ML20040B310
| ML20040B310 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/08/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20040B311 | List: |
| References | |
| NUDOCS 8201250380 | |
| Download: ML20040B310 (2) | |
See also: IR 05000423/1981014
Text
_.
_.-__.
_
._
-
_
_
.--
._
_
_
.
.
j
-
.
4
1
i
8 JAN 1532
Q
,
. . p.m ,
,
Docket No. 50-423
g/
- g
'
.
p,gCEit:a3
JAN 2 0gp ;3
Northeast Nuclear Encrgy Company
2
ATTN: Mr. W. G. Counsil
-
_
Senior Vice President - Nuclear
& ugagg$7'
,
Engineering and Operations Group
w
,
P. O. Box 270
%
Hartford, Connecticut 06101
y
,
Gentlemen:
Subject:
Inspection 50-423/81-14
This refers to the routine safety inspection conducted by Mr. J. Mattia of this office
.
on October 30 - November 30, 1981, at the Millstone Nuclear Power Station, Unit 3,
Waterford, Connecticut, of activities authorized by NRC License No. CPPR-113 and to
!
the discussions of our findings held by Mr. Mattia with Mr. S. Toth and others of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection and
Enforcement Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Dased on the results of this inspectior., it appears that two of yGur activities were
not condv;ted in full compliance with HRC requirements, as set forth in the Notice
of Violation, enclosed herewith as Appendix A.
These items of noncompliance have
been categorized into the levels described in the Federal Register Notice (45 FR 66754) dated October 7, 1980. You are required to respond to this letter and in pre-
,
'
paring your response, you should follow the instructions in A pendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will be
i
placed in the NRC Public Document Room unless you notify this office, by telephone,
.
'
within ten days of the date of this letter and submit written application to with-
hold information contained therein within thirty days of the date of this letter.
'
Such application must be consistent with the requirements of 2.790(b)(1).
Your cooperation with us in this matter is appreciated.
Sincerely,
,
,
orin
' ma Py:
820125038082010jg
Richard W. Starostecki, Director
PDR ADOCK OS000PDR
Division of Resident and Project
.
G
Inspection
-ge /
>l. . R I, ; DR P.I. .
, .RI;DRPI
!RI.:DR(1.c
.
.
..
5(
'
.
.
l
wm >. Mattia/clcI E sasser
Brunner
.4
'
!
. IL 9 '.d
- >
1
.
.
.
l sirc dins aui oo oohncu ano
-- .
' '
- .
-.
- R EC O R D
C O
P.- Y
-,
.
- - - - -
- - - _ - - - - - - - -
-
OFFICIAL
._.
_
-
. _ _ _ _ _ _ _ _ _ _
___
-
'
'
z
g
,
. . , ,
,
3
a'
o
y..,
,
__
g
o
y
.
+
6'
g jj\\M 193Z
Northeast Nuclear Energy Company
2
Enclosures:
1.
Appendix A. Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-423/81-14
cc w/encls:
K. W. Gray, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat, Manager, Generation Facilities Licensing
D. G. Diedrick, Manager of Quality Assurance
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/encls:
Region I Docket Room (w/ concurrences)
Chief, Operational Support Section(w/o encis)
o,,ia )
"
'
'
'
'
'
'
' ' '
summ >
,
, , ,
,
,
,
, ,
,
OATEk
.
..
.
..
.
.. . .
.. .
.
.
.
.
nce ronu ma no so, nacn c240
OFFICIAL RECORD COPY
= "*-as s{