Slide Presentation Entitled Operating Reactor Events Meeting,810506
ML20040A278
Person / Time
Issue date: 12/21/1981
From:
NRC
To:
Shared Package
ML20040A275 List:
References
REF-10CFR9.7 NUDOCS 8201200683
Download: ML20040A278 (5)


Text

F VI4AGWUS~0 fiRR BACKUP 1 OPEPATif6 PEACTOR EVEffTS TETIf6 fMY6,1981 0 BEAVER VALLEY UNIT 1,IhY 2, 1981 PLAfR IRIP - EMERGENCY PREPAREDNESS PLAT 1 IMPLETENTED - UNUSUAL EVEf1T Pt0-I-81-59

- WHILE AT 1007. POVER, C0tOUCTING STEAM GENERATOR MOISTURE CARRYOVER TEST ifJG. 1 CURIE OF [h-24 TRACER IN FEEDWATER.

"A" SG FEED 1ATER REGULATING VALVE FAILED OPEff, REACTOR TRIP Oti HIGH SG "A" LEVEL.

- f40RFAL TRIP RESPONSE, EXCEPT STEAM DLt'P TO CONDEf4SER SEEMED SLUGGISH.

- SUSPECTED MAIN STLAM CODE SAFETY VALVE OPEN!fE.

- LICEf4SEE DECLARED UNUSUAL EVENT, EKRGENCY PREPAREDtFSS PLAN PARTI ALLY IMPLEMENTED FOR ONSITE AfD OFFSITE RADIOLOGICAL MONITORINF. NONE DETECTED.

- If6PECT10N FOLLOVit6 TRANSIENT IDENTIFIED FEEDWATER VALVE N

ATO PIPING SUPPORT DAMAGE.

x J

- IE FOLL34 LP.

O!O! Qgg $

g o

~,

.o M 0 FORT CALHOUN, APRIL 28,1981-PARTIAL LOSS OF D.C.

\\ g,.__I. 5[

- PARTIAL LOSS OF DC CAUSED LOSS OF LOAD TRIP, PARTIAL LOSS OF COPPONENT COOLING WATER AtO PARTIAL CONTAIN'ENT ISOLATION.

- LOSS OF DC CAUSED BY LOOSE WIRE IN FEEDER PANEL.

8201200683 811221 PDR 10CFR PT9.7 PDR

c.

1 l

2-OPERATOR SECURED RCP'S AFTER 4 MifUTES RUN T!K WITHOUT COMP 0fENT C00Lif1G WATER. PU4P VENDOR, BYR0f1 JACKSOff, REC 0ftENDS MAX.12 MifUTES AT 250 F.

- UNIT Of1 f4ATURAL CIRCULATION FOR 2 HOURS USING ATMOSPHERIC duffs.

ALL SYSTEMS APPEARED TO FlRJCTION NORf%LLY.

O MONTICELLO, APRIL 27,1981

- LOSS OF OFFSITE POWER, LOSS OF NORMAL DECAY HEAT REMOVAL DURING REFUELING OUTAGE.

THE '3" RHR LOOP OUT OF SERVICE FOR MAINTEfWJCE.

- IHE "A" RHR PLf4P BREAKER RACKED OUT VHl'_E ENERG1 ZED, CURRENT SURGE TRIPPED OTHER BREAKERS SUPPLIED BY SAME BUS AND THE OUTPLIT BREAKER FROM THE AUXILIARY TRANSFORE R.

A FIRE STARTED IN THE BREAKER CABINET.

0FFSITE PWER LOST FOR 10 MINUTES, HEAT UP OF REACTOR COOLANT 0.5 F PER HOUR.

FUEL POOL C00LIN3 SYSTEM WAS USED TO REFDVE DECAY HEAT FROM REACTOR CAVITY.

- 'lHE '3" RHR LOOP RETURNED TO SERVICE IN 8 HOURS.

f e.

' O BRUNSWICK UNIT 1, APRIL 25,1981

- LOSS OF f0Rt%L DECAY HEAT REMOVAL, COLD SHUTDOWN FOR MAINTENN4E OUTAGE.

ONE RHR LOOP OUT OF SERVICE FOR f%!NTEN#JE.

THE BAFFLE IN THE OPERATING ElR HEAT EXOiANGER FAILED, ALLOWItG C00LIfG WATER TO BYPASS THE TUBE BUNDLE.

- BAFFLE FAILURE CAUSED BY HIGH AP 15 PSI ACROSS THE HEAT EXCHANGER NORMAL OPERATING LP 1 PSI. HIGH AP CAUSED BY CLNis IN THE HEAT EXCHANGER.

DECAY HEAT REMOVED BY SPENT FUEL POOL COOLING SYSTEM.

HEAT EXCHN4GER REPAIRED NO RETURNED TO SERVIE IN 16 HOURS.

O BURNSWICK UNIT 2, PAY 5, 1981

- AT MIDNIGHT SHUTTING DOWN, 2 INOPERABLE M HEAT EXCHANGERS, DISPLACED BAFFLE IN OtE OF TWO HEAT EXCHANGERS, OfE IN SERVIE OPERATING AT REDUCED AP ACROSS U-TUBES.

AT 7:30 AM GROUP l ISOLATION (REACT (li TRIP Ato PSIV CLOSURE, USINGRCICFORDECAYHEATREMOVAL).

3 PREVIOUS BAFFLE FAILURES.

- }E FOLLOW UP.

l l

l l

y-

_q_

0 3 If4ADVERTEf1T SAFETY IfAJECTIONS INITIALED 3Y SEC0f0ARY SIDE

- SALEM UNIT 2, SHUTDOWN AND COOLING DOWN, Duff VALVE SETPOINT DRIFT - STEAM LINE LP Sl.

- SEQUOYAH UNIT 3, SHUTDOWN TESTING PSIV'S HIGH STEAM FLOW AfD LOIAVESI.

- SEQUOYAH UNIT 1 1007. GEfERATOR TRIP TEST PROBLEf1 TRAf4SFERRifiG RCP'S - STENi LINE - AP Sl.

O COOPER, APRIL 28,1981

- FAILED TURBINE BLADES, VIERATIONS EXPERIENCED IN LOW PRESSURE TUR31f4E.

- 3 Bl.ADES M1SSIfJG, SHROUD MlSSING FROM A GROUD OF 6 BLADES, NIfE BLADES HAVE BROKEN ROOTS.

- SAME TURBINE ROTOR WHICH WAS GIVEN TEMPORARY FIX IN fAROi 0F 1980.

l C PAlfE YANKEE, PAY 2,1981

- REACTOR C00LAtiT PLfiP SEALS FAILED.

- FA! LURE OF #2 AfD #3 SEALS.

- OPERATION CONTINUING WITH 2 SEALS STILL FUNCTIONING UNTIL REFUELING, t

EfERGENCY TECH SPEC 5/5/81 TO ALLO 4 C1.0SURE OF LOOP ISOLATION VALVES TO CLOSE FROM C0ffTROL ROOM IF fECESSARY.

o itJLTIPE FAlllEE INF0Pl% TION ON TE 73 EVENTS DlSCUSSED AT OPGMTIf6 RFACTOR BRIEFItBS DEC 1980-f%Y 1981 r

If0EPEtEENT FAILURES

  1. FAILURES EALLt)RE RATE 2

5 IN 5 tons 3

1 in 5 tems 4

2 IN 5 tems 1

5 0 IN 5 rems CONSEQUENTIAL FAILURES

  1. CONSEQUEffTIAL FAILURES FAILURE RATE 1

3 in 5 te m s 2

1 IN 5 toss 3

0 in 5 tons 1

4 0 in 5 toss l

3.,_

m

i o 2 s 31 an ei u b, u 3 g aun WWWiViViVIVWi VWWiMMMT%1'4__/WddId_T !./s i

QanO P

g

,P x ~,W g

12/81 a

==$

ciJ TRANSMITTAL TO:

87 Docu:nent Control Des'.,r Cd

~

=id 016 Phillips 4',??.

\\

26

\\

\\

k h-_s ADVANCED COPY TO:

O

~The Public Document Room

m s.

a/

IM DATE:

/

V, b cc: OPS Filek i W From: SErY OPS Scanch

/

/

Cid 3:

=g3 C&R (fiatalie')

c g~

. Attached -are ; copies of a Co=:tission meeting A

transcript /s/ and related meeting document /s/.

They are being forwarded for entry on the Daily Accession 9

List and clacement in the Public Document Room.

No S

other dis'tribution is requested or required.

Existing DCS identification numbers are listed on the individual M,

documents wherever }.nown.

~

~~

E Meeting

Title:

s d // OgM

Ys 9m LA's it

]

Open /

k w

c_$-

MEETII;G DATE:

/ 'l / 2 /

k/

Closed DOS COPIES:

-e gjy

/

/

Copies (1 of each Checked)

L ITEM DESCRIPTIO:i:

Advanced May y

To PDR:

Original be g/ / k1 ~ ~ 4 M Duplicate g d

1.

Docur.en t Dup

  • copy
  • g

=g v

G'

=g

/

g

.f da

$g

2. \\/aw A

-4

/

I

=

u 3M J

Ca>

'"2 3.

g U

W s

=4 4.

g&u n-Cd D

p e

N

=e rs cy s.

c-- J g

c c s; cy

.s

&]

' Verify if in DOS, and h'

lg) ch'ance to "PDR es r c (PDR is advanced one of each docur.ent, two available."

pE-d of each SECY paper.)

g 4

h l!ii f