Responds to 811229 Request for Comments on Strategy to Coordinate Requirements & Guidance for Safety Parameter Display Sys,Reg Guide 1.97 & Reg Guide 1.23 Re Emergency Response Facilities.Detailed Comments to Be Proposed 820111
ML20040C514
Person / Time
Issue date: 01/05/1982
From: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20040C507 List:
References
NUDOCS 8201280031
Download: ML20040C514 (2)


Text

,

4*

E I

UNITED STATES

{

[pse NUCLEAR REGULATORY cOMMisslON

{

o wassincrow. o. c. aossa i

[

7, i.

k,,46.* [!

January 5, 1982 l

I

~

4 MEMORANDUM FOR: Victor Stello,' Jr., DeputyiExecutive Director:

i c i-Regionai Operations and Generic Requirements ii

ii j

i FROM:

Richard C. DeYoung. Dimetor i.

l' a.h h.i u

2 Office of Inspection and Enforcement N

SUBJECT:

CRGR REQUIREMENT COORDINATION This is in response to your memorandum dated December. 29,1981 which requested i

(by January 5,1982) comments on a strategy to coordinate requirementsrand! 2.~

.a i

guidance far' the:SPDS, Regulatory Guide 1497 and Regulatory Guidesl.23:withm those'for emergency response. facilities and to negotiate case by case datesi:

l for. completion of these items. We will provide detailed coments by...i 4:

{

January,11, 1982 on these proposals.

i I

In th~e interim, we have a few general thoughts.

i 1

1.

The paper could be read to create a new type of requirement.' If this is.the intent, the relationship to Comission regulations.should be well >

' J:

i thought out in tenns of whether a similar pmcess to rulemaking is a:':H -

appropriate for approval.which allows coordination by offices within' :r

'.3 the agency and consideration by the Commission with input from the " :it 4

H industry and the interested public.

a

.}

i'.;'

2.

Some of the. list of " requirements" attached to your memorandum appear to

.be changes to specific items contained as acceptable positions in r Regulatory Guides or in documents'which have been approved by the r 'N!i

  • in 1 '

Comission for use in the same manner as Regulatory Guides.: Simultaneous a 1.. :

i changes to these guides should be considered to avoid confusion. Some:

i

.5 1."

i

" requirements" might be better stated as changes to acceptable positions !

-in these guides.

l 3.

The Division of Emergency Preparedness is examining the substance of it i

'the proposed changes to current guidance and;Will' provide coments by

.I r

January 11,1982 as discus' sed above. We note that the guidance in the i

i area of emergency planning and response facilities were extensively l

coordinated and discussed within the staff, with the Comission, with.

[

t :'

the nuclear industryind with the public through :neetings, workshops l

and coment' periods before issuance of NUREG-0654 and HUREG-0696.

(

l 8201280031 820112 PDR REVGP NRCCRGR PDR s.

=

--n

t j

i Victor Stello, Jr. ' January 5,1982 a

4.

We agree with your efforts to expedite. installation of the SPDS andiWe;

.] ;,,..., j ;,I i

recently forwarded a rule change which we.think serves this purpose.,..

c 5; Wd agree w'ith.'the idea of: setting dates on a Plant by plant.basjs pr,9vjdedi ip i

i

.+,; :i;.

. ir, :, 4, i i

i ; }

the negotiated dates.can be kept within reason.

,n 61 We should think through the implications of changiiig' existing guidance ; i.3 i,

and assure that the result' of our current efforts is a reduction..in:a..d i i.

p -i 4

uncertainty on the part of the. industry. n....c i.,

.,3 i

l tl

' ~.

1

.dchardC.DeYoung. Die r

-(Office of Inspection nd Enforcement -

6-cc:

R. Hinogue H. Denton E. Jordan i

e j

i

(

t i

[