Forwards Summaries of Agenda Items for Committee for Review of Generic Requirements 820113 Meeting
ML20040C506
Person / Time
Issue date: 01/12/1982
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Eisenhut D, Jordan E, Mausshardt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation
Shared Package
ML20040C507 List:
References
SECY-81-504, NUDOCS 8201280017
Download: ML20040C506 (4)


Text

n f

9 C

4 8

C&l JAN 121982 C

d4N EO j

~

b

[

9 4

s MEMDRANDUM FOR: Darrell Eisenhut, NRR Edward L. Jordan, IE Donald B. Mausshardt, NMSS Robert Bernero, RES Clemens J. lieltemes, Jr., AEOD Joseph Scinto, ELD FROM:

Victor Stello, Jr., Deputy Executive Director Regional Operations and Generic Requirements

SUBJECT:

BACKGROUND INFORMATION FOR JANUARY 13, 1982 CRGR MEETING Enclosed are sunnaries of agenda itams in a new format adopted by the DEDROGR staff.

Origi:231 signed by yiotog Stelle,#

Victor Stello, Jr.

Deputy Executive Director Regional Operations and Generic Requirements

Enclosures:

Summaries Distribution VStello TEMurley Schwink DEDROGR cf Central File PDR(NRG/CRGR) s I

l 0

d

$$1go17ehhhdp

  • " ' " >....... DE OGR..

~...

..~

. ~. -

~

g.~

.~~

P NR s->

..vS n.0 d..

PDR

">...1/.11.l. 2 NRC FORM 318 (10-80) NRCM O240 OFFICIAL RECORD COPY l

o

SUMMARY

OF ITEMS.T0 BE ADDRESSED BY CRGR j

AGENDA ITEM #1 (STH ftEETING, 1/13/82) l IDErlTIFICATION:

Regulatory Guide 1.68.3 l

DESCRIPTION:

Preoperational Testing of Instrument Air and Control Air Systems (Applies to all air systems that supply) air to loads that are

.l important to safety.

OBJECTIVE:

Sets forth Guidance on testing methods acceptable to NRC staff for OL's i.e.

o Preoperational testing for instrument and control air systems to demonstrate operability 4

for service and the response or interactions resulting from simulated loss of air and air overpressure transients.

j o Testing to be conducted to terify air system performance after major modification and repair or where the systems may have been subjected to l

contamination.

BACKGROUND:

o R.G. 1.68.3 is intended to update and replace R.G.1.80 that covered only the instrument air systems.

o R.G. 1.68.3 is expanded in scope beyond R.G.

l.80 and now includes (1) testing of control air and the instrument air systems, (2) additional tasts to simulate the loss of air

~

and air overpressure transients.

o R.G.1.6.3 deletes several of the positions previously in.R.G. 1.80 that experience showed to be impractical.

l BASIS:

10CFR50 1.e.

o GDCr#1, Quality Standards and Records, Appendix l

~'

.A.

o Criterion XI, Test Control, Appendix B.

o Could be issued in about 1 month with CRGR concurrence (DEDR0GR staff est.)

o Is not being used by staff in latest SRP -

Referenced in Section 9.3.1 (July 1981).

o Has been in preparation and concurrence chain for nearly 3 years.

CONTACT:

Spokesman:

EdWenzinger(35900)

Sponsor:

R. Minogue, Dir. Res.

KEY ISSUES U A.

TECHNICAL l.

Need for additional testing as called for in Position #11 may be the most costly aspect in R.G.1.68.3.

Its implementation may require special test equipment. -The je 4

need and net benefits of this position is U

not clear to the DEDR0GR staff.

E Identified by DEDR0GR Staff Review.

a.

2.

Preoperational testing of the type specified in R.G.1.68.3 will not necessarily be of large benefit'to the types of air system failurs actually b'eing experienced when plants are in operation.

(See NRR Technical Assistance Work: ORNL/NSIC - Draft, Nov. 13, 1981, Compressed - Air and Backup Nitrogen Systems, NRC FIN No.

]

B0755.)

j 3.

It is unclear that position #10 will yield significant benefits or realistic results unless large air loads are actually to be tested under intended plant operations as opposed to startup conditions.

B.

COSTS:

Total cost implications of R.G.1.68.3 are not specified but these could easily fall into 75K to 150K rarge. The

(

Safety benefits relative to these costs are unclear.

C.

IMPLEMENTATION:

The extent to which all of the R.G.

i 1.68.3. preoperational testing would be j

expected to apply when the plant is in operation following major repair to air systems is unclear.

RECOMMENDATIONS / COMMENTS TO CRGR Approve issurance to R.G. 1.68.3 for 0.L. use subject'to a satisfactory resolution of the above issues being demonstrated to CRGR.

l h

o

SUMMARY

OF EMERGENCY RESPONSE 1.

Identification: - Emergency Response Capability and Facilities Basic. Requirements 2.

==

Description:==

- Proposed basic requirements in memo from Chairman, CRGR, to Office Directors dtd December 29, 1981.

3.

_0bfective:

Discuss program office comments and agree on content of recommendation to EDO.

4.

Background:

- CRGR meetings of December 3, 10, 1981; DEDROGR memo of December 29, 1981; Note to V. Stello from J. Scinto of December 28, 1981; and program office comments.

5.

Basis: - Identified need to define basic requirements and to control use of NUREG documents 6.

Timetable : - At CRGR meeting on January 13, 1982, finalize content of ED0 recommendation.

7.

Contact:

- E. B. Blackwood, DEDROGR, ext. 24359.

8.

Issues: - Content of bas'ic requirements and use of NUREGs listed in December 29,1981 memo.

9.

Recommendations: - Resolve comments received from program offices and finalize recommendation to EDO.