Forwards IE Insp Repts 50-348/81-25 & 50-364/81-28 on 811026-28 & 1103-06 & Notice of Violation
ML20040C348
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/24/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20040C340 List:
References
NUDOCS 8201270556
Download: ML20040C348 (2)


See also: IR 05000348/1981025

Text

,

_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

,

.

NOV 2 41981

Alabama Power Company

ATTN:

Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen;

Report Nos C-348/81-25 jnd 50-364/81-28

w

Subject:

40

This refers to the routine safety inspection conducted by Mr. B. R. Crowley of

this office on October 26-28 and November 3-6, 1981, of activities authorized by

NRC License Nos. NPF-2 and NPF-8 for the Farley facility.

Our preliminary

findings were discussed with Mr

J. A. Woodard, Assistant Plant Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Aopendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any r,uestions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Sf

Paul J. Eellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

See Page 2

8201270556 820118

PDR ADOCK 05000

G

m

m

<

t

.

Alabama Power Company

2

NOV 2 41981

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-348/81-25

and 50-364/81-28

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Peview

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

9

I

R

rib g

RII

RII

RII

O

$

i~

'1"

8 Crowley:ht

ARHerdt

CEMurdhy

JRogge

PJK

ogg

11(70/81

11/;p\\/81

11/2V/81

11/b/ /81

11/79/81