Text
.-_ -
.
_
.
.
-
.
.
.
YELLOW-
.
,
,
,
i
Nny
4 1981
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
-
Executive Vice President
.270 Peachtree Street-
Atlanta, GA 30303
!
Gentlemen:
Subject: Report Nos:c5_UU21/81-2 Dad 50-366/81-24
'
This. refers to the routine safety inspection conducted by Mr. A. L. Cunningham of
this office on September 28 - October 6,1981, of activities authorized by NRC
Operating License Nos. DPR-57 and NPF-5 for the Hatch facility. Our preliminary
findings were discussed with Mr. R. W. Staf fa, Manager, Quality Assurance
Division at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from -
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
,
-of fice by telephone within ten days from the date of this letter of your
j
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
1
i
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due 'date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
'
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the in formation should be withheld from public
- disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be.placed in the Public Document
Room.
8201270335 820112
PDR ADOCK 05000321
0
.--
- . . - .
. .
--
- - -
- -
.
_
-. -
- - - - .
-
- - - -
.
_
.
.
4 1981
Georgia Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
2"awdf
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
En-losures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/81-24
and 50-366/81-24
cc w/ encl:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
bcc w/ encl:
NRC Resident Inspector
Hugh S. Jordan, Executive Secretary
Document Management Branch
State of Georgia
'
RII h
RII
A
RII
RII
RII
/
\\/
Qh
.
ALCur.ningham:ejw \\ltMMo gomery
VL rownlee
JPS~, h r
PJKellogg
11/.7/81
(11/f/81
11/q /81
11q/81
11/4 /81