ML20039G868

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-206/81-41 on 811207-11.No Noncompliance Noted
ML20039G868
Person / Time
Site: San Onofre 
Issue date: 12/30/1981
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20039G869 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8201190243
Download: ML20039G868 (2)


See also: IR 05000206/1981041

Text

N

~

r

f

T

f

f

fJ

'

-

'

DEC 3 0 1981

i

Docket No. 50-206

i

A

R

Southern California Edison Company

6

'

P. O. Box 800

A

RECEIVED

2244 Walnut Grove Avenue

79

-

,

g}

JANI g 7982h

-

Rosemead, California 91770

Attention: Dr. L. T. Papay, Vice President

    • asM U

.

Advanced Engineering

1

i

//

'

Gentlemen:

1

FG

I

Subject: NRC Inspection

This refers to the routine inspection conducted by Mr. J. W. Hornor of this

office on December 7-11, 1981, of activities authorized by NRC License

No. OPR-13, and to the discussion of our findings held by Mr. J. W. Hornor with

Mr. W. Moody and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

,

'

No itens of noncompliance with NRC requirements were identified within the

scope of this inspection.

.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

l

of the date of this letter. Such application must be consistent with the

requirenents of 2.790(b)(1),

l

l

l

8201190243 811230

DRADOCK05000g

.

j, /-

S

RV/d t

{

l

I

c"<,

I

,

5"' p. . . n t h.#.

.ZWETHG..

STERNBEaG.

.

-

carrH, . ./. 2_ /2/./81 / M3C/81

' /A/30/81

,l,

. .... ..

,

,

, ,

t we rcau aie to sc wcu ano

O FFICI AL R ECOF.D COPY

'"

  • -22*'

,

.

,.

.

.

. - . _ - . - .

.

Southern California Edison Company -2-

DEC 3 01981

_

S.ould you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

LC Lt,(

, JLL

Ld h

E

f

,

D. H. $ternberg, Chief

Reactor Operations Projects Branch

Enclosure:

'

IE Inspection Report

No. 50-206/81-41

cc w/o enclosure:

R. Dietch, SCE

H. B. Ray, SCE (San Cl mente)

bec: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of Cr. (Hahn/ Johnson) (w/c cnc)

,

RHE (w/o enc)

Resident inspector

,

'

\\

,

\\

i

-