspection and Enforcement Region III LgM jUy*

~

Glen Ellyn, Illinois 61037 HEP &O File Attention: James G. Keppler Regional Director

  • ~

A.

9 6

Subject:

Wm. H. Zimmer Nuclear Power Station - Clermont Cou

, Ohio Construction / Fuel Load Schedule and Progress Upda NECEi;fpp-i*

December, 1981.

g Gentlemen:

I'$'

Please be advised regarding the above subject that this projec hconsidered A 97.2% complete as of December, 29, 1981.

/

i Attached are copies of the form showing actual dates and status of various activities.

t Please feel free to contact us if there are any questions or connents.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY f h h "

~--

E. A. BORGMANN Senior Vice President EAB:bm cc: Wm. H. Lovelace W. F. Christianson, NRC Resident Inspector bohKOhh0$!8 JAN 2 5 1982

~

Ybb

J ACTUAL DAILS & STATUS DOCKET f.0. 50-358 B5:R CONSTRUCTION MILESTONES AND ACTIVITIES FOR STATUS DATE WM. H. ZIMMER NUCLEAR POWER STATION 82-B f Activity Activity Est.

I-J Numbers (Description &AccountNumbers)

Started Complete Status 0

8005 Mobilize 3-71 6-71 Comp 1.

0 8014 Tenden Tunnel & Backfill 10-72 5-73 Corpl.

0 8155 Install Diesel Generator and Oil Tank Building (1220) 5-74 9-79 Ccmpl.

n 8235 Install Condensate Water Storage Tank (2491-3310) 6-74 10-75 Corp 1.

,0 8245 Install Reactor Clean-Up System Demineralizers (2423-5110,5250,5410) (2427-5410) 7-75 11-75 Compl.

0 8265 Install RHR Pumps (2425-5110) 7-75 2-78 Compl.

O 8270 Install RHR Heat Exchangers 1425-5210) 11-75 11-75 Compl.

0 82E0 Construct Radioactive Waste Facility (1260) 4-74 12-78 Comp 1.

0 8315 Install Motor Control Centers (MCC's) and 480 Volt Unitf ubstation (4711-7470,7490)(4718-7470) 12-7s 5-78 Compl.

t 0

8320 InstallInstrutertationAirSystem,(26_52]

_ 6-76 4-79 Ccepl.

O 8330 Install Recirculating Piping (2641) 11-72 5-79 Compl.

I l0 8341 Install Reactor Building Closed Cooling Water System (2673) 7-75 5-79 Compl.

, 0 8350 Install HPCS, LPCS and ADS Systems (2647) 2648) & M S Relief Valves 10-75 5-79 Corp 1.

I I

O 8365 Install Standby Liould Control System (2681) (2422) 2-76 5-79 Comp 1.

O 8370 Process Control & Logic Instrumentation Calibration (2470) 8-75 2-82 Est.

97%

0 8400 Install 6.9XV Reserve Powe* Supply (4715) 10- 75 6-77 Comp 1.

1

.t f

> - f. s

.)

i 4

~ ~ ~ -I-J huMBERS (Description & Account Numbers)

Activity Activity

Est, Started Compitted Sta tus-

?

O 8405 Install Conduit and Cable Trays (4750-7110, 7180, 7120) 8-73 5-81 Compl.

1 0

8410 Install 6.8KV and 4.16KV Auxiliary Switchgear (4712) 11-75 7 79 Compl.

O 8415 '

Install Cables (Instrumentation, Control and Power) (XXXX-7310 thru 1370)(XXXX-7210 thru 7270; 2-76 11-81 Compl.

l 0

8420 Perform Construction Testing on Cables (Megger, Continuity, Etc.)

CG8E 2-76 12-81 Est.

95%

l 0

8425 Install Batteries and Chargers (4722-7550, 7560) 4-76 2-77 Compl.

l 0 8435 Install Process Instruments (2650-0000) (2470-0000) 6-76 2-82 Est.

97%

0 8520 HPCS rad LPCS Actuation and Partial Flow Test CG&E 5-81 4-82 Est.

50%

-l 0

8525 RCIC Actuation and Partial Flow Test

.7-815st 4-82 Est.

3%

a 0

8530 RHR System Actuation and Flow Test 7-81Es t 4-82 Est 10%

=

O 8535 Stand-by Liquid Control System Actuation Flow Test 10-79 3-82 Es t.

40:

a O

8540 Recirculation Pump Cold Flow and Vibration Test 4-81 1-82 Est.

40%

a 0

8545 Integrated Diesel Generator Syr:hronizing Test 4-82Est 5-82 Est.

29%

a 0

8550 Service Water System and Closed Water Systems Test 10-78 3-82 Est.

46%

j 11-78 10-79 Compl.

l 0 8555 Battery Capacity Test a

0 857G DC Inverter / Diverter System Test

=

10-80 4-82 Est.

81%

4-79 4-81 Compl.

{

0 8575 Contrcl Rod Drive Hydraulic System Test 0

8580 Feedwater and Condensate System Test (2 Elemeats) 10-79 3-82 Est.

75%

=

0 8585 Instrument Air System Test 7-79 2-81 Compl.

0 8590 Fire Protection System Test 6-79 4.82 Est.

75%

0 8595 Flammability Control System (HG)12-81Est 4-82 Est.

0%

=

t 6

J ll 3

0;e 3 I

I-J Nur.bers (Description & Account Numbers)

Activity Activity Est.

Started Completed Status.

0 8510 Reactor Cullding Vent System Test CGAE 9-60 5-81 Est.

78%

0 8730 Speical Nuclear Material License Issued CG&E 4-77 7-78 Co pl.

O 8735 Applicant Sumbits Emergency Plan CG&E 9-75 11-77 Compl.

1 0

8740 Applicant Submits Security Plan CGtE 9-75 5-77 Compl.

0 8745 Applicant Submits Quality Assurance Program for Operations CG&E 9-75 12-77 Comp 1.

l 0

8750 Applicant's Review and Approval of Test Results CG&E 7-82 Est.

7-82 Est.

0%

0 8755 Applicant's Preparation of Power Ascension Test Progra:n CG&E 4-77 7-82 Est.

25%

l 0

8805 Install Control Room Consoles and Equipment (2475)(2471) 8-75 2 -82 Est.

90%

1 1

0 8810 Accumulation of Environmental Data (One (1) or Two (2) Years)

Compl.

l 1

a 0

8920 Install and Calibrate Nuclear Instrumentation (2474) 12-75 5-80 Compl.

i 1

0 8900 Install Primary Switchyard CG&E 8-75 8-78 Compl.

0 8905 Install Off-Gas Systems (2685) (2462) 4-74 6-81 Compl.

0 8240 Install Condensate Suction Header to RCIC System (2642) (2634) 5-75 2-77 Comp 1.

l 8005 8015 Prepare Site (1100) 5-71 6-71 Compl.

8015 8050 Install Reactor Building Foundation (1211) 6-73 10-73 Compl.

8050 8200 Install Drywell and Suppression Chamber and Reactor Pressure Vessel Pedestal (2213) (2411) 10-73 2 -8 2 Est.

91%

8055 8325 Construct Reactor Bulding and Integral Structures (1210) 10-73 9-79 Comp 1.

8060 8145 Construct Turbine / Generator Foundation (3514) 10-73 6-78 Comp 1.

8065 8915 Install Off-Gas Stack (2466-3610) 8-76 7-78 Comp 1.

8075 8920 Install Secondary Heat Sinks (Cooling Towers)(3571; _

9-73 5-76 Comp 1.

8115-8120 Install Containment Penetrations (Sleeves in Liner' (2213-3770) 12-73 11-74 Comp 1.

\\

h t

e

Activity Activity Est.

)

I-J Numbers (Description & Account Numbers)

Started Complet)

Sta t'us.

8140 8275 Install Service Water Intake Structures (1280) 8-74 10-78 Compl.

8145 8910 Install Condenser, Turbine Generator and Piping (Exclusive of Condensate and Feedwater Piping) (3531) (3511) 8-75 12-80 Ccmp1.

8150 8285 Install Feedater and Condensate Water System (2623) (2634) 1-75 5-79 Compi

.8155 8445 Install Diesel Generator (2487-5160) 5-76 8-78 Compl.

8165 U430 Install Drywell Air Cooler System (2624) 7-76 1-82 Est.

92%

l 3175 8180 Install Containment Biological Shielding (2213-3750,2740,2720,2730) 2-75 11-77 Compl.

l 8200 8300 Install Reactor Pressure Vessel (00 Site) (2411-5310) 11-75 1-76 Compi.

f 8205 8230 Install Recirculating Pump (2412-5110) 9-75 12-78 Compl.

I 8210 8325 Install Main Steam Lines to MSIV 9-75 3-77 Compl.

8215 8465 Install Control Rod Drive System (2414)(2684) 7-75 4-79 Comp 1.

l 8220 8440 Install Reactor Internals (2411-5610) 10-75 4-79 Compl.

8245 8335 Install Reactor Clean-Up System Pipe, Fittings & Valves (260-6540,6640) 2-76 10-78 Compl.

{

8270 8360 Install RHR Pipe, Fittings and Valves (2646-6540) 10-75 10-78 Compi.

8275 8470 Install Cooling Water Pipes and Controls (2621) (WS SYS) 11-72 1-81 Compl.

i 11-75 3-81 Compl.

I C280 8605 Install Radioactive Waste System and Radiation Monitoring System (2682)(2686)(2683)(2387)(2685) 3300 8450 Install Piping Conne'cted to Primary System Components (2640) 10-75 5-79 Compi.

8305 8475 Install Pipe Hangers and Restraints All Systems (XXXX-6550,6450,6650,6750,2213.3910) 3-75 6-8 2Est.

92%

8310 8315 Install Main Steam Pipe to Turbine Stop Valve (2631) L8 Pipe 4-75 5-1-77 Compi.

l 12-76 6-81 Compl.

8450 8500 Initial Flush of Systems (XXXX,6890) 8500 8515 Perfom Reactor Cold Hydrostatic Test 5-78 7-78 Compl.

3-78 7-8 2 Est.

95%

l 8515 8600 Complete Base Line Inspections CG&E t.

9 9

t

?

4

~

rate $

e Activity Activity Est. i ~

I-J Numbers (Description & Account Numbers)

- Sta rtsd

'Cortpletw -

Statu 8500 8100 Perform Leak Rate Test CG&E 3-32 Est.

5-T Est.

0%

6-82 Est.

6-82 Est.

0:

8605 8615 Test Radioactive System and Radiation Monitoring System 5-82 Est.

5-82 Est.

0%

8700 8800 Integrated System Test 8-79 9-79 Comp 1.

8740 8815 Special Nuclear Material Delivered 7-82 Est.

7-82 Est.

0%

8800 8950 Applicant Submits Test Results 7-82 Est.

11-82 Est.

0%

8950 8990 Power Ascension i

-l e

1 I

" - - ~ <