ML20040C348
| ML20040C348 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/24/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20040C340 | List: |
| References | |
| NUDOCS 8201270556 | |
| Download: ML20040C348 (2) | |
See also: IR 05000348/1981025
Text
,
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
,
.
NOV 2 41981
Alabama Power Company
ATTN:
Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen;
Report Nos C-348/81-25 jnd 50-364/81-28
w
Subject:
40
This refers to the routine safety inspection conducted by Mr. B. R. Crowley of
this office on October 26-28 and November 3-6, 1981, of activities authorized by
NRC License Nos. NPF-2 and NPF-8 for the Farley facility.
Our preliminary
findings were discussed with Mr
J. A. Woodard, Assistant Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Aopendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any r,uestions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Sf
Paul J. Eellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
See Page 2
8201270556 820118
PDR ADOCK 05000
G
m
m
<
t
.
Alabama Power Company
2
NOV 2 41981
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-348/81-25
and 50-364/81-28
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
O. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Peview
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Alabama
9
I
R
rib g
RII
RII
RII
O
$
i~
'1"
8 Crowley:ht
ARHerdt
CEMurdhy
JRogge
PJK
ogg
11(70/81
11/;p\\/81
11/2V/81
11/b/ /81
11/79/81