ML20040A555
| ML20040A555 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/05/1982 |
| From: | Culver N FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20040A553 | List: |
| References | |
| NUDOCS 8201210239 | |
| Download: ML20040A555 (4) | |
Text
-.
1 OPERATING DATA REPORT DOCKET NO.
50-302 DATE 1/5/82 COh!PLETED BY Mu culver
)
TELEPHONE.19041 795-6486 OPERATING STATUS i
Notes
- 1. Unit Name:
crue n t River Unit 3
- 2. Reporting Period:
12/1/81 - 12/31/81
- 3. Licensed Thermal Power (51Wt):
7544
- 4. Nameplate Rating (Gross 51We):
890
- 5. Design Electrical Rating (Net 31We):
825
- 6. 51asimum Dependable Capacity (Gross 51We):
R?1
- 7. Sf aximum Dependable Capacity (Net 31We):
782 S. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
li3 - From 2452 to 2544 because of power level upgrade.
- 6 and #7 will be changed after operational data at this level has been gathered.
- 9. Power Lesel To Which Restricted. If Any (Net 51Wel:
Nona
- 10. Reasons For Restrictions,l.f Any:
N/A This hionth Yr. to-Date Cumulatise
- 11. Hours in Reporting Period 744 8760_
42120
- 12. Number Of Hours Reactor Was Critical 485.83 5564.88 25449.39
- 13. Reactor Resene Shutdown Hours 0
80.0 1209.22 1
- 14. Hours Generator On.Line 423.7 5446.8 24812.18
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (51WH) 905638 2083927 55366941 17 Gross Electrical Energy Generated (SIWH) 311171 4295660 18799591 lb. Net Electrical Energy Generated (51WH) 294859 4083728 17829298
- 19. Unit Senice Factor 56.9%
62.2%
58.9%
- 20. Unit Asailability Factor 56.9%
62.2%
58.9%
- 21. Unit Capacity Factor (Using 51DC Net) 50.7%
59.6%
54.1%
- 22. Umt Capacity Factor (U>ing DER Net) 48.0%
56.5%
51.3%
- 23. Unit F or ed Outage Rate 6.6%
16.6%
26.6%
- 24. Shutdowns Scheduled Oser Next 6 51onths (Type.Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Umts In Test Status tPrior to Commercial Operation).
Forecast Achies ed INITI A L CRITICALITY 1/14/77 INITi \\L ELECTRICITY 1/30/77 CO\\l\\lERCI AL OPER ATION 3/13/77 8201210 M i
,o
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE 1/5/82 COMPLETED BY M W-Culver TELEPHONE (904).795-6486 MONTH December 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL Of We-Net )
(Mwe.Ne:3 1
0 17 630 761 2
0 jg 3
0 19 819 4
0 70 844 832 5
0 7,
0 6
22
'10 1 7
0 23 588 0
827 8
74 9
0 25 837 0
526 10 26 0
II 27 575 12 0
835 33 254 13 29 838 14 296 30 nA3 302 i
15 31 835 16 541 INSTRUCTIONS j
j On this format. :st the.
.ih usut p.,u er lese: in ilm.Nei for each day in the reporting in inth. C. impute to the nearest wh >k mcy.,
i F1/77 I i
I 1
[.
s
...,,7...4-.~,---~.3
p ItNII SIftlil OWNS AND POWER RI DilrilONs DOCKEINO.40-302 UNII N AME FTrup t i
DA II.
4 /S/p?
j COMPLETED HY - M t.r c,,1 uo r Hl POR T ?.f 0 Nill 12/81 IELErilONE (904) 795-6486 i
l f7 l.!
5?
' i-dE I stenste pt, t
C.mw & rorreceive
- s.,
n*
i 5=
4
.3 :; a r.ze ni p
g ao,.,n in g
Repor: -
uN o'
Pecsent Returrence j
fE y
3 g =g u
w C
81-51 811201 S
290.23 C
1 N/A.
ZZ ZZZZZZ Continuation of scheduled refueling i
outage.
81-52 811222 F
17.6 A
3 N/A IA INSTRU While reducing power to take the turbine off-line, the pump power monitor tripped the unit when the 6900 volt buses were swapped.
i 81-53 811226 F
12.4 A
3 N/A IA INSTRU An upset in the electrical trans-mission system caused the pump power monitor to trip the unit.
I 2
3 4
I : Foried Reason -
Methmi:
Exhibit G - Instructions A li nipment Failure (Esplain)
- 1. Manual for Preparation of Data N Si hninic(I i
li Maintenance of Test 2.Mannal Scram.
Entry Sheets for 1.icensee U.itefucting -
'3. Automatic Scram.
Event Report II.1:R) File INtlRI G.
D. Regulatory Restriction 4-Ot her (lixplain) 0161) 1 Operator Training & Ucense 1% amination I' Administrative 5
G-Operational 1:r ror ( E xplain)
I'.shibit I - Same Source cr!77)
I! Other (1%plaini A
~
._,..=-,., -.
--,...-.........- ~. -. _.. -. =.
l MONTHLY OPERATIONAL
SUMMARY
STATDENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 1/8/82 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 MONTH December 1981
SUMMARY
STATDENT:
The Unit suffered two trips after returning to power from a refueling outage on December 13.
O D
e l
.