ML20039G931

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/81-26 on 811101-30 & Notice of Violation
ML20039G931
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/22/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20039G932 List:
References
NUDOCS 8201190318
Download: ML20039G931 (2)


See also: IR 05000267/1981026

Text

.

_

_

_ . _

_ _ _ _ - _ _ _ _

- - - - - -

.

.

. -

,

,

,

.-

--

- - - - -

-

-

-

. _ _

,.

,

~T. 2 -

,

.

nf

a

,

_.

I

1

.

..

.

4

?

,

s

.s

\\

'l -

In Reply Refer To:

DEC 2 2 jgg

o

Docket 50-267/81-26

0

9>

RECEDMD

9

-

Public Service Company of Colorado

g

JAtil 8Jgg y

.

ATTN: Mr. O. R. Lee, Vice President

- u n::m m:mm U

A emt n

Electric Production

i

P. O. Box 840

%

Denver, Colorado

80201

+

-

id

-

,

' Gentlemen:

This refers to the inspection conducted under the ReMdent Inspection Program

by Messrs. M. W. Of ckerson and G. L. Plumlee III.. of this office during the

period November 1-30, 1981, of activities authorized by NRC Operating License

DPR-34, and to discussions of the findings with members of your staff at the

conclusion of the inspection.

Areas examined during the inspection and the findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During this inspection certain of your activities appeared to be in noncompliance

with NRC requirements, as specified in the enclosed Appendix A.

Violation 1 has

been categorized as a Severity Level III violation according to the NRC interim

Enforcement Policy, 45 FR 66754, dated October 7,1980, This Severtty Level

nomally dictates the imposition of a civil penalty. It is our judgement, how-

ever, that since you had originally identified the violation, reported it, and

are taking appropriate corrective and preventative steps, civil action is not

warranted. You are required to respond to these matters in writing in accord-

ance with the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2. Title 10, Code of Federal Regulations. Your response should be based on

the specifics contained in the Notice of Violation enclosed with this letter.

In addition, we are concerned about the implementation of your program for

management control of your licensed activities that permitted a reoccurrence

of the type of violation discussed in Violation 1 of Appendix 4.

Consequently,

in your reply you should describe, in particular, those actions taken or planned

to improve the effectiveness of your management control of the requirements of

your license.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office

by telephone, within 10 days of the date of this letter and submit written

application to withhold infomation contained therein within 30 days of the

date of this letter. Such application must be consistent with the requirements

/CA[

of2.790(b)(1).

e201190318 811222

I C. V

ADR ADOCK 05000267

  • "a

. RPS

,, RPS,1

RP,h

, , , ,Kl'ts

tg

,j,,

,R

- ,,IV ,

,$

,,,

5** % .F ic,e.. Son:ls..GL

e .TWdtixnan.

. .@$ k, .

g.o. ..4 .

1

,

g.

. . ... .. .

..?...

./.YM.N.D................

'

.. . .

..

.. . .. .. .

.. .. . .

.

.

.. .

i

anc conu us no coi sacu ono

OFFICIAL RECORD COPY

- _ _ __ . _ _ _ _ .

_

_

._

_,

._

_ _ __

_ _ - .

__

.

.

.

.

Public Service Company of Colorado

-2-

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Papat.'ork Reduction Act of 1930, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

o n g,nai : .wa be

"

i

o. t. w.:n-

G. L. Madsen, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Peport 50-267/61-26

cc w/ enclosures:

D. W. Warembourg, Nuclear Production Manager

,

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado 80651

J. Gahm, Quality Assurance Manager

1

bcc to DMB: (IE01)

bcc distrib. by RIV:

.

-

BC

Resident Inspector

1

PM

Section Chief #1

AE00

Info Systems

ELD

TIB

IE File

EIB

IE/RPRIB

Colorado State Dept. Health

NRR/DHFS

J. Gagliardo, RIV

NRR/0LB

RAD ASMT BR

RESEARCP

PDR:HQ

LPDR

NSIC

i

NTIS

!

t

,

,

i

0"'C' k

..... . ..... .

. . .. ..

.

..... . . ...

.

. .. . .. . ...

... .

.. ...

... ... ..

.

. . ........ ......

"" "'>

......... ..... .

. ..

. .. .. ....

. .. .. ..... .. .

.. . . ....

.

. .. ...... ..

.

. . .....

.... ... .... ...

">

.. . .....

..

.......

. .....

......... ....... ..

...................

.... ...... . .. .

. . . . . . . . . . . . . .

... . ......... .

"R*"""'"""

' " " " * *

~

OFFICIAL RECORD COPY

..-