Forwards Request for Addl Info for Review of IE Bulletin 80-11 Re Masonry Wall Design.Response Requested within 45 Days
ML20040C303
Person / Time
Site: Pilgrim
Issue date: 01/07/1982
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Morisi A
BOSTON EDISON CO.
References
REF-SSINS-6820 IEB-80-11, NUDOCS 8201270506
Download: ML20040C303 (4)


Text

n q%

h g

?

+

~

DISTRIBUTI0ft:

MSIC ACRS-10 Docket File ORB #A2Rdg Gray File NRC PDR DEisenhut Kleu L PDR KEccleston TERA Silorris Docket flo. 50-293 34g 7 1981 IE-3 g'fydJ.Er ifr. A. Victor 11orisi, ifanager

!!uclear Operations Support Department p

v g

Boston Edison Company 5~

p#,

%" [S It/C fluclear O/o 800 Boylston Street Coston, Itassachusetts 02199

(

]['

Dear !1r. fforisi:

\\

Ue are continuinq our review of your response to IE Bulletin 80-11 p

N concerning masonry wall design and have identified the need for additional information.

~,

Accordingly,'please provide the information identified in Enclosure 1 within 45 days of receipt of this letter.

O!8 clearance is not required for this request since it is being transnitted to nine or fewer addressees.

Please contact your flRC Project ihnager should you have any questions.

Sincerely.

Thocas A. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

Sumarized List of l

Questions cc w/ enclosure:

See next page

{,,cfs

,,p f

, },,

No@o

],],,,',',,,, ]

2 s

3 ou ur>

PDR

..1J..)./.../.81).. i 12/. 6..../. 81....

. 12f...;../. 8k.......

7..

anc ronu ais oow ancu cuo OFFICIAL RECORD COPY usom ini-mm

?

/

Mr. A. Victor Morisi Boston Edison Company cc:

Mr. Richard D. Machon Pilgrim Station Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Henry Herrmann, Esquire

~

Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360 Resident Inspector c/o U. S. NRC P. O. Box 867 Plymouth, Massachusetts 02360 Ms. JoAnn Shatwell Office of the Attorney General Environmental Protection Division 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Ronald C. Haynes Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 i

O I

Summariztd List of Quastions (Based on the Review of Pilgrim Unit 1 [1])

1.

With respect to the equivalent static analysis, the Licensee should provide justification for the use of the amplification factor of 1.3 to account for multi-mode effects.

2.

With regard to the availability of the amplified response spectra, the Licensee stated that "if no ARS is available, earthquake loads may be evaluated based on a rigid range acceleration value as determined by the original building seismic analysis.

In this case the wall must be shown to have a fundamental frequency greater than the rigid range cutoff frequency value." The Licensee should indicate how the rigid range acceleration and cutoff frequency could be determined.

3.

For the permissible strain of non' shear walls, the Licensee should provide the technical basis for using 0.1% and 0.01% for confined and

' unconfined walls, respectively.

4. [1] provided the design criteria for reinforced masonry,

walls for Pilgrim Unit 1.

The Licensee should also provide the design criteria for unreinforced masonry walls.

5.

With respect to the non-linear behavior analysis of masonry structures, it would be advisable not to resort to this approach, if possible.

However, if the Licensee chooses to adopt this approach, conclusive evidence muct be submitted.

o 6.

With respect to the special inspection category of stress values, the Licensee should indicate if the construction practice for the masonry structures at Pilgrim Unit 1 was in conformance with the provisions specified for the special inspection category in ACI 531-79.

7.

For tension normal to bed joints, an increase of 50% over'the allowable value for normal loads was assigned to-factored loads. However, the SEB criteria [2] allow only up to 30%.

The Licensee should identify literature references or test data to support the use of a factor of 1.5.

8.

In Exhibit G of Attachment 3 [1], for factored loads, a factor of 1.5 was ~

introduced for allowabic shear with no special reinforcement (both in-plane and out-of-plane). SEB criteria [2) suggest a factor of 1.3.

The Licensee should cite literature references or test data to support the use of a factor of 1.5.

In addition, the informati.on identified in Items 9 through 12 should be provided:

9.

Appendices C, H, I, and J of Attachment 2 to Ref erence l' 10.

Results of analyses for tornado, pipe break outside containment (PBOC) loadings, and thermal effects r,eport of the final reevaluation mentioned in Reference 1 11.

The 12.

Information on both the method and schedule of any planned modifications nklin Research Center A Dwin.an of The Frwehn henwie

p REFERENCES 1.

A. V. Morisi (Manager, Nuclear Operations Support Department, Boston Edison Company.

Letter with attachments to B. H. Grier (NRC)

March.18, 1981 2.

Standard Review Plan, Section 2.8.4, Appendix A

" Interim Criteria for Safety-Related Masonry Wall Evaluation" NRC, July 1981 s

i t

6 S

4 i

i i

f S

4 e

{

nklin Research Center

-