Forwards IE Insp Repts 50-282/81-24 & 50-306/81-26 on 811214-18 & Notice of Violation
ML20040B575
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/13/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML20040B576 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8201260206
Download: ML20040B575 (2)


See also: IR 05000282/1981024

Text

/

<

,

JM i3 T,

[c, M Nll1%

9

,

Docket No. 50-282

O

'

Docket No. 50-306

Northern States Power Company

/

ATIN:

Mr. Dennis E. Gilberts

!

_

W

b lF

'

s

Senior Vice President

!

T

'

Power Supply

414 Nicollet Fall

Minneapolis, MN 55401

Gentlemen:

This refers to the routine safety inspection conducted by Mr. M. M. Holzmer of

this of fice on December 14-18, 1981, of activities at Prairie Island Nuclear

Generating Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-42

and No. DPR-60 and to the discussion of our findings with Mr. F. P. Tierney at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. E thin these a reas , the inspection consisted of a selective

examination of procedures end representative records, observations, and in-

terviews with personnel.

l

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or af firmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must.

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statemer.t of the reasons which are the bases for the

8201260206 820113

l@[

PDR A90CK 05000282

G

PDR

S

//

- - -

-

. __

.

_

---.

.

_ _ _ -

,

JAN 13 ~n2

Northern States Power

-2-

i

Company

claim that the information should be withheld from public disclosure.

This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

,

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear f rom you in this regard within the spccified

periods noted above, a copy of this letter, the enclosures, and your response

to this letter will be placed in the Public Document Room.

We will glacly discuss any questions you have concerning this inspection.

Sincerely,

.

.

'-

-

-

,

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Reports

No. 50-282/81-24 and

No. 50-306/81-26

cc w/encls:

F. P. Tierney, Jr. , Plant flanager

Dt!B/ Document Control Desk (FIDS)

Resident Inspector, RIII

John W. Ferman

Ph.D. , Nuclear

Engineer, f1P( A

Rlll

RlII

RII

RIII

RIII

ybh

bj W

Qg

llo)lzmer/so

C

s

U }\\

fd)sctel

Li 11e

Williams

T'us

l

1/5/82

f/

'

'

de