. Docket Eile,-
GMazetis DEC 311981 LB#1 Rdg DEisenhut bec:
BJYoungblood TERA JHopkins NRC/PDR Docket No.: STN 50-482 MRushbrook L/PDR SHanauer NSIC RVollmer TIC ACRS (16)
Mr. Glenn L. Koester TMurley Vice President - Nuclear RMattson f67',h Kansas Gas and Electric Company RHartfield, MPA 201 North Market Street 0 ELD
/- '
' U,'y M
Wichita, Kansas 67201 OIE (3)
/
k ts SDiab i
E' g;g2a, %
Dear Mr. Koester:
WJensen i
-v pj
[40/
Subject:
Request for Additional Information for the Review of the Wolf Creek Plant, Unit 1 Regarding Reactor Systems
\\x
.a fI ;,
As a result of our continuing review of the Wolf Creek Plant, Unit 1 FNAR;"
we find that we need additional information to complete our evaluation. The specific information required is in the area of reactor systems and is 4
presented in the Enclosure.
To maintain cur licensing review schedule for the Wo1f Creek Plant FSAR, we will need responses to the enclosed request by February 4,1982.
If you cannot meet this date, please inform us within seven days after receipt of this letter of the date you plan to submit your responses so that we may review our schedule for any necessary changes.
Please contant Jon Hopkins, Wolf Creek Licensing Project Manager, if you 4
i desire any discussion or clarification of the enclosed request.
Sincerely,
~ "Itihnod by r 5.J.Youngbleod B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing l
Enclosure:
As stated cc: See next page Nhe reporting and/or recordkeeping
{
hequiretacnts contained in this letter
, affect fcrer than ton respondento :
,thereforo, OMB clearanco is not required underr P.L.96-511.
- ouw ou
... -- - n,
omer) 8201270094 811231.....
Jggp};ing/
30.y
.QQt t
swNAME) t POR
,,y
,..f.g../. 81..
12/ /81
.......... b A D O C K 05000482 g
. -- ~ """""
i PDR OFFICal. RECORD Cur i usomS8 +"*
snc ronu at8 00-8ol ""C" 2'
.i Mr. Glenn L. Koester Vice President - Nuclear Kansas Gas and Electric Company 201 North Market Street Post Office Box 208
-Wichita, Kansas 67201 cc: Mr. Nicholas A. Petrick Ms. Wanda Christy Executive Director, SNUPPS 515 N. 1st Street 5 Choke Cherry Road Burlington, Kansas 66839 Rockville, Maryland 20750 Eric A. Eisen, Esq.
Mr. Jay Silberg, Esquire Birch, Horton, Bittner & Moore Shaw, Pittman, Potts & Trowbridge 1140 Connecticut Avenue, N. W.
1800 M Street, N. W.
Washington, D. C.
20036 Washington, D. C.
20036 Kansans for Sensible Energy Mr. Donald T. McPhee Post Office Box 3192 Vice President - Production Wichita, Kansas 67201 Kansas City Power and Light Company 1330 Baltimore Avenue Post Office Box 679 Kansas City, Missouri 64141 Ms. Mary Ellen Salva Route 1, Box 56 Burlington, Kansas 66839 A. Scott Cauger, Esq.
Assistant General Counsel Public Service Commission P. O. Box 360 Jefferson City, Missouri 65102 Mr. Tom Vandel Resident Inspector / Wolf Creek NPS c/o U.S.N.R.C.
Post Office Box 311 Burlington, Kansas 66839 Mr. Michael C. Kenner Wolf Creek Project Director State Corporation Commission State of Kansas Fourth Floor, State Office Bldg.
Topeka, Kansas 66612 9
r REQUEST FOR ADDITIONAL INFORMATION LOCKED REACTOR COOLANT PUMP ANALYSIS-440.0WC Reactor Systems Branch
~
L..
440.3WC The analyses of a locked reactor coolant pump rotor and a sheared reactor coolant pump shaft in the FSAR assumes the availability of offsite power throughout'the event.
In accordance with Standard Review Plan'15.3.3 and GDC 17, we require that this event be analyzed assuming turbine trip and coincident loss of offsite power to the undamaged pumps.
Appropriate delay times may be assumed for loss of offsite power if suitably justified.
~
Steam' generator tube leakage should be assumed at the rates specified in the Tech-
. nical Specifications.
The event snould also be analyzed assuming the worst single failure of a safety.
system active component.
Maximum technical specification primary system activity and steam generator tube leakage should be assumed. The analyses should demon-strate that offsite doses are less than the 10 CFR 100 guidelines values.
w