ML20040B575
| ML20040B575 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 01/13/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gilberts D NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20040B576 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8201260206 | |
| Download: ML20040B575 (2) | |
See also: IR 05000282/1981024
Text
/
<
,
JM i3 T,
[c, M Nll1%
9
,
Docket No. 50-282
O
- '
Docket No. 50-306
Northern States Power Company
/
ATIN:
Mr. Dennis E. Gilberts
!
_
W
b lF
'
- s
Senior Vice President
!
T
'
Power Supply
414 Nicollet Fall
Minneapolis, MN 55401
Gentlemen:
This refers to the routine safety inspection conducted by Mr. M. M. Holzmer of
this of fice on December 14-18, 1981, of activities at Prairie Island Nuclear
Generating Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-42
and No. DPR-60 and to the discussion of our findings with Mr. F. P. Tierney at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. E thin these a reas , the inspection consisted of a selective
examination of procedures end representative records, observations, and in-
terviews with personnel.
l
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or af firmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must.
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statemer.t of the reasons which are the bases for the
8201260206 820113
l@[
PDR A90CK 05000282
G
S
//
- - -
-
. __
.
_
---.
.
_ _ _ -
,
JAN 13 ~n2
Northern States Power
-2-
i
Company
claim that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
,
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear f rom you in this regard within the spccified
periods noted above, a copy of this letter, the enclosures, and your response
to this letter will be placed in the Public Document Room.
We will glacly discuss any questions you have concerning this inspection.
Sincerely,
.
.
'-
-
-
,
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-282/81-24 and
No. 50-306/81-26
cc w/encls:
F. P. Tierney, Jr. , Plant flanager
Dt!B/ Document Control Desk (FIDS)
Resident Inspector, RIII
John W. Ferman
Ph.D. , Nuclear
Engineer, f1P( A
Rlll
RlII
RII
RIII
RIII
ybh
bj W
Qg
llo)lzmer/so
C
s
U }\\
fd)sctel
Li 11e
Williams
T'us
l
1/5/82
f/
'
'
de