Revised Final Deficiency Rept Re Power Cables Not Qualified to IEEE 383-1974 Flame Test,Initially Reported 800918. Completion Date for Corrective Actions Now Scheduled for 820407
ML20040D017
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 01/06/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8201290484
Download: ML20040D017 (2)


Text

..-

u....o r

TENNEQSEE VALLEY AUTMORITY

'$IETA OQ 3,fENNE6 GEE 374ol 400 Chestnut Street Tower II 32 JbN ll all

  • IOJanuary 6,1982 4 ' 'N D

Mr. James P. O'Reilly, Director

(

igg O

Office of Inspection and Enforcewent U.S. Nuclear Regulatory Commission gT J/ly g 7I982 A -Q Region II - Suite 3100 s e Q

101 Marietta Street Atlanta, Georgia 30303

/

/

4 N

Dear Mr. O'Reilly:

y BELLEFC!CS NUCLEAR PLANT UNITS 1 AND 2 - POWER CABLES.NOT QUALIFIED TO IEEE 383-1974 FLAME TEST - NCR BLN EB f/kO4 - REVISED FINAL REPORT

~

On August 19, 1980, F. S. Cantrell, NRC-0IE Re'gion II, was informed that the subject nonconformance was determined to be reportable in accordance with 10 CFR 50.55(e). This was followed by our interit.rreports dated September 18 and December 10, 1980 and olic final report dated March 23,.

1981. As discussed with R. V. Crlenjak by telephone on December 21, 1981, enclosed is our revised final report. The reason for the revision is tio change the expected completion date of the corrective action. The'date for completion has been-delayed because the subject cables ree providing power to support construction activity until the unit 2 13.8 kV switchgear is-energized. When the 13.8 kV switchgear is energi::ed, the" subject cables will be removed. The corrective action on this matter will be completed by April 7, 1982.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, ager Nuclear Regulation and Safety Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement i

U.S. Nuclear Regulatory Commission Washington, DC 20555 l

~

W 8201290494 820106 PDR ADOCK 05000439 l

S PDR

.I

[#

g g

An Equal Opportunity mployer

~

ENCIDSURE DELLEEDITE NUCLEAR PIR7f UNITS 1 AND 2

'PGiER CABLES NCTP QUALIFIED '10 IEEE 383-1974 FIME TEST NCR BLN EEB 8004 10 CFR 50.55(e)

REVISED FINAL REPORT._.

s Description of Deficiency The 600-V and 8-arx215-kV power cables, types CPJ and CPSJ, which have been installed in cable trays at Bellefonte Nuclear Plant are not qualified to the flame test requirements of IEEE 383-1974..These cables were purchased before TVA's commitment to IEEE 383-1974 and were mistakenly l

installed in cable trays.

Safety IImlications, Cables in cabl'e trays are requirst to meet the IEEE 383-1974 flame test to help control the spread of fires in cable trays. Failure of the cables to meet the flame test could lead to cpread of the fire beyond limits for which the plant was designed. The subject condition, had it remained uncorrected, could have affected adversely the safe operation of the plant.

, Correct'ive tction All cable of this type has been identified and will be ranoved frcm cable trays in safety-rehtei areas. '1he replacement cables will be qualified to IEEE 383-1974. The replacement of this cable is presently in progress, with the changeout to be completed by April 7, 1982.

The cable types reflected in this NCR have been " written" out of the cable routing program at Bellefonte. Since al1 cafety-related cable at Bellefonte is routed by ccn:puter, this type of cable is essentially removed frcm the Bellefonte " stores" for cable trays. Cables installed in conduit will nct necessarily be removod, as the conduit itself will prevent flame spread.